IP Library › Granted Patent US 12,049,358
Granted Patent B2
US 12,049,358 · App. 18/063,856 · Granted Jul 30, 2024

Storage systems and methods

Inventors: Paul Clarke (Herts, GB); Andrew John Ingram-Tedd (Herts, GB); Lars Sverker Ture Lindbo (Herts, GB)
Assignee: OCADO INNOVATION LIMITED
B65G1/0464B65G57/03G06F1/3203G06N5/02H04W4/80
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,049,358
App. No.
18/063,856
Granted
Jul 30, 2024
Kind
B2
Abstract

A storage system Includes a first set of parallel rails or tracks and a second set of parallel rails or tracks extending transverse to the first set in a substantially horizontal plane to form a grid pattern having a plurality of grid spaces. A plurality of stackable storage containers are arranged in stacks, the stacks of storage containers being located beneath the rails or tracks. Each stack is located within the footprint of a grid space. A load handling device is arranged to move laterally on the rails or tracks above the stacks of storage containers. The load handling device includes a lifting device arranged to lift storage containers from a top of a stack. The lifting device includes a cable to provide a service from a service source in the load handling device to the one or more storage containers.

Claims (43)

1. A storage system comprising:

a first set of parallel rails or tracks and a second set of parallel rails or tracks extending transverse to the first set in a substantially horizontal plane to form a grid pattern comprising a plurality of grid spaces;

a plurality of stackable storage containers arranged in stacks, the stacks of storage containers being located beneath the rails or tracks, each stack being located within the footprint of a grid space; and

a load handling device arranged to move laterally on the rails or tracks above the stacks of storage containers, the load handling device including a lifting device arranged to lift one or more storage containers of the plurality of storage containers, or parts thereof, from a top of a stack,

wherein the lifting device includes a cable to provide a service from a service source in the load handling device to the one or more storage containers, to be lifted by the load handling device, in use, from the top of the stack.

2. A storage system according to claim 1 , wherein the lifting device comprises a releasable connector adapted to connect the one or more storage containers to be lifted to the service provided from the service source in the load handling device, via the cable.

3. A storage system according to claim 1 , comprising:

an overhead connector connectable to the load handling device to carry the service to the load handling device for connection to the one or more storage containers to be lifted.

4. A storage system according to claim 1 , comprising:

overhead sockets for the load handling device to releasably attach to, such that the service is transmittable, via the load handling device, to the one or more storage containers to be lifted.

5. A storage system according to claim 1 , wherein the load handling device is provided with a connector to an alternative service supply, the alternative service supply forming part of the storage system.

6. A storage system according to claim 5 , wherein the alternative service supply is provided by an uppermost storage container in an adjacent stack to the stack from which the one or more storage containers are to be lifted.

7. A storage system according to claim 1 , comprising:

further load handling devices arranged to:

move laterally on the rails or tracks above the stacks of storage containers;

form a cluster adjacent the load handling device arranged to lift the one or more storage containers; and

provide the service to the load handling device when the one or more storage containers are lifted, in use, from the top of the stack.

8. A storage system according to claim 1 , wherein the service comprises at least one of power, data, signal, nutrients, water, fluid, gas, radiation, lighting, heating, cooling, or other services.

9. A storage system according to claim 1 , wherein each storage container of the plurality of storage containers arranged in the one or more stacks comprises:

a first connector adapted to connect to the lifting device to receive the service from the service source in the load handling device; and

a second connector adapted to connect to the first connector of a storage container below in a given stack of the one or more stacks such, that the service is routable through the storage containers in the given stack.

10. A storage system according to claim 9 , wherein the second connector of each storage container is adapted to connect to a primary service source at a base of the given stack in the storage system, the service source in the load handling device being a secondary service source.

11. A storage system according to claim 1 , wherein the cable is configured to provide multiple services, from multiple corresponding service sources in the load handling device, to the one or more storage containers to be lifted.

12. A method of providing a service to a storage container in a storage system including a first set of parallel rails or tracks and a second set of parallel rails or tracks extending transverse to the first set in a substantially horizontal plane to form a grid pattern including a plurality of grid spaces, a plurality of the storage containers arranged in stacks, the stacks of storage containers being located beneath the rails or tracks, each stack being located within the footprint of a grid space, and a load handling device arranged to move laterally on the rails or tracks above the stacks of storage containers, the load handling device including a lifting device arranged to lift a storage container of the plurality of storage containers, or parts thereof, from the top of a given stack, wherein the method comprising:

providing the lifting device with a cable to provide the service from a service source in the load handling device to the storage container;

positioning the load handling device above the one or more storage containers to be lifted from the given stack;

lowering the lifting device from the load handling device;

releasably connecting the lifting device to the storage container;

supplying the service to the storage container, from the service source in the load handling device, via the cable; and

lifting the storage container from the given stack while the service is supplied via the cable.

13. A method according to claim 12 , comprising:

connecting an overhead connector to the load handling device to carry the service to the load handling device to the storage container to be lifted.

14. A method according to claim 12 , comprising:

releasably attaching the load handling device to overhead sockets, such that the service is transmittable, via the load handling device, to the storage container to be lifted.

15. A method according to claim 12 , comprising:

connecting the load handling device to an alternative service supply forming part of the storage system.

16. A method according to claim 15 , wherein the alternative service supply is provided by an uppermost storage container in an adjacent stack to the stack from which the storage container is to be lifted.

17. A method according to claim 12 , further comprising:

moving further load handling devices on the rails or tracks to form a cluster adjacent the load handling device arranged to lift the storage container to be lifted; and

providing the service to the load handling device when the storage container is lifted, in use, from the top of the stack.

18. A method according to claim 12 , wherein the service comprises at least one of power, data, signal, nutrients, water, fluid, gas, radiation, lighting, heating, cooling, or other services.

19. A method according to claim 12 , comprising:

supplying multiple services, from multiple corresponding service sources in the load handling device, to the storage container to be lifted via the cable.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 9, 2022
From: CLARKE, PAUL; INGRAM-TEDD, ANDREW JOHN; LINDBO, LARS SVERKER TURE
To: OCADO INNOVATION LIMITED
Reel/Frame 062040/0876 →
Priority Claims (1)
GB 1617727 · Oct 19, 2016 · national
Continuity (3)
Continuation 17174020 · Feb 11, 2021
Continuation 16343124
Related Publication 20230108952A1 · Apr 6, 2023
Cited By (3)
US 12,654,936 US 12,715,688 US 12,735,281