IP Library Granted Patent US 12,464,683
Granted Patent B2
US 12,464,683 · App. 18/648,708 · Granted Nov 4, 2025

Containerized HVAC control

Inventors: Ho-June Yu (Suwon, KR); Jeong-Hyun Bang (Seoul, KR); Jong-Sik Park (Suwon, KR)
Assignee: Solaredge Technologies, Ltd.
H05K7/20736H05K7/20145
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,464,683
App. No.
18/648,708
Granted
Nov 4, 2025
Kind
B2
Abstract

Disclosed is a containerized heating, ventilation, and air-conditioning (HVAC) system comprising an HVAC unit and one or more ducts from the HVAC unit to an equipment rack. The ducts prevent mixing between the fresh and exhaust airflow, thus improving efficiency. Sensors located at sources of heat generating equipment within the racks may be used by controllers to monitor temperatures of the components at the source of heat generation, typically at the highest temperatures. The temperatures may be aggregated to determine the temperatures of devices, modules, racks, and the container interior cavity. Dampers on the ducts, at the rack inlets, at the module inlets, at the devices inlets, and such may assist in regulating airflow preferentially to the hottest components, devices, modules, or racks.

Claims (41)

1 . A system comprising:

a shipping container comprising:

a plurality of equipment racks, each comprising a plurality of electrical energy storage modules and a rack damper, each of the plurality electrical energy storage modules comprising one of a plurality of temperature sensors, one of a plurality of current sensors, and one of a plurality of module dampers;

a heating, ventilation, and air-conditioning (HVAC) unit;

a first duct extending continuously from an intake of the HVAC unit to an output of an equipment rack of the plurality of equipment racks thereby preventing exhaust exiting the equipment rack mixing with fresh air entering the equipment rack;

at least one rack temperature sensor located within each of the plurality of equipment racks; and

a controller, configured to:

monitor temperature values from the at least one rack temperature sensor; and control an operation of the HVAC unit, the control comprising:

operating the HVAC unit in a heating mode when a temperature value of the temperature values is less than a temperature setpoint minus a heating response temperature value, or

operating the HVAC unit in a cooling mode when the temperature value of the temperature values is greater than the temperature setpoint plus a cooling response temperature value,

the first duct comprising a first end abutting the output and a second end abutting the intake, the first duct comprising a single section or element, the rack damper and the plurality of module dampers being controlled based on temperature measurements from respective sensors of the plurality of temperature sensors,

the plurality of current sensors monitoring current flow direction and current flow magnitude, heat generation and temperature increase of the plurality of electrical energy storage modules being calculated from a measurement of an electrical current.

2 . The system of claim 1 , wherein the controller further comprises:

setting the HVAC unit to a heating mode when the temperature value of the temperature values is less than the temperature setpoint value,

setting the HVAC unit to a cooling mode when the temperature value of the temperature values is greater than the temperature setpoint value, or

setting the HVAC unit to a ventilation mode when the temperature value of the temperature values is equal to the temperature setpoint value,

and the setting of the HVAC unit is performed before the operating of the HVAC unit.

3 . The system of claim 1 , further comprising a second duct extending continuously from an output of the HVAC unit to an intake of the each of the plurality of equipment racks, the second duct comprising a single section or element.

4 . The system of claim 3 , wherein the second duct comprises a third end abutting the output of the HVAC unit and a fourth end abutting the intake of the each of the plurality of equipment racks.

5 . The system of claim 1 , further comprising at least one damper configured for regulating an airflow through the first duct.

6 . The system of claim 1 , wherein each of the at least one rack temperature sensor is incorporated in a module of the each of the plurality of equipment racks.

7 . The system of claim 1 , wherein each of the at least one rack temperature sensor is incorporated in a device of the each of the plurality of equipment racks.

8 . The system of claim 1 , wherein each of the at least one rack temperature sensor is incorporated in a component of the each of the plurality of equipment racks.

9 . The system of claim 1 , wherein the rack damper is configured for regulating an airflow through the first duct, and wherein the controller is further configured to control a position of the rack damper based on a difference between the temperature value of the each of the plurality of equipment racks and the temperature setpoint value.

10 . The system of claim 6 , wherein the controller is further configured for controlling an operation of the plurality of module dampers in the each of the plurality of equipment racks based on a comparison of the temperature values of the each of the plurality of electrical energy storage modules to the temperature setpoint value.

11 . A method comprising:

monitoring a plurality of temperature values using a plurality of temperature sensors located in each of a plurality of electrical energy storage modules, each of the plurality of electrical energy storage modules located in one of a plurality of equipment racks, the plurality of equipment racks being located inside a shipping container;

controlling an HVAC unit integrated with the shipping container; controlling a plurality of module dampers, one in the each of the plurality of electrical energy storage modules, and a rack damper, one in each of the plurality of equipment racks, based on the plurality of temperature values; and

controlling an operation of the HVAC unit, the controlling comprising:

operating the HVAC unit in a heating mode when a temperature value of the temperature values is less than a setpoint temperature minus a heating response temperature value, or

operating the HVAC unit in a cooling mode when the temperature value of the temperature values is greater than the setpoint temperature plus a cooling response temperature value,

a first duct extending continuously from an intake of the HVAC unit to an output of the each of the plurality of equipment racks thereby preventing exhaust exiting the plurality equipment racks mixing with fresh air entering the plurality of equipment racks, the first duct comprising a first end abutting the output and a second end abutting the intake, the first duct comprising a single section or element,

the plurality electrical energy storage modules further comprising one of a plurality of current sensors,

the plurality of current sensors monitoring current flow direction and current flow magnitude, heat generation and temperature increase of the plurality of electrical energy storage modules being calculated from a measurement of an electrical current.

12 . The method of claim 11 , further comprising a second duct extending continuously from an output of the HVAC unit to an intake of the each of the plurality of equipment racks, the second duct comprising a single section or element.

13 . The method of claim 12 , wherein the second duct comprises a third end abutting the output of the HVAC unit and a fourth end abutting the intake of the each of the plurality of equipment racks.

14 . The method of claim 11 , wherein a rack temperature sensor is incorporated in a module of the each of the plurality of equipment racks.

15 . The method of claim 11 , wherein a rack temperature sensor is incorporated in a device of the each of the plurality of equipment racks.

16 . The method of claim 11 , wherein a rack temperature sensor is incorporated in a component of the each of the plurality of equipment racks.

17 . The method of claim 11 , further comprising regulating an airflow through the first duct by controlling the rack damper or at least one of the plurality of module dampers.

18 . The method of claim 11 , further comprising regulating an airflow through the first duct by controlling a position of the rack damper or at least one of the plurality of module dampers based on a difference between the plurality of temperature values and a temperature setpoint value.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2025
From: YU, HO-JUNE; BANG, JEONG-HYUN; PARK, JONG-SIK
To: KOKAM CO., LTD.
Reel/Frame 071814/0616 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2025
From: SOLAREDGE TECHNOLOGIES KOREA LIMITED COMPANY
To: SOLAREDGE TECHNOLOGIES LTD.
Reel/Frame 071814/0651 →
CHANGE OF NAME Recorded Jul 24, 2025
From: KOKAM CO., LTD.
To: SOLAREDGE TECHNOLOGIES KOREA LIMITED COMPANY
Reel/Frame 072209/0344 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 28, 2025
From: SOLAREDGE TECHNOLOGIES KOREA LIMITED COMPANY
To: SOLAREDGE TECHNOLOGIES LTD.
Reel/Frame 071238/0190 →
Continuity (3)
Continuation 17132856 · Dec 23, 2020
Provisional Application 62954220 · Dec 27, 2019
Related Publication 20240349460A1 · Oct 17, 2024
References Cited (56)
US 6298912B1 · Rayburn et al. · 2001 [cited by applicant]
US 6574104B2 · Patel et al. · 2003 [cited by applicant]
US 7867070B2 · Day · 2011 [cited by applicant]
US 7916487B2 · Bitton et al. · 2011 [cited by applicant]
US 8593815B2 · Claassen et al. · 2013 [cited by applicant]
US 8885335B2 · Magarelli · 2014 [cited by examiner]
US 9847654B2 · Beaston · 2017 [cited by applicant]
US 10039212B2 · Slessman · 2018 [cited by applicant]
US 10136561B2 · Clidaras et al. · 2018 [cited by applicant]
US 10285304B1 · Lin · 2019 [cited by applicant]
US 10368466B1 · Frink et al. · 2019 [cited by applicant]
US 11096316B1 · Lachapelle · 2021 [cited by applicant]
US 20020108386A1 · Spinazzola et al. · 2002 [cited by applicant]
US 20080062647A1 · Hillis et al. · 2008 [cited by applicant]
US 20080280192A1 · Drozdz et al. · 2008 [cited by applicant]
US 20100170277A1 · Schmitt · 2010 [cited by examiner]
US 20110245981A1 · Refai-Ahmed · 2011 [cited by examiner]
US 20120101648A1 · Federspiel · 2012 [cited by examiner]
US 20120190292A1 · Skrepcinski et al. · 2012 [cited by applicant]
US 20120222851A1 · Arinez et al. · 2012 [cited by applicant]
US 20120271935A1 · Moon · 2012 [cited by applicant]
US 20120302150A1 · Schmitt et al. · 2012 [cited by applicant]
US 20140118924A1 · Magarelli · 2014 [cited by applicant]
US 20140206272A1 · Kodama · 2014 [cited by applicant]
US 20140238639A1 · Ambriz et al. · 2014 [cited by applicant]
US 20150088314A1 · Dasari et al. · 2015 [cited by applicant]
US 20150250076A1 · Kondo · 2015 [cited by applicant]
US 20150264837A1 · Clidaras et al. · 2015 [cited by applicant]
US 20170201077A1 · Hafner et al. · 2017 [cited by applicant]
US 20170288184A1 · Schnakofsky et al. · 2017 [cited by applicant]
US 20170365893A1 · Kim et al. · 2017 [cited by applicant]
US 20180352683A1 · Karrat et al. · 2018 [cited by applicant]
US 20190104649A1 · Clidaras et al. · 2019 [cited by applicant]
US 20190195528A1 · Puranen et al. · 2019 [cited by applicant]
US 20190343024A1 · Graham et al. · 2019 [cited by applicant]
US 20210100135A1 · Gao · 2021 [cited by applicant]
CN 2513946Y · 2002 [cited by applicant]
CN 201820865U · 2011 [cited by applicant]
CN 109546261A · 2019 [cited by applicant]
CN 209150734U · 2019 [cited by applicant]
CN 110137618A · 2019 [cited by applicant]
CN 113056163A · 2021 [cited by applicant]
EP 2079000A2 · 2009 [cited by applicant]
WO 2019075294A1 · 2019 [cited by applicant]
May 25, 2021—Partial European Search Report—EP 20217005.6. [cited by applicant]
GForce IR In Row Cooling Unit—Chilled Water, Air and Water/Glycol Cooled Units—Installation, Operation & Maintenance Manual, Data Aire, Inc. [cited by applicant]
A. Bhatia, “HVAC Cooling Systems for Data Centers,” Continuing Education and Development, Inc. [cited by applicant]
“Flexible, high efficiency cooling solutions,” Data Centre, Airedale International Air Conditioning Limited. [cited by applicant]
Atsushi Honzawa et al., “Container-type Energy Storage System with Grid Stabilization Capability,” Hitachi Review, vol. 63, No. 7, pp. 432-437, 2014. [cited by applicant]
A. H. Khalaj & S. K. Halgamuge, “A Review on efficient thermal management of air- and liquid-cooled data centers: From chip to the cooling system,” Applied Energy, 205, pp. 1165-1188, Nov. 2017. [cited by applicant]
B. Shabani & M. Biju, “Theoretical Modelling Methods for Thermal Management of Batteries,” Energies, 8, pp. 10153-10177, Sep. 2017. [cited by applicant]
1U rack mount cluster chassis servers MyriNet clustering connectivity, The CCSI Clusteron, retrieved from www.clusteron.com/cooling.htm. [cited by applicant]
“New HCS Integrates with Third-Party Manufacturers' Enclosures,” Wright Line An Eaton Brand, retrieved from www.wrightline.com/news_and_events/newsitem.html?id=134306. [cited by applicant]
Airedale International Air Conditioning Limited Product Guide. [cited by applicant]
Patch Panel, Equipment Rack, Server Rack, and Computer Rack Products, L-com Global Connectivity, retrieved from www.l-com.com/patch-panel-server-rack. [cited by applicant]
Sep. 13, 2024—Chinese Office Action—CN App. No. 202011584758.6. [cited by applicant]