IP Library › Granted Patent US 12,577,859
Granted Patent B2
US 12,577,859 · App. 18/678,911 · Granted Mar 17, 2026

Interventions to boost well performance in geothermal systems

Inventors: Abdul Muqtadir Khan (Sugar Land, TX); Ashley Bernard Johnson (Cambridge, GB); Benoit Deville (Sugar Land, TX); Isaac Aviles (Sugar Land, TX); Santiago Hassig Fonseca (Sugar Land, TX); Richard L. Christie (Sugar Land, TX)
Assignee: Schlumberger Technology Corporation
E21B43/12E21B43/11E21B43/26E21B49/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,577,859
App. No.
18/678,911
Granted
Mar 17, 2026
Kind
B2
Abstract

Methods are provided for extracting thermal energy from a geothermal reservoir having at least one feature extending therethrough, which involve drilling or accessing a production well that intersects the at least one feature, wherein the at least one feature provides a flow path of pressurized geothermal fluid into the production well. Subsurface data can be analyzed to determine position of the at least one feature in the production well. One or more interventions, or combinations of interventions, can be performed to open the feature or otherwise enhance the flow rate of pressurized geothermal fluid carried by the feature into the production well. The intervention(s) can be performed on multiple features that connect to the production well. The method can also be applied to multiple production wells.

Claims (19)

1 . A method for extracting thermal energy from a geothermal reservoir having a feature that extends through the geothermal reservoir, the method comprising:

analyzing subsurface data to determine a first intersection of the feature with a production well in the geothermal reservoir, wherein the feature provides a flow path of geothermal fluid into the production well;

performing a first intervention at a first position in the production well that corresponds to the first intersection, wherein the first intervention is configured to increase a first flow rate of the geothermal fluid from the feature into the production well, and wherein the first intervention comprises perforating the production well with one of an abrasive fluid jetting tool and an explosive charge; and

performing a second intervention at the first position in the production well, wherein the second intervention comprises stimulating the production well with one of a hydraulic fracturing tool and an acidizing tool.

2 . The method of claim 1 , comprising setting one or more packers within less than 15 feet of the feature prior to performing the second intervention.

3 . The method of claim 1 , wherein a first radial length of the first intervention is less than approximately 5 feet, and wherein a second radial length of the second intervention is greater than the first radial length.

4 . The method of claim 1 , comprising drilling a sidetrack from the production well to intersect the feature, wherein the sidetrack comprises a second intersection with the feature, and the second intersection is configured to increase the first flow rate of the geothermal fluid from the feature into the production well.

5 . The method of claim 4 , comprising performing a third intervention at a second position in the production well that corresponds to the second intersection, wherein the third intervention is configured to increase a second flow rate of the geothermal fluid from the feature into the sidetrack.

6 . The method of claim 1 , wherein the production well comprises a tubular completion component at or near the first intersection of the feature, and the first intervention comprises opening an aperture through the tubular completion component to the feature.

7 . A method for extracting thermal energy from a geothermal reservoir having a plurality of features that extend through the geothermal reservoir, the method comprising:

analyzing subsurface data to determine a first intersection of a first feature with a production well in the geothermal reservoir;

analyzing the subsurface data to determine a second intersection of a second feature with the production well in the geothermal reservoir, wherein the first feature and the second feature provide respective flow paths of geothermal fluid into the production well; and

performing an intervention on at least one of the first intersection and the second intersection,

wherein the intervention is configured to increase a flow rate of the geothermal fluid into the production well,

wherein performing the intervention on at least one of the first intersection and the second intersection comprises performing a first intervention at a first position in the production well that corresponds to the first intersection, and performing a second intervention at a second position in the production well that corresponds to the second intersection, and

wherein the first intervention comprises perforating a tubular completion component and the second intervention comprises perforating an open wellbore.

8 . The method of claim 7 , comprising performing a third intervention at the first position in the production well that is different than the first intervention, and performing a fourth intervention at the second position in the production well that is different than the second intervention.

9 . The method of claim 7 , wherein performing the intervention comprises positioning a downhole tool to perform the first intervention within an accuracy tolerance of the first intersection, wherein the accuracy tolerance is less than 1 foot.

10 . The method of claim 7 , comprising setting one or more packers within less than 15 feet of the first intersection or the second intersection to isolate the respective intersection prior to performing the respective intervention at the respective intersection.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 23, 2026
From: KHAN, ABDUL MUQTADIR; JOHNSON, ASHLEY BERNARD; DEVILLE, BENOIT; AVILES, ISAAC; HASSIG FONSECA, SANTIAGO; CHRISTIE, RICHARD L.
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 073557/0618 →
Continuity (3)
Continuation In Part 18479187 · Oct 2, 2023
Provisional Application 63504797 · May 30, 2023
Related Publication 20240401445A1 · Dec 5, 2024
References Cited (80)
US 2896718A · Kibby · 1959 [cited by examiner]
US 3642068A · Fitch · 1972 [cited by applicant]
US 3878884A · Raleigh · 1975 [cited by examiner]
US 3918524A · Broaddus · 1975 [cited by examiner]
US 4047569A · Tagirov · 1977 [cited by examiner]
US 4223729A · Foster · 1980 [cited by applicant]
US 5785133A · Murray · 1998 [cited by examiner]
US 6644407B2 · Arnold, III · 2003 [cited by examiner]
US 7828063B2 · Olsen · 2010 [cited by examiner]
US 8685187B2 · Han · 2014 [cited by applicant]
US 8820075B2 · Kaminsky · 2014 [cited by examiner]
US 9726157B2 · Sweatman · 2017 [cited by examiner]
US 10260778B2 · Sønju · 2019 [cited by applicant]
US 10551091B2 · Kruger · 2020 [cited by applicant]
US 11220882B2 · Nevison · 2022 [cited by examiner]
US 11434740B1 · Ngyuen · 2022 [cited by applicant]
US 11473410B1 · Batarseh · 2022 [cited by applicant]
US 11795365B1 · Nguyen · 2023 [cited by applicant]
US 11808121B2 · Norbeck · 2023 [cited by examiner]
US 11959666B2 · Fleckenstein · 2024 [cited by examiner]
US 11976236B2 · Evans · 2024 [cited by examiner]
US 12104828B2 · Geiser · 2024 [cited by applicant]
US 12258945B2 · Messner · 2025 [cited by applicant]
US 12292212B2 · Barree · 2025 [cited by examiner]
US 12305893B1 · Alcantar · 2025 [cited by examiner]
US 12435705B2 · Khan · 2025 [cited by examiner]
US 12449163B2 · Johnson · 2025 [cited by examiner]
US 20060102343A1 · Skinner · 2006 [cited by applicant]
US 20090242198A1 · Evans · 2009 [cited by applicant]
US 20100032156A1 · Petty · 2010 [cited by examiner]
US 20100294494A1 · Hefley · 2010 [cited by applicant]
US 20100307756A1 · Jung · 2010 [cited by examiner]
US 20110234421A1 · Smith · 2011 [cited by applicant]
US 20130292177A1 · Meurer · 2013 [cited by applicant]
US 20140262256A1 · Zemach · 2014 [cited by applicant]
US 20150204174A1 · Kresse · 2015 [cited by applicant]
US 20150233218A1 · Myhre · 2015 [cited by applicant]
US 20150275638A1 · Wang · 2015 [cited by applicant]
US 20150300327A1 · Sweatman · 2015 [cited by applicant]
US 20170321934A1 · Kruger · 2017 [cited by applicant]
US 20180016895A1 · Weng · 2018 [cited by applicant]
US 20180080309A1 · Althoff · 2018 [cited by applicant]
US 20180202266A1 · Holland · 2018 [cited by applicant]
US 20180266225A1 · Kemick · 2018 [cited by applicant]
US 20190316455A1 · Surjaatmadja · 2019 [cited by applicant]
US 20200217181A1 · Norbeck · 2020 [cited by applicant]
US 20200277528A1 · Taylor · 2020 [cited by applicant]
US 20210363866A1 · Al-Nakhli · 2021 [cited by applicant]
US 20220325920A1 · Barral · 2022 [cited by applicant]
US 20230045716A1 · Normann · 2023 [cited by applicant]
US 20230064121A1 · Xia · 2023 [cited by applicant]
US 20230083056A1 · Acuna Cespedes · 2023 [cited by examiner]
US 20230288099A1 · Toews · 2023 [cited by applicant]
US 20240035710A1 · Toews · 2024 [cited by applicant]
US 20240069238A1 · Arshad · 2024 [cited by examiner]
US 20240167731A1 · Liang · 2024 [cited by examiner]
US 20240280295A1 · Olorode · 2024 [cited by examiner]
US 20240401450A1 · Johnson · 2024 [cited by applicant]
US 20240401572A1 · Khan · 2024 [cited by examiner]
US 20240418412A1 · Barree · 2024 [cited by examiner]
US 20250109891A1 · Johnson · 2025 [cited by examiner]
US 20250290377A1 · Hassig Fonseca · 2025 [cited by applicant]
CN 105840146A · 2016 [cited by applicant]
CN 108756843A · 2018 [cited by applicant]
CN 111043780A · 2020 [cited by applicant]
CN 111520924A · 2020 [cited by applicant]
CN 112012709A · 2020 [cited by applicant]
CN 213898935U · 2021 [cited by applicant]
CN 113863914A · 2021 [cited by applicant]
CN 120043261A · 2025 [cited by applicant]
JP 2015121093A · 2015 [cited by applicant]
WO 2021078766A1 · 2021 [cited by applicant]
WO 2022055947A1 · 2022 [cited by applicant]
Al-Nakhli, A. R., “Chemically-Induced Pressure Pulse: A New Fracturing Technology for Unconventional Reservoirs”, SPE-172551-MS, presented at the SPE Middle East Oil Gas Show and Conference, Manama, Bahrain, 2015. [cited by applicant]
Search Report and Written Opinion of International Patent Application No. PCT/US2024/031345 dated Sep. 10, 2024, 11 pages. [cited by applicant]
Combined Search and Exam Report issued in United Kingdom Patent Application No. GB2400296.6 dated Feb. 5, 2024, 5 pages. [cited by applicant]
Extended Search Report issued in European Patent Application No. 24204106.9 dated Jan. 24, 2025, 6 pages. [cited by applicant]
Search Report and Written Opinion of International Patent Application No. PCT/US2024/031687 dated Sep. 24, 2024, 13 pages. [cited by applicant]
Search Report and Written Opinion of International Patent Application No. PCT/US2024/031699 dated Sep. 12, 2024, 12 pages. [cited by applicant]
Office Action issued in U.S. Appl. No. 18/678,978 dated Jan. 23, 2025, 18 pages. [cited by applicant]