IP Library Granted Patent US 12,665,545
Granted Patent B2
US 12,665,545 · App. 18/940,679 · Granted Jun 23, 2026

Solar forecasting for networked power plants

Inventors: Lukas Hansen (El Dorado Hills, CA); Gautham Ramesh (San Francisco, CA); Thomas Buttgenbach (Los Angeles, CA)
Assignee: 1st Avenue Nova, LLC
H02S50/00H02J3/004H02J3/381H02J13/10H02J2101/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,665,545
App. No.
18/940,679
Filed
Nov 7, 2024
Granted
Jun 23, 2026
Kind
B2
Art Unit
2836
USPC
307/84
Abstract

A method may include obtaining irradiance data at a first time and a second time from sensors, determining whether one or more solar modules of a plurality of networked power plants will be covered by a shadow or shade at a third time based on the irradiance data, and generating, based on the determination, a power output prediction for each power plant of the networked power plants at the third time. The method may further include receiving power delivery profiles for first and second loads, adjusting a power output of one or more power plants of the networked power plants based at least in part on the power output prediction and the power delivery profiles for the first and second loads, and allocating a combined power output of the power plants to the first and second loads based on first and second load reliability thresholds.

Claims (39)

1 . A non-transitory, processor-readable medium storing instructions that, when executed by a processor, cause the processor to:

set a power output for a first renewable energy power plant (REPP) and a power output for a second REPP based at least in part on a power delivery profile for a first load and a power delivery profile for a second load, the power output for the first REPP and the power output for the second REPP collectively defining a combined power output;

identify a first desired allocation of the combined power output for the first load and a second desired allocation of the combined power output for the second load;

at least one of:

cause transmission of a signal representing the first desired allocation to the first load, or

cause transmission of a signal representing the second desired allocation to the second load; and

cause delivery, during a time period, of the combined power output to a grid.

2 . The non-transitory, processor-readable medium of claim 1 , further storing instructions to cause the processor to record a difference between the first desired allocation and a total amount of power received at the first load from the grid during the time period.

3 . The non-transitory, processor-readable medium of claim 1 , further storing instructions to cause the processor to:

record a difference between the first desired allocation and a total amount of power received at the first load from the grid during the time period; and

record a difference between the second desired allocation and a total amount of power received at the second load from the grid during the time period.

4 . The non-transitory, processor-readable medium of claim 3 , further storing instructions to cause the processor to calculate an energy request based on at least one of (1) the difference between the first desired allocation and the total amount of power received at the first load from the grid during the time period, or (2) the difference between the second desired allocation and the total amount of power received at the second load from the grid during the time period.

5 . The non-transitory, processor-readable medium of claim 1 , wherein the instructions to cause delivery of the combined power output to the grid include instructions to increase a discharge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

6 . The non-transitory, processor-readable medium of claim 1 , wherein the instructions to cause delivery of the combined power output to the grid include instructions to decrease a charge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

7 . A non-transitory, processor-readable medium storing instructions that, when executed by a processor, cause the processor to:

set a power output for a first renewable energy power plant (REPP) and a power output for a second REPP based at least in part on a power delivery profile for a first load and a power delivery profile for a second load, the power output for the first REPP and the power output for the second REPP collectively defining a combined power output;

identify a first desired allocation of the combined power output for the first load and a second desired allocation of the combined power output for the second load;

cause transmission of at least one of: (1) a signal representing the first desired allocation to the first load, or (2) a signal representing the second desired allocation to the second load;

cause delivery, during a time period, of a first portion of the combined power output to a grid and not to the second load; and

cause delivery, during the time period, of a second portion of the combined power output to the second load and not to the grid.

8 . The non-transitory, processor-readable medium of claim 7 , wherein the instructions to identify the first desired allocation of the combined power output for the first load and the second desired allocation of the combined power output for the second load include instructions to identify the first desired allocation and the second desired allocation based on a ranking of the first load and the second load.

9 . The non-transitory, processor-readable medium of claim 7 , wherein the instructions to identify the first desired allocation of the combined power output for the first load and the second desired allocation of the combined power output for the second load include instructions to identify the first desired allocation and the second desired allocation based on power usage predictions for the first load and the second load.

10 . The non-transitory, processor-readable medium of claim 7 , further storing instructions to cause the processor to record a difference between the first desired allocation and a total amount of power received at the first load from the grid during the time period.

11 . The non-transitory, processor-readable medium of claim 7 , further storing instructions to cause the processor to record a difference between the second desired allocation and a total amount of power received at the second load during the time period.

12 . The non-transitory, processor-readable medium of claim 7 , wherein the instructions to cause delivery of the first portion of the combined power output to the grid

include instructions to increase a discharge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

13 . The non-transitory, processor-readable medium of claim 7 , wherein the instructions to cause delivery of the second portion of the combined power output to the second load include instructions to increase a discharge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

14 . The non-transitory, processor-readable medium of claim 7 , wherein the instructions to cause delivery of the first portion of the combined power output to the grid include instructions to decrease a charge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

15 . A non-transitory, processor-readable medium storing instructions that, when executed by a processor, cause the processor to:

define a combined power output that is associated with (1) a first renewable energy power plant (REPP) and (2) a second REPP, based at least in part on a power delivery profile for a first load and a power delivery profile for a second load;

cause transmission of at least one of: (1) a signal representing a first desired allocation of the combined power output to the first load, or (2) a signal representing a second desired allocation of the combined power output to the second load;

cause delivery, during a time period, of a first portion of the combined power output to a grid; and

cause delivery, during the time period, of a second portion of the combined power output to one of the first load or the second load.

16 . The non-transitory, processor-readable medium of claim 15 , further storing instructions to cause the processor to record a difference between the first desired allocation and a total amount of power received at the first load from the at least one of the first REPP or the second REPP during the time period.

17 . The non-transitory, processor-readable medium of claim 15 , further storing instructions to cause the processor to record a difference between the second desired allocation and a total amount of power received at the second load during the time period.

18 . The non-transitory, processor-readable medium of claim 15 , wherein the instructions to cause delivery of the first portion of the combined power output to the grid

include instructions to increase a discharge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

19 . The non-transitory, processor-readable medium of claim 15 , wherein the instructions to cause delivery of the combined power output to the grid include instructions to decrease a charge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

20 . The non-transitory, processor-readable medium of claim 15 , wherein the instructions to cause delivery of the second portion of the combined power output to the one of the first load or the second load include instructions to increase a discharge of an energy storage system (ESS) of at least one of the first REPP or the second REPP.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 11, 2024
From: BUTTGENBACH, THOMAS
To: 8 ME NOVA, LLC
Reel/Frame 069202/0228 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 11, 2024
From: HANSEN, LUKAS; RAMESH, GAUTHAM
To: 8 ME NOVA, LLC
Reel/Frame 069202/0332 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 11, 2024
From: 8 ME NOVA, LLC
To: 1ST AVENUE NOVA, LLC
Reel/Frame 069202/0368 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 11, 2024
From: HANSEN, LUKAS; RAMESH, GAUTHAM; BUTTGENBACH, THOMAS
To: 8 ME NOVA, LLC
Reel/Frame 069202/0371 →
Continuity (4)
Continuation PCTUS2023013968 · Feb 27, 2023
Continuation 17879270 · Aug 2, 2022
Continuation In Part 17742980 · May 12, 2022
Related Publication 20250150031A1 · May 8, 2025
References Cited (54)
US 9438041B2 · Roy et al. · 2016 [cited by applicant]
US 9945264B2 · Wichmann et al. · 2018 [cited by applicant]
US 10331089B2 · Khabibrakhmanov et al. · 2019 [cited by applicant]
US 10409925B1 · Hoff · 2019 [cited by applicant]
US 10756543B2 · Detmers et al. · 2020 [cited by applicant]
US 11063554B1 · Hansen et al. · 2021 [cited by applicant]
US 11381090B2 · Srinivasan et al. · 2022 [cited by applicant]
US 11451191B1 · Hansen et al. · 2022 [cited by applicant]
US 11489491B1 · Hansen · 2022 [cited by examiner]
US 11588438B2 · Hansen et al. · 2023 [cited by applicant]
US 11588439B1 · Hansen et al. · 2023 [cited by applicant]
US 11611217B1 · Buttgenbach · 2023 [cited by examiner]
US 11689155B1 · Hansen et al. · 2023 [cited by applicant]
US 11848560B2 · Buttgenbach · 2023 [cited by applicant]
US 11923682B1 · Kanan · 2024 [cited by examiner]
US 12244147B1 · Buttgenbach · 2025 [cited by examiner]
US 20100293045A1 · Burns et al. · 2010 [cited by applicant]
US 20110276269A1 · Hummel · 2011 [cited by applicant]
US 20140200723A1 · Roy et al. · 2014 [cited by applicant]
US 20160172859A1 · Marhoefer · 2016 [cited by applicant]
US 20170014449A1 · Bangera et al. · 2017 [cited by applicant]
US 20170104449A1 · Drees · 2017 [cited by applicant]
US 20170331292A1 · Rive et al. · 2017 [cited by applicant]
US 20170358929A1 · Koeppe et al. · 2017 [cited by applicant]
US 20180210976A1 · Goyal et al. · 2018 [cited by applicant]
US 20180232557A1 · Chang et al. · 2018 [cited by applicant]
US 20190204405A1 · Arliaud et al. · 2019 [cited by applicant]
US 20210285415A1 · Vamvas · 2021 [cited by applicant]
US 20220311379A1 · Hansen et al. · 2022 [cited by applicant]
US 20220376655A1 · Hansen et al. · 2022 [cited by applicant]
US 20220407454A1 · Hansen et al. · 2022 [cited by applicant]
US 20230038773A1 · Hansen et al. · 2023 [cited by applicant]
US 20230198464A1 · Hansen et al. · 2023 [cited by applicant]
US 20230369866A1 · Buttgenbach · 2023 [cited by applicant]
CN 112086998A · 2020 [cited by applicant]
WO WO2023219696A1 · 2023 [cited by applicant]
Final Office Action for U.S. Appl. No. 17/742,980, by Buttgenbach, mailed Sep. 23, 2022; 11 pages. [cited by applicant]
Final Office Action for U.S. Appl. No. 18/119,067, by Buttgenbach, mailed Aug. 23, 2023; 8 pages. [cited by applicant]
International Preliminary Report on Patentability for International Application No. PCT/US2023/013968, by 8ME Nova, LLC, mailed Nov. 21, 2024; 8 pages. [cited by applicant]
International Search Report and Written Opinion for International Application No. PCT/US2023/013968, by 8ME Nova, LLC, mailed Jun. 7, 2023; 10 pages. [cited by applicant]
Non-Final Office Action for U.S. Appl. No. 17/742,980, by Buttgenbach, mailed Aug. 5, 2022; 9 pages. [cited by applicant]
Non-Final Office Action for U.S. Appl. No. 17/898,982, by Hansen et al., mailed Nov. 28, 2022; 9 pages. [cited by applicant]
Non-Final Office Action for U.S. Appl. No. 18/119,067, by Buttgenbach, mailed Jun. 29, 2023; 7 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/210,399, by Hansen et al., mailed May 17, 2021; 8 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/344,706, by Hansen et al., mailed Aug. 18, 2022; 2 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/344,706, by Hansen et al., mailed Aug. 3, 2022; 7 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/742,980, by Buttgenbach, mailed Feb. 8, 2023; 10 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/879,270, by Hansen et al., mailed Oct. 4, 2022; 2 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/879,270, by Hansen et al., mailed Sep. 22, 2022; 7 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/898,982, by Hansen et al., mailed Jan. 18, 2023; 7 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 17/972,863, by Hansen et al., mailed Jan. 17, 2023; 7 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 18/104,036, by Hansen et al., mailed Apr. 26, 2023; 7 pages. [cited by applicant]
Notice of Allowance for U.S. Appl. No. 18/119,067, by Buttgenbach, mailed Nov. 3, 2023; 7 pages. [cited by applicant]
United States Environmental Protection Agency (EPA) et al., “Guide to Purchasing Green Power: Renewable Electricity, Renewable Energy Certificates, and On-Site Renewable Generation,” Office of Air (6202J) EPA430-K-04-01… [cited by applicant]