IP Library › Granted Patent US 12,498,865
Granted Patent B1
US 12,498,865 · App. 19/173,788 · Granted Dec 16, 2025

Systems and methods for data management based on industrial internet of things (IIoT) data centers

Inventor: Hanshu Shao (Chengdu, CN)
Assignee: CHENGDU QINCHUAN IOT TECHNOLOGY CO., LTD.
G06F3/0629G06F3/0608G06F3/067G16Y40/35H04L43/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,498,865
App. No.
19/173,788
Granted
Dec 16, 2025
Kind
B1
Abstract

Provide are a system and a method for data management based on an Industrial IIoT data center. The system includes an IIoT user platform, an IIoT service platform, an IIoT management platform, an IIoT sensor network platform, and an IIoT sensing and control platform. The IIoT management platform is configured to: determine a future acquisition parameter of a sensor network sub-platform based on a remaining storage space, a first retrieval feature, and a future retrieval feature; determine a pre-increment storage capacity based on the future acquisition parameter; determine a group to be deleted based on the pre-increment storage capacity, the remaining storage space, and a group retrieval feature and a group data volume corresponding to each of a plurality of data groups; generate a parameter update instruction based on the future acquisition parameter; and generate a data deletion instruction based on the group to be deleted.

Claims (48)

1 . A system for data management based on an Industrial Internet of Things (IIoT) data center, the system comprising an IIoT user platform, an IIoT service platform, an IIoT management platform, an IIoT sensor network platform, and an IIoT sensing and control platform; wherein

the IIoT management platform includes the IIoT data center, the IIoT sensor network platform includes a plurality of sensor network sub-platforms and a plurality of sensor network sub-databases, each of the plurality of sensor network sub-databases corresponding to one of the plurality of sensor network sub-platforms,

the IIoT management platform is configured to:

every first predetermined cycle, for a sensor network sub-platform among the plurality of sensor network sub-platforms:

determine a future acquisition parameter of the sensor network sub-platform based on a remaining storage space, a first retrieval feature, and a future retrieval feature of the sensor network sub-database corresponding to the sensor network sub-platform, wherein the first retrieval feature refers to a retrieval feature of the sensor network sub-database during a predetermined historical period, the future retrieval feature refers to a retrieval feature of the sensor network sub-database in a predetermined future period, and the retrieval feature refers to data that characterizes an access status of the sensor network sub-database;

determine a pre-increment storage capacity of the sensor network sub-database based on the future acquisition parameter;

partition data items in the sensor network sub-database to obtain a plurality of data groups;

determine a group to be deleted based on the pre-increment storage capacity, the remaining storage space, and a group retrieval feature and a group data volume corresponding to each of the plurality of data groups;

generate a parameter update instruction based on the future acquisition parameter, and send the parameter update instruction to the sensor network sub-platform to control the sensor network sub-platform to perform data acquisition based on the future acquisition parameter; and

generate a data deletion instruction based on the group to be deleted, and send the data deletion instruction to the sensor network sub-platform to control the sensor network sub-platform to delete the group to be deleted.

2 . The system of claim 1 , wherein the IIoT management platform is further configured to:

obtain a plurality of associated sub-platforms of the sensor network sub-platform; and

determine the future retrieval feature based on first storage data corresponding to each of the plurality of associated sub-platforms.

3 . The system of claim 2 , wherein the IIoT management platform is further configured to:

determine a plurality of associated platform groups and intra-group association degrees corresponding to the plurality of associated platform groups based on a second retrieval feature corresponding to each of the plurality of sensor network sub-platforms;

determine the plurality of associated sub-platforms based on the plurality of associated platform groups; and

determine the future retrieval feature based on an intra-group association degree corresponding to each of the plurality of associated sub-platforms and the first storage data.

4 . The system of claim 3 , wherein the IIoT management platform is further configured to:

construct a data retrieval map based on the plurality of associated platform groups, the intra group association degree corresponding to each of the plurality of associated sub-platforms, and second storage data corresponding to each of the plurality of sensor network sub-platforms, the second storage data including the first storage data; and

determine the future retrieval feature through a predictive model based on the data retrieval map, the predictive model being a machine learning model.

5 . The system of claim 1 , wherein the IIoT management platform is further configured to:

for a data group among the plurality of data groups:

obtain a plurality of associated data groups of the data group;

determine an estimated retrieval feature of the data group based on the plurality of associated data groups and a group retrieval feature of the data group; and

adjust the group to be deleted based on the estimated retrieval feature.

6 . A method for data management based on an Industrial Internet of Things (IIoT) data center, the method being performed by an IIoT management platform of a system for data management system based on the IIoT data center, the method comprising;

every first predetermined cycle, for a sensor network sub-platform among a plurality of sensor network sub-platforms:

determining a future acquisition parameter of the sensor network sub-platform based on a remaining storage space, a first retrieval feature, and a future retrieval feature of a sensor network sub-database corresponding to the sensor network sub-platform, wherein the first retrieval feature refers to a retrieval feature of the sensor network sub-database during a predetermined historical period, the future retrieval feature refers to a retrieval feature of the sensor network sub-database in a predetermined future period, and the retrieval feature refers to data that characterizes an access status of the sensor network sub-database;

determining a pre-increment storage capacity of the sensor network sub-database based on the future acquisition parameter;

partitioning data items in the sensor network sub-database to obtain a plurality of data groups;

determining a group to be deleted based on the pre-increment storage capacity, the remaining storage space, and a group retrieval feature and a group data volume corresponding to each of the plurality of data groups;

generating a parameter update instruction based on the future acquisition parameter, and sending the parameter update instruction to the sensor network sub-platform to control the sensor network sub-platform to perform data acquisition based on the future acquisition parameter; and

generating a data deletion instruction based on the group to be deleted, and sending the data deletion instruction to the sensor network sub-platform to control the sensor network sub-platform to delete the group to be deleted.

7 . The method of claim 6 , further comprising:

obtaining a plurality of associated sub-platforms of the sensor network sub-platform; and

determining the future retrieval feature based on first storage data corresponding to each of the plurality of associated sub-platforms.

8 . The method of claim 7 , wherein the determining the future retrieval feature based on first storage data corresponding to each of the plurality of associated sub-platforms includes:

determining a plurality of associated platform groups and intra-group association degrees corresponding to the plurality of associated platform groups based on a second retrieval feature corresponding to each of the plurality of sensor network sub-platforms;

determining the plurality of associated sub-platforms based on the plurality of associated platform groups; and

determining the future retrieval feature based on an intra-group association degree corresponding to each of the plurality of associated sub-platforms and the first storage data.

9 . The method of claim 8 , further comprising:

constructing a data retrieval map based on the plurality of associated platform groups, the intra group association degree corresponding to each of the plurality of associated sub-platforms, and second storage data corresponding to each of the plurality of sensor network sub-platforms, the second storage data including the first storage data; and

determining the future retrieval feature through a predictive model based on the data retrieval map, the predictive model being a machine learning model.

10 . The method of claim 6 , further comprising:

for a data group of the plurality of data groups:

obtaining a plurality of associated data groups of the data group;

determining an estimated retrieval feature of the data group based on the plurality of associated data groups and a group retrieval feature of the data group; and

adjusting the group to be deleted based on the estimated retrieval feature.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 2, 2025
From: SHAO, HANSHU
To: CHENGDU QINCHUAN IOT TECHNOLOGY CO., LTD.
Reel/Frame 072128/0875 →
Priority Claims (1)
CN 202510334385.3 · Mar 20, 2025 · national
References Cited (19)
US 11662703B1 · Shao · 2023 [cited by examiner]
US 20170364962A1 · Wilkinson et al. · 2017 [cited by applicant]
US 20200089214A1 · Cella · 2020 [cited by applicant]
US 20230206356A1 · Shao · 2023 [cited by examiner]
AU 2019100888A4 · 2019 [cited by applicant]
CN 109062129A · 2018 [cited by applicant]
CN 110073301A · 2019 [cited by applicant]
CN 112699117A · 2021 [cited by applicant]
CN 113765715A · 2021 [cited by applicant]
CN 117407445A · 2024 [cited by applicant]
CN 118394816A · 2024 [cited by applicant]
CN 118394977A · 2024 [cited by applicant]
CN 118534883A · 2024 [cited by applicant]
CN 119254603A · 2025 [cited by applicant]
Notification to Grant Patent Right for Invention in Chinese Application No. 202510334385.3 mailed on May 23, 2025, 5 pages. [cited by applicant]
First Office Action in Chinese Application No. 202510334385.3 mailed on Apr. 30, 2025, 12 pages. [cited by applicant]
Gu, Jirong et al., Technology of Distributed and Heterogeneous Cadastral Data Online Collection System, Computer Engineering and Design, 30(24): 5751-5754&5758, 2009. [cited by applicant]
Hao, Jialong, Analysis and Implementation of RealTime Historical Database of Configuration Software for Monitoring in Industry, Full-text Database of Excellent Master's Dissertations in China, 2010, 89 pages. [cited by applicant]
Liu, Qing et al., An Implementation of Power IoT Time Series Data Based on InfluxDB, 2023 International Conference on Advances in Electrical Engineering and Computer Applications (AEECA), 34-39, 2023. [cited by applicant]
Cited By (1)
US 12,675,220