IP Library Granted Patent US 6,881,013
Granted Patent B2
US 6,881,013 · App. 10/624,930 · Granted Apr 19, 2005

Sand pile driving method

Assignee: Fudo Construction Co., Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,881,013
App. No.
10/624,930
Granted
Apr 19, 2005
Kind
B2
Abstract

A sand pile driving method for making a sand pile which does not cause trouble in terms of strength even at a soft point in the actual ground, and enables secure limitation of the increase in total construction time and total amount of sand. A compaction procedure is a procedure for compacting a granule pile 15 by pressing and rotating the casing pipe 13 downward. This is performed based on thrust force P by which the casing pipe presses a granule pile and a driving torque T for rotating the casing pipe against a granule pile.

Claims (41)

1. A sand pile driving method for driving a granule pile in a ground comprising a procedure of alternately performing a pull out procedure to pull out a casing pipe while discharging granule from a lower end portion of the casing pipe and a compaction procedure to compact a discharged granule by penetrating the casing pipe again, following an initial penetration procedure for penetrating the casing pipe to a predetermined depth in the ground, wherein:

the compaction procedure is for compacting the granule by rotational motion of the casing pipe and pressing the granule downward thereby; and

at least a compaction time is controlled based on a driving torque for rotational motion of the casing pipe against the granule.

2. The sand pile driving method according to claim 1 , wherein the compaction time of the compaction procedure is further controlled based on a thrust force of the casing pipe for pressing the granule.

3. A sand pile driving method for driving a granule pile in a ground comprising a procedure of alternately performing a pull out procedure to pull out a casing pipe while discharging granule from a lower end portion of the casing pipe and a compaction procedure to compact a discharged granule by penetrating the casing pipe again, following an initial penetration procedure for penetrating the casing pipe to a predetermined depth in the ground, wherein:

the compaction procedure is for compacting the granule by rotational motion of the casing pipe and pressing the granule downward thereby; and

the compaction procedure is completed at a point in a case where a compaction condition satisfies a given condition, the compaction condition being estimated by a thrust force of the casing pipe for pressing the granule pile and a driving torque for rotational motion of the casing pipe against the granule pile.

4. The sand pile driving method according to claim 3 , wherein the driving torque is estimated based on a driving torque of the casing pipe in the pull out procedure and on a driving torque of the casing pipe in the compaction procedure.

5. The sand pile driving method according to claim 3 , wherein the compaction condition is estimated by an expression

F=α·P· ( T 2 / T 1 )· t+β,

where F is a compaction force, P is the thrust force of the casing pipe, T 1 is the driving torque of the casing pipe in the pull out procedure, T 2 is the driving torque of the casing pipe in the compaction procedure, t is a compaction time, and α and β are coefficients acquired from construction data.

6. The sand pile driving method according to claim 1 , wherein the compaction time for the compaction procedure is controlled based on a cross-sectional area of a pile.

7. A sand pile driving method for driving a granule pile in a ground comprising:

alternately performing a pull out procedure to pull out a casing pipe while discharging granule from a lower end portion of the casing pipe and a compaction procedure to compact a discharged granule by penetrating the casing pipe again, following an initial penetration procedure for penetrating the casing pipe to a predetermined depth in the ground, wherein a compaction condition for compacting granule by the casing pipe and a cross-sectional area of the granule pile compacted by the casing pipe are estimated during the compaction procedure; and wherein a compaction is completed:

(i) at a point that the pile cross-section area reaches a minimum cross-section area in a case where the compaction condition reaches a given state before the pile cross-section area reaches the minimum pile cross-section area;

(ii) at a point that the compaction condition reaches the given state in a case where the compaction condition reaches the given state before the pile cross-section area reaches a maximum pile cross-section area; or

(iii) at a point that the pile cross-section area reaches the maximum cross-section area in a case where the pile cross-section area of the granule pile compacted by the casing pipe reaches the maximum pile cross-section area before the compaction condition reaches the given state.

8. The sand pile driving method according to claim 7 , wherein the granule pile is compacted by pressing the granule pile downward by the casing pipe and a rotational motion thereof; and

the compaction condition is estimated by at least a thrust force of the casing pipe pressing the granule pile and a torque for rotational motion of the casing pipe against the granule pile.

9. The sand pile driving method according to claim 7 , wherein the granule pile is compacted by pressing the granule pile downward by the casing pipe and a rotational motion thereof; and

the compaction condition is estimated by an expression

F=α·P ·( T 2 / T 1 )· t+β,

where F is a compaction force, P is the thrust force of the casing pipe, T 1 is a torque of the casing pipe in the pull out procedure, T 2 is a torque of the casing pipe in the compaction procedure, t is a compaction time, and α and β are coefficients acquired from construction data.

10. A sand pile driving method for driving a granule pile in a ground comprising:

alternately performing a pull out procedure to pull out a casing pipe while discharging granule from a lower end portion of the casing pipe and a compaction procedure to compact a discharged granule by penetrating the casing pipe again, following an initial penetration procedure for penetrating the casing pipe to a predetermined depth in the ground, wherein the compaction procedure for compacting the granule pile is carried out by a rotational motion of the casing pipe and pressing the granule pile downward thereby; and

wherein the method includes

a first step for driving a plurality of first piles in a given area; and

a second step for additionally driving a plurality of second piles between the previously driven first piles within the area in which each compaction is completed when a compaction condition reaches a given state.

11. A sand pile driving method for driving a granule pile in a ground comprising:

alternately performing a pull out procedure to pull out a casing pipe while discharging granule from a lower end portion of the casing pipe and a compaction procedure to compact a discharged granule by penetrating the casing pipe again, following an initial penetration procedure for penetrating the casing pipe to a predetermined depth in the ground, wherein the compaction procedure for compacting the granule pile is carried out by a rotational motion of the casing pipe and pressing the granule pile downward thereby; and

wherein the method includes:

a first step for driving a plurality of first piles in a given area; and

a second step for additionally driving a plurality of second piles between the previously driven first piles within the area,

wherein a compaction time is arranged based on a driving torque for the rotational motion of the casing pipe against the granule pile in the compaction procedure in making at least one of the plurality of the first piles.

12. A sand pile driving method for driving a granule pile in a ground comprising:

alternately performing a pull out procedure to pull out a casing pipe while discharging granule from a lower end portion of the casing pipe and a compaction procedure to compact a discharged granule by penetrating the casing pipe again, following an initial penetration procedure for penetrating the casing pipe to a predetermined depth in the ground, wherein the compaction procedure for compacting the granule pile is carried out by a rotational motion of the casing pipe and pressing the granule pile downward thereby; and

wherein the method includes:

a first step for driving a plurality of first piles in a given area; and

a second step for additionally driving a plurality of second piles between the previously driven first piles within the area,

wherein a compaction time is arranged based on a driving torque for the rotational motion of the casing pipe against the granule pile in the compaction procedure in making at least one of the plurality of the second piles.

13. The sand pile driving method according to claim 2 , wherein the compaction time for the compaction procedure is controlled based on a cross-sectional area of a pile.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 30, 2004
From: OTSUKA, MAKOTO; ISHIDA, OSAMU; YOSHITOMI, HIROKI
To: FUDO CONSTRUCTION CO., LTD.
Reel/Frame 014946/0275 →
Priority Claims (2)
JP P2003-174400 · Jun 19, 2003 · national
JP P2003-174402 · Jun 19, 2003 · national
Continuity (1)
Related Publication 20040258486A1 · Dec 23, 2004