IP Library Granted Patent US 6,913,081
Granted Patent B2
US 6,913,081 · App. 10/359,904 · Granted Jul 5, 2005

Combined scale inhibitor and water control treatments

Assignee: Baker Hughes Incorporated
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,913,081
App. No.
10/359,904
Granted
Jul 5, 2005
Kind
B2
Abstract

A combined scale inhibitor treatment and water control treatment requires fewer steps than the sum of each treatment procedure practiced separately. The control of water production simultaneously further reduces the amount of scale formed. Conventional water control chemicals and scale inhibitors of a wide variety of types can still be employed to advantage, and the same equipment may be used as employed for the treatments implemented separately.

Claims (36)

1. A method for inhibiting the formation of scale and the production of water in a well in a subterranean formation having at least one water production zone comprising:

shutting in the well;

injecting a water control treatment into the water production zone, where the water control treatment is selected from the group consisting of relative permeability modifier treatment (RPMT) and treatments using a material selected from the group consisting of cross-linked polysaccharides, polyacrylamides; silica gels, resins and cement, and polysaccharides and polyacrylamides in their hydrolysed, non-ionic and cationic forms, non-crosslinked polysaccharides and non-crosslinked polyacrylamides, and combinations thereof;

squeezing a scale inhibitor into the water production zone before, during or after injecting the water control treatment;

soaking in the well; and

back producing the well.

2. The method of claim 1 further comprising applying an overflush into the water production zone following injecting the water control treatment.

3. The method of claim 1 where in injecting the water control treatment further comprises simultaneously injecting additional scale inhibitor.

4. The method of claim 1 where the water production zone is also a hydrocarbon production zone.

5. The method of claim 1 where the subterranean formation further comprises a hydrocarbon production zone.

6. The method of claim 1 where in squeezing the scale inhibitor into the water production zone, the scale inhibitor operates by mechanism selected from the group consisting of an adsorption mechanism, a precipitation mechanism, and a combination thereof.

7. The method of claim 1 where the water control treatment is a water shut-off treatment (WSOT) and squeezing the scale inhibitor is conducted before the WSOT.

8. A method for inhibiting the formation of scale and the production of water in a well in a subterranean formation having at least one water production zone, the method comprising:

shutting in the well;

injecting a water control treatment into the water production zone, where a material used in the water control treatment is selected from the group consisting of cross-linked polysaccharides, polyacrylamides; silica gels, resins and cement, or polysaccharides and polyacrylamides in their hydrolysed, non ionic and cationic forms, non-crosslinked polysaccharides and non-crosslinked polyacrylamides, and combinations thereof;

squeezing a scale inhibitor into the water production zone before, during or after the water control treatment, where the scale inhibitor operates by mechanism selected from the group consisting of an adsorption mechanism, a precipitation mechanism, and a combination thereof;

soaking in the well; and

back producing the well.

9. The method of claim 8 further comprising applying an overflush into the water production zone following injecting the water control treatment.

10. The method of claim 8 where in injecting the water control treatment further comprises simultaneously injecting additional scale inhibitor.

11. The method of claim 8 where the water production zone is also a hydrocarbon production zone.

12. The method of claim 8 where the subterranean formation further comprises a hydrocarbon production zone.

13. The method of claim 8 where the water control treatment is a relative permeability modifier treatment (RPMT).

14. The method of claim 8 where the water control treatment is a water shut-off treatment (WSOT) and squeezing the scale inhibitor is conducted before the WSOT.

15. A method for inhibiting the formation of scale and the production of water in a well in a subterranean formation having at least one water production zone, the method comprising:

shutting in the well;

injecting a pre-flush or spearhead fluid into the water production zone, then

squeezing a scale inhibitor into the water production zone, where the scale inhibitor operates by mechanism selected from the group consisting of an adsorption mechanism, a precipitation mechanism, and a combination thereof;

performing a water control treatment stage selected from the group consisting of a water shut-off treatment (WSOT) and a relative permeability modifier treatment (RPMT), and

where the water control treatment stage further comprises injecting a the water control treatment into the water production zone following the scale inhibitor, where a material used in the water control treatment is selected from the group consisting of cross-linked polysaccharides, polyacrylamides; silica gels, resins and cement, and polysaccharides and polyacrylamides in their hydrolysed, non ionic and cationic forms, non-crosslinked polysaccharides and non-crosslinked polyacrylamides, and combinations thereof;

soaking in the well; and

back producing the well.

16. The method of claim 15 further comprising applying an overflush into the water production zone following injecting the water control treatment.

17. The method of claim 15 where in injecting the water control treatment further comprises simultaneously injecting additional scale inhibitor.

18. The method of claim 15 where the water production zone is also a hydrocarbon production zone.

19. The method of claim 15 where the subterranean formation further comprises a hydrocarbon production zone.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 21, 2003
From: POWELL, PETER; SINGLETON, MICHAEL A.; SORBIE, KENNETH S.
To: BAKER HUGHES INCORPORATED
Reel/Frame 013982/0084 →
Continuity (1)
Related Publication 20040154799A1 · Aug 12, 2004