IP Library › Granted Patent US 7,054,750
Granted Patent B2
US 7,054,750 · App. 10/793,350 · Granted May 30, 2006

Method and system to model, measure, recalibrate, and optimize control of the drilling of a borehole

Assignee: Halliburton Energy Services, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,054,750
App. No.
10/793,350
Granted
May 30, 2006
Kind
B2
Abstract

Methods and systems for controlling the drilling of a borehole are disclosed. The methods employ the assumption that nonlinear problems can be modeled using linear equations for a local region. Common filters can be used to determine the coefficients for the linear equation. Results from the calculations can be used to modify the drilling path for the borehole. Although the calculation/modification process can be done continuously, it is better to perform the process at discrete intervals along the borehole in order to maximize drilling efficiency.

Claims (58)

1. A method of drilling a borehole, comprising:

providing a model;

drilling a discrete interval of a borehole based upon the model; and

modifying the model based on data obtained during drilling, where modifying the model based on data obtained during drilling comprises separating inclinometer data from magnetometer data.

2. The method of claim 1 , wherein the model is the drill string whirl model.

3. The method of claim 1 , wherein the model is the torque/drag/bucking model.

4. The method of claim 1 , wherein the model is the BHA dynamics model.

5. The method of claim 1 , wherein the model is the geosteering model.

6. The method of claim 1 , wherein the model is the hydraulics model.

7. The method of claim 1 , wherein the model is the geomechanics model.

8. The method of claim 1 , wherein the model is the pore pressure/fracture gradient model.

9. The method of claim 1 , wherein the model is the SFIP model.

10. The method of claim 1 , wherein the step of modifying comprises:

resampling data on a regular grid.

11. The method of claim 1 , wherein the step of modifying comprises:

filtering observed data.

12. The method of claim 1 , wherein the step of modifying comprises:

estimating noise.

13. The method of claim 1 , wherein the step of modifying comprises:

mapping y values.

14. The method of claim 1 , wherein the step of modifying comprises:

determining one or more linear state variables.

15. The method of claim 1 , wherein the step of modifying comprises:

estimating statistics.

16. The method of claim 1 , wherein the step of modifying comprises:

constructing estimators.

17. A method of drilling a borehole, comprising:

providing a model;

drilling a discrete interval of a borehole based upon the model;

modifying the model based on data obtained during drilling by:

separating the inclinometer data from the magnetometer data;

resampling data on a regular grid;

filtering observed data;

estimating noise;

mapping y values;

determining one or more linear state variables;

estimating statistics; and

constructing estimators.

18. The method of claim 17 , wherein the model is the drill string whirl model.

19. The method of claim 17 , wherein the model is the torque/drag/bucking model.

20. The method of claim 17 , wherein the model is the BHA dynamics model.

21. The method of claim 17 , wherein the model is the geosteering model.

22. The method of claim 17 , wherein the model is the hydraulics model.

23. The method of claim 17 , wherein the model is the geomechanics model.

24. The method of claim 17 , wherein the model is the pore pressure/fracture gradient model.

25. The method of claim 17 , wherein the model is the SFIP model.

26. A computer-readable storage medium containing a set of instructions for a general purpose computer, the set of instructions comprising:

an input routine operatively associated with one or more sensors;

a run routine for implementing an update method, wherein the run routine is constructed and arranged to separate the inclinometer data from the magnetometer data; and

an output routine for controlling a drilling operation.

27. The storage medium of claim 26 , wherein the run routine is constructed and arranged to:

resample data on a regular grid;

filter observed data;

estimate noise;

map y values;

determine one or more linear state variables;

estimate statistics; and

construct estimators.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 10, 2004
From: RODNEY, PAUL F.; SPROSS, RONALD L.
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 015525/0677 →
Continuity (1)
Related Publication 20050197777A1 · Sep 8, 2005