IP Library Granted Patent US 7,107,749
Granted Patent B2
US 7,107,749 · App. 10/532,806 · Granted Sep 19, 2006

Method for splicing a laid rope

Assignee: DSM IP Assets B.V.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,107,749
App. No.
10/532,806
Granted
Sep 19, 2006
Kind
B2
Abstract

Method to make a splice in a laid rope construction containing at least two strands includes splitting one end of the laid rope into a first part having a first number of strands and a second part having a second number of strands, then tucking the first part of the first rope from a first direction into an opening in the laid rope, and thereafter tucking the second part into the opening from an opposite direction. The first and second parts are tucked at least 3 times into additional openings being separated from one another such that the first part and the second part cross over at least once all the strands of the laid rope and leave the second rope at the last opening.

Claims (11)

1. Method to make a splice in a laid rope construction containing at least two strands comprising the steps of:

a) splitting one end of a first rope into a first part having a first number of strands and a second part having a second number of strands, the first number of strands being at most one more than the second number of strands;

b) tucking the first part of the first rope from a first direction into a first opening in a second rope which splits the second rope into first and second groupings of strands having respective numbers of strands differing by at most one strand, wherein the first grouping of strands is positioned on one side of the first part of the first rope and the second grouping of strands is positioned on another side of the first part of the first rope which is opposite to said one side;

c) tucking the second part of the first rope into the first opening in the second rope from a second direction which is opposite to the first direction from which the first part of the first rope is tucked into the first opening according to step b);

d) repeating steps b) and c) at least 3 times, the openings in the second rope being separated from one another such that the first and the second parts of the first rope cross over at least once all the strands of the second rope, wherein each of the first and second parts of the first rope leave the second rope at a last opening.

2. Method according to claim 1 , wherein the laid rope construction contains at least three strands.

3. Method according to claim 1 , further comprising the steps of: e) cutting a complete strand from the first and the second part where they leave the last opening; repeating steps b) and c) at least 3 times; g) repeating steps e) and f) until the last strand is cut off.

4. Spliced rope construction obtainable by the method of claim 1 .

5. Spliced rope construction of claim 4 , containing an eye splice, and/or an end- for-end splice.

6. Spliced rope construction of claim 4 , being a grommet, a hawser, a round sling or an endless rope.

7. Spliced rope construction, wherein in step d) of claim 1 , steps b) and c) are repeated at least 3 and at least 3+1 times, respectively.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 19, 2005
From: WETZELS, KAREL JOZEF; DIRKS, CHRISTIAAN HENRI PETER
To: DSM IP ASSETS B.V.
Reel/Frame 017237/0587 →
Priority Claims (1)
EP 02079571 · Nov 1, 2002 · regional
Continuity (1)
Related Publication 20060048494A1 · Mar 9, 2006