IP Library Granted Patent US 7,228,199
Granted Patent B2
US 7,228,199 · App. 10/085,396 · Granted Jun 5, 2007

Bulk inventory network system

Assignee: J.P. Donmoyer, Inc
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,228,199
App. No.
10/085,396
Granted
Jun 5, 2007
Kind
B2
Abstract

A system and method for remote monitoring of material storage levels for dry bulk goods, wherein an independent entity, such as a transportation carrier, can continuously monitor raw material supply levels at a remote manufacturing plant, and, based on projected usage rates, place timely orders on behalf of the plant, with preselected vendors, to replenish depleted raw materials. The transportation carrier can then coordinate material shipments from the vendor to the manufacturing site using its own trucks. In this manner, the task of maintaining sufficient on site raw material storage levels is completely removed from the manufacturing plant.

Claims (25)

1. A method for a transportation carrier to maintain sufficient quantities of dry bulk materials at a remote manufacturing site comprising:

generating a first signal representative of an existing dry bulk material quantity at a remote site;

transmitting a second signal corresponding to said first signal, from said remote site to at least one of a local computer and a central computer at predetermined time intervals;

determining said existing dry bulk material quantity and projected material usage rate for said existing dry bulk material quantity based on said transmitted signals;

automatically ordering additional dry bulk materials from a preselected vendor by said at least one of a local computer and a central computer based on said existing material quantity and said projected material usage rate;

automatically directing a transport vehicle to deliver said additional dry bulk material from said preselected vendor to said manufacturing site; and

transporting said additional dry bulk material from said preselected vendor to said manufacturing site,

whereby additional dry bulk material is supplied to said manufacturing site before said existing dry bulk material is depleted.

2. A method for a transportation carrier to maintain sufficient quantities of dry bulk materials at a remote manufacturing site comprising:

generating a first signal representative of an existing dry bulk material quantity at a remote site;

transmitting a second signal corresponding to said first signal, from said remote site to at least one of a local computer and a central computer at predetermined time intervals;

determining said existing dry bulk material quantity and projected material usage rate for said existing dry bulk material quantity based on said transmitted signals;

automatically ordering additional dry bulk materials from a preselected vendor by said at least one of a local computer and a central computer based on said existing material quantity and said projected material usage rate;

automatically directing a transport vehicle to deliver said additional dry bulk material from said preselected vendor to said manufacturing site; and

transporting said additional dry bulk material from said preselected vendor to said manufacturing site,

whereby additional dry bulk material is supplied to said manufacturing site before said existing dry bulk material is depleted; and

producing at least one of an audible and a visual alarm, via said central computer, if said material level falls below a predetermined level.

3. A method for a transportation carrier to maintain sufficient quantities of dry bulk materials at a remote manufacturing site comprising:

generating a first signal representative of an existing dry bulk material quantity at a remote site using one of an ultrasonic and a strain gauge detector to generate said first signal;

transmitting a second signal corresponding to said first signal, from said remote site to at least one of a local computer and a central computer at predetermined time intervals;

determining said existing dry bulk material quantity and projected material usage rate for said existing dry bulk material quantity based on said transmitted signals;

automatically ordering additional dry bulk materials from a preselected vendor by said at least one of a local computer and a central computer based on said existing material quantity and said projected material usage rate;

automatically directing a transport vehicle to deliver said additional dry bulk material from said preselected vendor to said manufacturing site; and

transporting said additional dry bulk material from said preselected vendor to said manufacturing site,

whereby additional dry bulk material is supplied to said manufacturing site before said existing dry bulk material is depleted.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Jul 2, 2021
From: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
To: QUALITY CARRIERS, INC.
Reel/Frame 056748/0951 →
SECURITY INTEREST Recorded Aug 30, 2019
From: QUALITY CARRIERS, INC.
To: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
Reel/Frame 050223/0037 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2019
From: J.P. DONMOYER, INC.
To: QUALITY CARRIERS, INC.
Reel/Frame 050209/0078 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 28, 2002
From: WALLACE, DAVID B.
To: J.P. DONMOYER INC
Reel/Frame 012642/0716 →
Continuity (2)
Continuation In Part 0916737900 · Oct 6, 1998
Related Publication 20020082735A1 · Jun 27, 2002