IP Library › Granted Patent US 7,290,443
Granted Patent B2
US 7,290,443 · App. 10/989,185 · Granted Nov 6, 2007

Method for measuring formation properties with a time-limited formation test

Assignee: Schlumberger Technology Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,290,443
App. No.
10/989,185
Granted
Nov 6, 2007
Kind
B2
Abstract

An apparatus and method for determining at least one downhole formation property is disclosed. The apparatus includes a probe and a pretest piston positionable in fluid communication with the formation, and a series of flowlines pressure gauges, and valves configured to selectively draw into the apparatus for measurement of one of formation fluid and mud. The method includes performing a first pretest to determine an estimated formation parameter; using the first pretest to design a second pretest and generate refined formation parameters whereby formation properties may be estimated.

Claims (6)

1. A method for determining an estimated formation pressure from a drawdown operation using a formation tester in a formation penetrated by a borehole, comprising:

setting the formation tester against a wall of the borehole so that a pretest chamber of the formation tester is in fluid communication with the formation, a drilling fluid in the pretest chamber having a higher pressure than the formation pressure;

decompressing the drilling fluid in the pretest chamber by withdrawing a pretest piston in the formation tester at a constant drawdown rate;

collecting data points representing fluid pressures in the pretest chamber as a function of time;

identifying a range of consecutive data points that fit a line of pressure versus time with a fixed slope, the fixed slope being based on a compressibility of the drilling fluid, the constant drawdown rate, and a volume of the pretest chamber; and

determining the estimated formation pressure from a first data point after the range of the consecutive data points.

Continuity (2)
Division 1023739400 · Sep 9, 2002
Related Publication 20070175273A1 · Aug 2, 2007