IP Library Granted Patent US 7,331,385
Granted Patent B2
US 7,331,385 · App. 10/558,068 · Granted Feb 19, 2008

Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons

Assignee: ExxonMobil Upstream Research Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,331,385
App. No.
10/558,068
Granted
Feb 19, 2008
Kind
B2
Abstract

Methods are provided that include the steps of providing wells in a formation, establishing one or more fractures ( 12 ) in the formation, such that each fracture intersects at least one of the wells ( 16, 18 ), placing electrically conductive material in the fractures, and generating electric current through the fractures and through the material such that sufficient heat ( 10 ) is generated by electrical resistivity within the material to pyrolyze organic matter in the formation into producible hydrocarbons.

Claims (33)

1. A method of treating a subterranean formation that contains solid organic matter, said method comprising:

(a) providing one or more wells that penetrate a treatment interval within the subterranean formation;

(b) establishing at least one fracture from at least one of said wells, whereby said fracture intersects at least one of said wells;

(c) placing electrically conductive material in said fracture; and

(d) passing electric current through said fracture such that said current passes through at least a portion of said electrically conductive material and sufficient heat is generated by electrical resistivity within said portion of said electrically conductive material to pyrolyze at least a portion of said solid organic matter into producible hydrocarbons.

2. The method of claim 1 wherein said subterranean formation comprises oil shale.

3. The method of claim 1 wherein said wells are substantially vertical.

4. The method of claim 1 wherein said wells are substantially horizontal.

5. The method of claim 1 wherein said fracture is substantially horizontal.

6. The method of claim 1 wherein said fracture is substantially vertical.

7. The method of claim 1 wherein said fracture is substantially longitudinal to the well from which it is established.

8. The method of claim 1 wherein said electrically conductive material comprises a proppant material.

9. The method of claim 1 wherein said electrically conductive material comprises a conductive cement.

10. A method of treating a subterranean formation that contains solid organic matter, said method comprising:

(a) providing one or more wells that penetrate a treatment interval within the subterranean formation;

(b) establishing at least one fracture from at least one of said wells, whereby said fracture intersects at least one of said wells;

(c) placing electrically conductive proppant material in said fracture; and

(d) passing electric current through said fracture such that said current passes through at least a portion of said electrically conductive proppant material and sufficient heat is generated by electrical resistivity within said portion of said electrically conductive proppant material to pyrolyze at least a portion of said solid organic matter into producible hydrocarbons.

11. A method of treating a subterranean formation that contains solid organic matter, said method comprising:

(a) providing two or more wells that penetrate a treatment interval within the subterranean formation;

(b) establishing at least one fracture from at least one of said wells, whereby said fracture intersects at least two of said wells;

(c) placing electrically conductive material in said fracture; and

(d) passing electric current through said fracture such that said current passes through at least a portion of said electrically conductive material and sufficient heat is generated by electrical resistivity within said portion of said electrically conductive material to pyrolyze at least a portion of said solid organic matter into producible hydrocarbons.

12. A method of treating a subterranean formation that contains solid organic matter, said method comprising:

(a) providing two or more wells that penetrate a treatment interval within the subterranean formation;

(b) establishing at least one fracture from at least one of said wells, whereby said fracture intersects at least two of said wells;

(c) placing electrically conductive proppant material in said fracture; and

(d) passing electric current through said fracture such that said current passes through at least a portion of said electrically conductive proppant material and sufficient heat is generated by electrical resistivity within said portion of said electrically conductive proppant material to pyrolyze at least a portion of said solid organic matter into producible hydrocarbons.

13. A method of treating a heavy oil or tar sand subterranean formation containing hydrocarbons, said method comprising:

(a) providing one or more wells that penetrate a treatment interval within the subterranean formation;

(b) establishing at least one fracture from at least one of said wells, whereby said fracture intersects at least one of said wells;

(c) placing electrically conductive material in said fracture; and

(d) passing electric current through said fracture such that said current passes through at least a portion of said electrically conductive material and sufficient heat is generated by electrical resistivity within said portion of said electrically conductive material to reduce the viscosity of at least a portion of said hydrocarbons.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 22, 2005
From: SYMINGTON, WILLIAM A.; THOMAS, MICHELE M.; PASSEY, QUINN R.; EL-RABAA, ABDEL WADOOD M.; MOSS, JEFF H.; KAMINSKY, ROBERT D.
To: EXXONMOBIL UPSTREAM RESEARCH COMPANY
Reel/Frame 017954/0307 →
Continuity (1)
Related Publication 20070000662A1 · Jan 4, 2007