IP Library › Granted Patent US 7,547,331
Granted Patent B2
US 7,547,331 · App. 10/457,729 · Granted Jun 16, 2009

Reformer installation with heat shield

Assignee: EMITEC Gesellschaft fuer Emissionstechnologie mbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,547,331
App. No.
10/457,729
Granted
Jun 16, 2009
Kind
B2
Abstract

A reformer installation for generating a hydrogen-rich product gas from a hydrocarbon-containing fluid, includes a housing having an interior, at least one reformer zone disposed in the interior of the housing and at least one feed line leading to the housing. A thermally insulating heat shield causes a reduction of an operating temperature in the at least one reformer zone by 50% to take at least 8 hours and preferably causes a reduction of the operating temperature in the at least one reformer zone by 20% to take at least 8 hours. This improves the cold start performance of the reformer installation, since the reformer installation is prevented from cooling off too quickly. That is particularly advantageous for the use of reformer installations of this type in automobile construction, since those kinds of reformer installations are activated again and again at certain intervals.

Claims (29)

1. A fuel cell installation, comprising:

a reformer installation for generating a hydrogen-rich product gas from a hydrocarbon-containing fluid, said reformer installation including:

a housing having an interior;

at least one reformer zone disposed in said interior of said housing and having an operating temperature;

at least one feed line leading to said housing; and

a thermally insulating heat shield causing a reduction of said operating temperature in said at least one reformer zone by 20% to take at least 8 hours; and

a fuel cell disposed downstream of said reformer installation.

2. The fuel cell installation according to claim 1 , wherein said eat heat shield causes it to take at least 24 hours for said operating temperature in said at least one reformer zone to drop by 50%.

3. The fuel cell installation according to claim 1 , wherein said heat shield causes it to take at least 24 hours for said operating temperature in said at least one reformer zone to drop by 20%.

4. The fuel cell installation according to claim 1 , wherein said heat shield has a thermal conductivity of less than 35 W/mK.

5. The fuel cell installation according to claim 1 , wherein said heat shield has a thermal conductivity of less than 12 W/mK.

6. The fuel cell installation according to claim 1 , wherein said heat shield has a thermal conductivity of less than 5 W/mK.

7. The fuel cell installation according to claim 1 , wherein said heat shield has an associated heat accumulator.

8. The fuel cell installation according to claim 7 , wherein said heat accumulator is constructed with a phase change material.

9. The fuel cell installation according to claim 7 , wherein said heat accumulator is disposed within said heat shield.

10. The fuel cell installation according to claim 1 , wherein said heat shield has a vacuum.

11. The fuel cell installation according to claim 1 , wherein said at least one reformer zone is a plurality of individual reformer zones, and said heat shield has different thermal conductivities at said individual reformer zones.

12. The fuel cell installation according to claim 11 , wherein said plurality of individual reformer zones includes a first reformer zone for partial oxidation and a second reformer zone for steam reforming of a hydrocarbon-containing fluid, and said heat shield has a lower thermal conductivity in said second reformer zone than in said first reformer zone.

13. The fuel cell installation according to claim 12 , wherein said plurality of individual reformer zones includes a third reformer zone for purification of the product gas, and said heat shield has a higher thermal conductivity in said third reformer zone than in said second reformer zone.

14. The fuel cell installation according to claim 13 , wherein said heat shield has a lower thermal conductivity in said third reformer zone than in said first reformer zone.

15. The fuel cell installation according to claim 13 , wherein said third reformer zone provides catalytic purification of the product gas.

16. The fuel cell installation according to claim 1 , wherein said heat shield has an associated electric heater.

17. The fuel cell installation according to claim 1 , wherein said at least one feed line has a heat shield.

18. The fuel cell installation according to claim 17 , wherein said heat shield of said at least one feed line has a heat accumulator filled with phase change material.

19. The fuel cell installation according to claim 1 , wherein said at least one feed line has an electric heater.

20. The fuel cell installation according to claim 1 , which further comprises at least one honeycomb body being thermally decoupled from said housing and disposed in said interior of said housing.

21. The fuel cell installation according to claim 20 , wherein said at least one honeycomb body is at least partially surrounded by an air gap.

22. The fuel cell installation according to claim 21 , which further comprises at least one convection barrier extending into said air gap.

23. The fuel cell installation according to claim 20 , wherein said at least one honeycomb body has at least one suspension device at least partly formed of ceramic material.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 27, 2009
From: BRUECK, ROLF
To: EMITEC GESELLSCHAFT FUER EMISSIONSTECHNOLOGIE MBH
Reel/Frame 022596/0444 →
Priority Claims (1)
DE 100 61 084 · Dec 8, 2000 · national
Continuity (2)
Continuation PCTEP011441600 · Dec 7, 2001
Related Publication 20040033174A1 · Feb 19, 2004