IP Library › Granted Patent US 7,757,759
Granted Patent B2
US 7,757,759 · App. 11/741,330 · Granted Jul 20, 2010

Torque sub for use with top drive

Assignee: Weatherford/Lamb, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,757,759
App. No.
11/741,330
Granted
Jul 20, 2010
Kind
B2
Abstract

A torque sub for use with a top drive is disclosed. A method of connecting threaded tubular members for use in a wellbore includes operating a top drive. The top drive rotates a first threaded tubular member relative to a second threaded tubular member. The method further includes measuring a torque exerted on the first tubular member by the top drive. The torque is measured using a torque shaft rotationally coupled to the top drive and the first tubular. The torque shaft has a strain gage disposed thereon. The method further includes wirelessly transmitting the measured torque from the torque shaft to a stationary interface; measuring rotation of the first tubular member; compensating the rotation measurement by subtracting a deflection of the top drive and/or the first tubular member; determining acceptability of the threaded connection; and stopping rotation of the first threaded member when the threaded connection is complete or if the threaded connection is unacceptable.

Claims (40)

1. A method of connecting threaded tubulars for use in a wellbore, comprising:

operating a top drive, thereby rotating a first threaded tubular relative to a second threaded tubular;

measuring a torque exerted on the first tubular by the top drive, wherein the torque is measured using a torque shaft rotationally coupled to the top drive and the first tubular, the torque shaft having a strain gage disposed thereon;

wirelessly transmitting the measured torque from the torque shaft to a stationary interface;

measuring rotation of the first tubular;

compensating the rotation measurement by subtracting a deflection of at least one of:

the top drive, and

the first tubular;

determining acceptability of the threaded connection; and

stopping rotation of the first threaded when the threaded connection is complete or if the threaded connection is unacceptable.

2. The method of claim 1 , further comprising wirelessly transmitting electrical energy from a stationary interface to the torque shaft.

3. The method of claim 1 , wherein:

each of the two threaded tubulars has a shoulder,

the method further comprises detecting a shoulder condition during rotation of the first tubular; and

the threaded connection is complete when reaching a predefined rotation value from the shoulder condition.

4. The method of claim 3 , wherein detecting the shoulder condition comprises calculating and monitoring a rate of change of torque with respect to rotation.

5. The method of claim 4 , wherein acceptability is determined using the rate of change of torque with respect to rotation after detecting the shoulder condition.

6. The method of claim 3 , wherein acceptability is determined using a value measured at or after the shoulder condition.

7. The method of claim 6 , wherein the measured value is a torque value.

8. The method of claim 6 , wherein the measured value is a rotation value.

9. The method of claim 3 , wherein acceptability is determined using a relaxation rotation of the first threaded tubular.

10. The method of claim 1 , wherein the rotation measurement is compensated by subtracting the deflection of the top drive.

11. The method of claim 10 , further comprising calculating the deflection of the top drive using the measured torque.

12. The method of claim 10 , further comprising wirelessly transmitting at least one of a calibration signal and a control signal from the stationary interface to the torque shaft.

13. The method of claim 1 , wherein the rotation measurement is compensated by subtracting the deflection of the first tubular.

14. The method of claim 1 , further comprising measuring a longitudinal load exerted on the top drive using the torque shaft, the torque shaft having a second strain gage disposed thereon.

15. A method of connecting threaded tubulars for use in a wellbore, comprising:

operating a top drive, thereby rotating a first threaded tubular relative to a second threaded tubular;

measuring a torque exerted on the first tubular by the top drive, wherein the torque is measured using a torque shaft rotationally coupled to the top drive and the first tubular, the torque shaft having a strain gage disposed thereon;

wirelessly transmitting the measured torque from the torque shaft to a stationary interface;

measuring rotation of the first tubular;

compensating the rotation measurement by subtracting a deflection of the first tubular; and

stopping rotation of the first threaded tubular when the threaded connection is complete.

16. The method of claim 15 , further comprising wirelessly transmitting electrical energy from a stationary interface to the torque shaft.

17. The method of claim 15 , wherein:

each of the two threaded tubulars has a shoulder,

the method further comprises detecting a shoulder condition during rotation of the first tubular; and

the threaded connection is complete when reaching a predefined rotation value from the shoulder condition.

18. The method of claim 17 , wherein detecting the shoulder condition comprises calculating and monitoring a rate of change of torque with respect to rotation.

19. The method of claim 15 , further comprising measuring a longitudinal load exerted on the top drive using the torque shaft, the torque shaft having a second strain gage disposed thereon.

Assignments (9)
PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Recorded Apr 26, 2023
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 063470/0629 →
SECURITY INTEREST Recorded Oct 1, 2021
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 057683/0706 →
RELEASE OF SECURITY INTEREST Recorded Oct 1, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 057683/0423 →
RELEASE OF SECURITY INTEREST Recorded Aug 28, 2020
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 053838/0323 →
SECURITY INTEREST Recorded Aug 28, 2020
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 054288/0302 →
SECURITY INTEREST Recorded Dec 26, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT
Reel/Frame 051419/0140 →
SECURITY INTEREST Recorded Dec 18, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY INC.; PRECISION ENERGY SERVICES INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT
Reel/Frame 051891/0089 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 4, 2014
From: WEATHERFORD/LAMB, INC.
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Reel/Frame 034526/0272 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 29, 2007
From: JAHN, MICHAEL; PIETRAS, BERND-GEORG; HEIDECKE, KARSTEN
To: WEATHERFORD/LAMB, INC.
Reel/Frame 019351/0807 →
Continuity (2)
Provisional Application 6079534400 · Apr 27, 2006
Related Publication 20070251701A1 · Nov 1, 2007