IP Library › Granted Patent US 7,886,556
Granted Patent B2
US 7,886,556 · App. 10/591,060 · Granted Feb 15, 2011

Air conditioning system

Assignee: Daikin Industries, Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,886,556
App. No.
10/591,060
Granted
Feb 15, 2011
Kind
B2
Abstract

An air conditioning system includes a plurality of latent heat utilization side refrigerant circuits which are connected in parallel with one another, and a plurality of sensible heat utilization side refrigerant circuits which are connected in parallel with one another. The latent heat utilization side refrigerant circuits include adsorbent heat exchangers provided with an adsorbent on the surface of each. The sensible heat utilization side refrigerant circuits respectively include air heat exchangers and are capable of exchanging heat between the refrigerant and air.

Claims (70)

1. An air conditioning system configured to treat a latent heat load and a sensible heat load in a room by performing a vapor compression refrigeration cycle operation, comprising:

a plurality of first utilization side refrigerant circuits each having an adsorbent heat exchanger provided with an adsorbent on a surface thereof, configured for alternating between an adsorption process in which moisture in air is adsorbed onto the adsorbent by causing the adsorbent heat exchanger to function as an evaporator that evaporates refrigerant and a regeneration process in which moisture is desorbed from the adsorbent by causing the adsorbent heat exchanger to function as a condenser that condenses the refrigerant, and connected in parallel with one another; and

a plurality of second utilization side refrigerant circuits each having an air heat exchanger, configured for exchanging heat between refrigerant and air, and connected in parallel with one another,

the first utilization side refrigerant circuits being configured to supply a room with air that passed through the adsorbent heat exchanger, and the second utilization side refrigerant circuits being configured to supply a room with air that passed through the air heat exchangers

a heat source side refrigerant circuit including a compression mechanism and a heat source side heat exchanger, with the compression mechanism and the heat source side heat exchanger of the heat source side refrigerant circuit being arranged in the air conditioning system such that

only the compression mechanism of the compression mechanism and the heat source side heat exchanger is used in common with the first and second utilization side refrigerant circuits,

the heat source side heat exchanger operates as a condenser of the refrigerant discharged from the compression mechanism when the air heat exchangers operate as evaporators of the refrigerant, and

the heat source side heat exchanger operates as an evaporator of the refrigerant condensed in the air heat exchanger when the air heat exchangers operate as condensers of the refrigerant discharged from the compression mechanism,

the first utilization side refrigerant circuits being connected to a discharge gas connection pipe connected to a discharge side of the compression mechanism, and being connected to an inlet gas connection pipe connected to an inlet side of the compression mechanism.

2. The air conditioning system according to claim 1 , wherein

the second utilization side refrigerant circuits are connected to a liquid connection pipe that is connected to a liquid side of the heat source side heat exchanger, and switchably connected to the discharge gas connection pipe and the inlet gas connection pipe through a switching mechanism.

3. The air conditioning system according to claim 1 , wherein

the air conditioning system is configured to calculate a required latent heat treatment capacity value and a required sensible heat treatment capacity value in order to control an operational capacity of the compression mechanism based on a required latent heat treatment capacity value and a required sensible heat treatment capacity value.

4. The air conditioning system according to claim 1 , wherein

the air conditioning system is configured to calculate a target evaporation temperature and a target condensation temperature of the system as a whole based on the required latent heat treatment capacity value and the required sensible heat treatment capacity value in order to control the operational capacity of the compression mechanism based on a target evaporation temperature and a target condensation temperature.

5. The air conditioning system according to claim 4 , wherein

the air conditioning system is configured to calculate an evaporation temperature difference between the target evaporation temperature and an evaporation temperature and to calculate a condensation temperature difference between the target condensation temperature and a condensation temperature in order to control the operational capacity of the compression mechanism based on the evaporation temperature difference and the condensation temperature difference.

6. The air conditioning system according to claim 3 , wherein

a switching time interval between the adsorption process and the regeneration process in the adsorbent heat exchanger is changeable.

7. The air conditioning system according to claim 1 , wherein

at system startup, a room is supplied with air that passed through the air heat exchanger, and outdoor air is prevented from passing through the adsorbent heat exchanger.

8. The air conditioning system according to claim 1 , wherein

at system startup, in a state in which switching between the adsorption process and the regeneration process in the plurality of adsorbent heat exchangers is stopped, outdoor air is passed through one of the plurality of adsorbent heat exchangers and then is exhausted to the outside, and also room air is passed through an adsorbent heat exchanger among the plurality of adsorbent heat exchangers, besides the one through which the outdoor air passed, and then is supplied to a room again.

9. The air conditioning system according to claim 1 , wherein

at system startup, a switching time interval between the adsorption process and the regeneration process in the adsorbent heat exchanger is made longer than that during normal operation.

10. The air conditioning system according to claim 7 , wherein

a system startup operation is terminated after a predetermined period of time elapsed since system startup.

11. The air conditioning system according to claim 7 , wherein

a system startup operation is terminated after a temperature difference between a target temperature of room air and a temperature of room air is equal to or below a predetermined temperature difference.

12. The air conditioning system according to claim 7 , wherein

before a system startup operation starts, a temperature difference between a target temperature of room air and a temperature of room air is determined, and

when the temperature difference between the target temperature of room air and the temperature of room air is equal to or below a predetermined temperature, the system startup operation is prevented from being performed.

13. The air conditioning system according to claim 1 , wherein

the second utilization side refrigerant circuits are connected to a liquid connection pipe connected to a liquid side of the heat source side heat exchanger, and are connected to the inlet gas connection pipe.

14. The air conditioning system according to claim 1 , wherein

the first utilization side refrigerant circuits and the second utilization side refrigerant circuits constitute an integrated utilization unit.

15. The air conditioning system according to claim 14 , wherein

the utilization unit is configured to supply a room with air that was dehumidified or humidified in the adsorbent heat exchanger.

16. The air conditioning system according to claim 14 , wherein

the utilization unit is configured to exchange heat through the air heat exchanger between refrigerant and air that was dehumidified or humidified in the adsorbent heat exchanger.

17. The air conditioning system according to claim 1 , further comprising

a pressure control mechanism connected to a gas side of the air heat exchanger and configured to control an evaporation pressure of refrigerant in the air heat exchanger when the air heat exchanger is caused to function as an evaporator that evaporates refrigerant.

18. The air conditioning system according to claim 17 , wherein

when the air heat exchanger is caused to function as an evaporator that evaporates refrigerant, the evaporation pressure of refrigerant is controlled by the pressure control mechanism, based on a dew point temperature of room air.

19. The air conditioning system according to claim 18 , further comprising

a pressure detection mechanism configured to detect a refrigerant pressure in the air heat exchanger and an evaporation pressure of refrigerant, wherein

the air conditioning system calculates a target evaporation pressure value based on the dew point temperature of room air and uses the pressure control mechanism to control the evaporation pressure of refrigerant to be equal to or higher than the target evaporation pressure.

20. The air conditioning system according to claim 19 , further comprising

a plurality of condensation detection mechanisms configured to detect a presence of condensation in the air heat exchangers, wherein

when condensation is detected by the condensation detection mechanism, the target evaporation pressure value is changed.

21. The air conditioning system according to claim 19 , further comprising

a condensation detection mechanism configured to detect a presence of condensation in the air heat exchanger, wherein

when condensation is detected by the condensation detection mechanism, the compression mechanism is stopped.

22. The air conditioning system according to claim 19 , further comprising

a condensation detection mechanism configured to detect a presence of condensation in the air heat exchanger, wherein,

the second utilization side refrigerant circuit includes an utilization side expansion valve connected to a liquid side of the air heat exchangers, and

when condensation is detected by the condensation detection mechanism, the utilization side expansion valve is closed.

23. The air conditioning system according to claim 1 , wherein a switching time interval between the adsorption process and the regeneration process in the adsorbent heat exchanger is changeable.

24. The air conditioning system according to claim 17 , wherein

at system startup, treatment of a latent heat load in a room by the first utilization side refrigerant circuit is given priority over treatment of a sensible heat load in a room by the second utilization side refrigerant circuit.

25. The air conditioning system according to claim 24 , wherein

at system startup, treatment of the sensible heat load in a room by the second utilization side refrigerant circuit is stopped until a dew point temperature of room air is equal to or below a target dew point temperature.

26. The air conditioning system according to claim 24 , wherein at system startup, treatment of the sensible heat load in a room by the second utilization side refrigerant circuit is stopped until an absolute humidity of room air is equal to or below a target absolute humidity.

27. The air conditioning system according to claim 24 , wherein at system startup, outdoor air is passed through one of the adsorbent heat exchangers that is performing a regeneration process, and then is exhausted to the outside, and then room air is passed through one of the adsorbent heat exchangers that is performing the adsorption process and is supplied to a room.

28. The air conditioning system according to claim 24 , wherein

before starting a system startup operation, a dew point temperature difference between a target dew point temperature of room air and a dew point temperature of the room air is determined, and

when the dew point temperature difference between the target dew point temperature of room air and the dew point temperature of room air is equal to or below a predetermined dew point temperature difference, the startup operation is prevented from being performed.

29. The air conditioning system according to claim 24 , wherein

before starting a system startup operation, an absolute humidity difference between a target absolute humidity of room air and an absolute humidity of the room air is determined, and

when the absolute humidity difference between the target absolute humidity of room air and the absolute humidity of room air is equal to or below a predetermined absolute humidity difference, the system startup operation is prevented from being performed.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2006
From: FUJIYOSHI, RYUSUKE; YABU, TOMOHIRO
To: DAIKIN INDUSTRIES, LTD.
Reel/Frame 018271/0158 →
Priority Claims (1)
JP 2004-105173 · Mar 31, 2004 · national
Continuity (1)
Related Publication 20070180851A1 · Aug 9, 2007