System and methods(s) of blended mine planning, design and processing

Assignee: BHP Billiton Innovation Pty Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,925,474
App. No.
10/530,846
Granted
Apr 12, 2011
Kind
B2
Abstract

The present invention relates to the field of extracting resource(s) from a particular location. In particular, the present invention relates to the planning, design and processing related to a mine location in a manner based on enhancing the extraction of material considered of value, relative to the effort and/or time in extracting that material. The present application discloses, amongst other things, a method of and apparatus for determining the removal of material(s) from a location, determining the removal of material(s) of a differing relative value from a location, determining a schedule corresponding to a risk and/or return basis, determining aggregated block ordering for the extraction of material from a location, determining a schedule for extraction of dumps and determining a mine design.

Claims (30)

1. A method of transforming a representation of a mine having at least one pit, the method comprising:

obtaining a block model of the pit in which material is divided into a plurality of blocks, the block model representing the mine;

processing the blocks of the block model with a processor to define a plurality of clusters each comprising a plurality of blocks;

forming, with the processor, a cone for each cluster propagating upwardly by precedence arcs extending from each cluster; and

defining, with the processor, clumps of material from the intersection of the cones, the clumps comprising volumes of material not crossed by precedence arcs;

generating, with the processor, an initial block sequence from the defined clumps, the block sequence representing a potential order of extraction of blocks from the mine;

determining, with the processor, a value for time of extraction for each of the blocks of the block model from the block sequence; and

reprocessing the blocks of the block model with the processor based on the determined time values to define a plurality of revised clusters and processing the revised clusters with the processor to define a plurality of clumps representing the mine.

2. The method according to claim 1 wherein processing the blocks of the block model to form clusters is performed based on spatial position of blocks relative to one another.

3. The method of claim 1 , further comprising processing the blocks of the block model with the processor to form clusters based on at least one further criteria comprising a variable selected from the group comprising value of material, grade of material, and material type.

4. The method according to claim 1 comprising controlling the effect of the determined time values with the processor so that clusters are formed from blocks which are more spatially fragmented but more closely follow an optimal extraction schedule in the representation of the mine.

5. The method according to claim 1 comprising controlling the effect of the determined time values so the clusters are formed from blocks which are spatially compact but ignore an optimal extraction sequence in the representation of the mine.

6. The method according to claim 1 wherein when a plurality of clusters has been defined, the clusters are ordered in time by the processor and the plurality of cones are propagated upwardly from each cluster in order of time by the processor, and wherein any blocks already assigned to a first cone are not included in a second cone or any subsequent cone, and any blocks assigned to the second cone are not included in any subsequent cone and so-on.

7. The method according to claim 1 , comprising determining a revised block sequence with the processor to thereby further represent the mine.

8. A method of extracting material from a mine comprising transforming a representation of a mine as claimed in claim 1 , and extracting material from the mine based on the transformed representation.

9. The apparatus according to claim 1 , wherein the processor is arranged to determine a revised block sequence to thereby further represent the mine.

10. An apparatus for transforming a representation of a mine having at least one pit comprising:

a processor for receiving a block model of the pit in which material is divided into a plurality of blocks, the block model representing the mine;

the processor also being for:

processing the blocks of the block model to define a plurality of clusters each comprising a plurality of blocks;

forming a cone for each cluster propagating upwardly by precedence arcs extending from each cluster; and

defining clumps of material from the intersection of the cones, the clumps comprising volumes of material not crossed by precedence arcs;

generating an initial block sequence from the defined clumps, the block sequence representing a potential order of extraction of blocks from the mine;

determining a value for time of extraction for each of the blocks of the block model from the block sequence; and

reprocessing the blocks of the block model based on the determined time value to define a plurality of revised clusters and processing the revised clusters to define a plurality of clumps representing the mine.

11. The apparatus according to claim 10 , wherein the processor is arranged to process the blocks of the block model to form clusters based on spatial position of blocks relative to one another.

12. The apparatus of claim 10 , wherein the processor is arranged to process the blocks of the block model to form clusters based on at least one further criteria comprising a variable selected from the group comprising value of material, grade of material, and material type.

13. The apparatus according to claim 10 wherein the processor is arranged to control the effect of the determined time values so that clusters are formed from blocks which are more spatially fragmented but more closely follow an optimal extraction schedule in the representation of the mine.

14. The apparatus according to claim 10 wherein the processor is arranged to control the effect of the determined time values so the clusters are formed from blocks which are spatially compact but ignore an optimal extraction sequence in the representation of the mine.

15. The apparatus according to claim 10 wherein when a plurality of clusters has been defined, the clusters are ordered in time by the processor and the plurality of cones are propagated upwardly from each cluster in order of time by the processor, and wherein any blocks already assigned to a first cone are not included in a second cone or any subsequent cone, and any blocks assigned to the second cone are not included in any subsequent cone and so-on.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 31, 2006
From: FROYLAND, GARY ALLAN; MENABDE, MERAB
To: BHP BILLITON INNOVATION PTY LTD
Reel/Frame 017419/0113 →
Priority Claims (6)
AU 2002951892 · Oct 9, 2002 · national
AU 2002951895 · Oct 9, 2002 · national
AU 2002951898 · Oct 9, 2002 · national
AU 2002951957 · Oct 9, 2002 · national
AU 2002952654 · Nov 14, 2002 · national
AU 2002952681 · Nov 14, 2002 · national
Continuity (1)
Related Publication 20060265342A1 · Nov 23, 2006