Use of a biphasic turbine in a process for recovering energy in gasification and natural gas applications

Assignee: UOP LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,935,178
App. No.
12/055,895
Granted
May 3, 2011
Kind
B2
Abstract

The invention provides a process and system for regenerating a solvent used to remove carbon dioxide from feed gases, such as natural gas and synthesis gas. The process and system employ a biphasic turbine to recover energy following pressure let down.

Claims (8)

1. A process for treating a carbon dioxide containing gas comprising the steps of:

a) contacting the gas with a solvent in an absorber unit absorbing impurities so as to obtain an impurity-laden solvent and a scrubbed gas;

b) sending the impurity-laden solvent through a carbon dioxide recycle flash drum removing a portion of carbon dioxide that is then compressed, cooled and recirculated to the absorber unit;

c) expanding the impurity-laden solvent through a biphasic turbine so as to release an amount of the impurities in gaseous form and to obtain an impurity-depleted solvent for producing a semi-lean solvent stream; and

d) recirculating the semi-lean solvent stream to the absorber unit.

2. The process of claim 1 , wherein after passing through the biphasic turbine, the impurity-depleted solvent containing a gas liquid mixture is passed to a carbon dioxide vent drum to vent carbon dioxide.

3. The process of claim 1 , wherein the solvent is selected from the group consisting of dimethylether of polyethylene glycol, methanol, a mixture of N-formyl and N-acetyl morpholine, N-methyl-2-pyrrolidone and sulfolane.

4. The process of claim 1 , wherein the process requires about 10 to 15 percent less electricity than a comparable process without the biphasic turbine.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 10, 2008
From: LECHNICK, WILLIAM J; SECHRIST, PAUL A; KUPER, DOUGLAS E; DAVIS, LAMAR A
To: UOP LLC
Reel/Frame 021070/0524 →
Continuity (1)
Related Publication 20090241779A1 · Oct 1, 2009