IP Library Granted Patent US 7,938,713
Granted Patent B2
US 7,938,713 · App. 11/677,368 · Granted May 10, 2011

Device for water-jet cutting or abrasive water-jet cutting units

Assignee: BHDT GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,938,713
App. No.
11/677,368
Granted
May 10, 2011
Kind
B2
Abstract

Control device and method for controlling the impingement of the workpiece by a water jet or an abrasive water jet in a cutting unit. Control device includes a feeder composed of at least two flow-through areas positionable between a high-pressure water supply and a jet nozzle of the cutting unit. At least one of the flow-through areas includes a high pressure area, and at least one of the flow-through areas includes a pressure-reducing area. At least one switchable valve is arranged in the high-pressure area, a pressure-reducing mechanism is arranged in the pressure reducing area, and an impingement line is coupled to the at least two flow-through areas and coupleable to the jet nozzle.

Claims (48)

1. A control device for controlling the impingement of a workpiece by a water jet or an abrasive water jet in a cutting unit, the control device comprising:

a feeder composed of at least two flow-through areas positionable between a high-pressure water supply and a jet nozzle of the cutting unit, wherein at least one of the flow-through areas includes a high pressure area, and at least one of the flow-through areas includes a pressure-reducing area;

at least one switchable valve arranged in the high-pressure area;

a pressure-reducing mechanism arranged in the pressure reducing area; and

an impingement line coupled to the at least two flow-through areas and coupleable to the jet nozzle; and

further comprising:

the at least one switchable valve being arranged in parallel to the pressure reducing area; and

at least one hole breakthrough sensor adapted to control the control device.

2. The control device according to claim 1 , wherein the at least two flow-through areas are structured to be parallel to each other in at least one location.

3. The control device according to claim 1 , wherein the at least two flow-through areas are ultimately merged to form an impingement line of the jet nozzle.

4. The control device according to claim 1 , further comprising another switchable valve arranged upstream of the at least one switchable valve in the high-pressure area.

5. The control device according to claim 4 , wherein the pressure-reducing mechanism is arranged downstream from the other switchable valve in the flow direction in the pressure-reducing area.

6. The control device according to claim 1 , wherein the pressure-reducing mechanism is arranged upstream from another switchable valve arranged in the pressure-reducing area and in the flow direction in the pressure-reducing area.

7. The control device according to claim 1 , wherein the pressure-reducing mechanism is a throttle.

8. The control device according to claim 4 , wherein the pressure-reducing mechanism is a throttle.

9. The control device according to claim 5 , wherein the pressure-reducing mechanism is a throttle.

10. The control device according to claim 1 , wherein at least the switchable valve in the high-pressure area is controlled by the at least one hole breakthrough sensor.

11. The control device according to claim 5 , wherein at least the switchable valve in the high-pressure area is controlled by the at least one hole breakthrough sensor.

12. The control device according to claim 6 , wherein at least the switchable valve in the high-pressure area is controlled by the at least one hole breakthrough sensor.

13. The control device according to claim 1 , wherein the high-pressure water supply comprises a high-pressure pump.

14. A control device for controlling the impingement of a workpiece by a water jet or an abrasive water jet in a cutting unit, the control device comprising:

a feeder composed of at least two flow-through areas positionable between a high-pressure water supply and a jet nozzle of the cutting unit, wherein at least one of the flow-through areas includes a high pressure area, and at least one of the flow-through areas includes a pressure-reducing area;

a first switchable valve arranged in the high-pressure area;

a second switchable valve arranged upstream of the first switchable valve;

a pressure-reducing mechanism arranged in the pressure reducing area; and

an impingement line coupled to the at least two flow-through areas and coupleable to the jet nozzle,

wherein at least the first switchable valve in the high-pressure area is controlled by at least one hole breakthrough sensor.

15. A method of controlling the impingement of water on a workpiece by a water jet or an abrasive water jet in a cutting unit, comprising:

supplying high-pressure water to a control device having a first flow-through area and a second flow-through area;

controlling flow of a portion of the high-pressure water through the first flow-through area using a switchable valve;

controlling flow of a portion of the high-pressure water through the second flow-through area;

piercing a portion of a workpiece with the portion of the water through the second flow-through area; and

switching to the portion of water through the first flow-through area to cut the workpiece,

wherein:

the switchable valve is arranged in parallel to the second flow-through area; and

at least one hole breakthrough sensor is structured and arranged to control the switchable valve.

16. The method according to claim 15 , wherein the first and second flow-through areas merge into an impingement line coupleable to a nozzle.

17. The method according to claim 15 , wherein the cutting unit further comprises another switchable valve, wherein the other switchable valve is arranged in the second flow-through area, and wherein the other switchable valve controls the switchable valve in the first flow-through area.

18. The method according to claim 15 , wherein the cutting unit further comprises a pressure-reducing mechanism arranged downstream from another switchable valve arranged in the second flow-through area and in the flow direction in the second flow-through area.

19. The method according to claim 15 , wherein the cutting unit further comprises a pressure-reducing mechanism arranged upstream from another switchable valve arranged in the second flow-through area and in the flow direction in the second flow-through area.

20. The method according to claim 15 , wherein at least the switchable valve in the first flow-through area is controlled by the at least one hole breakthrough sensor.

21. A method of controlling the impingement of water on a workpiece by a water jet or an abrasive water jet in a cutting unit, comprising:

supplying high-pressure water to a control device having a first flow-through area and a second flow-through area;

controlling flow of a portion of the high-pressure water through the first flow-through area using a first switchable valve;

controlling flow of a portion of the high-pressure water through the second flow-through area using a second switchable valve;

piercing a portion of a workpiece with the portion of the water through the second flow-through area; and

switching to the portion of water through the first flow-through area to cut the workpiece,

wherein the first switchable valve is controlled by the second switchable valve and by at least one hole breakthrough sensor.

Assignments (2)
CHANGE OF NAME Recorded Oct 25, 2010
From: BOEHLER HOCHDRUCKTECHNIK GMBH
To: BHDT GMBH
Reel/Frame 025190/0669 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 14, 2007
From: TRIEB, FRANZ; TIMMERMANN, ALWIN
To: BOEHLER HOCHDRUCKTECHNIK GMBH
Reel/Frame 019290/0373 →
Priority Claims (1)
AT GM129/2006 · Feb 22, 2006 · national
Continuity (1)
Related Publication 20070207702A1 · Sep 6, 2007