IP Library Granted Patent US 8,046,958
Granted Patent B2
US 8,046,958 · App. 12/908,785 · Granted Nov 1, 2011

Eave for a building

Assignee: Tuff Shed Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,046,958
App. No.
12/908,785
Granted
Nov 1, 2011
Kind
B2
Abstract

According to the invention, a method of making an eave for a roof on a building is disclosed. The method may include providing a structure with at least two sides and a roof frame. The method may further include coupling at least two of a plurality of eave blocks with a first trim piece. The method may also include coupling at least two of the plurality of eave blocks with a second trim piece. The method may further include coupling a roof piece with a top of the roof frame and a top of at least two of the plurality of eave blocks. In some embodiments, the eave blocks may include lumber having a grain direction and the method may include coupling the eave blocks with the first trim piece such that the grain direction is substantially parallel to a length of the first trim piece.

Claims (18)

1. A building with an eave, comprising:

a structure with at least two sides and a roof frame;

a siding member coupled to a side of the structure, the top edge of the siding member residing a predetermined distance below the top of the roof frame;

a roof piece; and

an eave assembly, wherein the eave assembly comprises two eave blocks, a trim piece coupled to the eave blocks, and a height extension piece coupled to the eave blocks;

wherein the height extension piece of the eave assembly is coupled to the side of the structure to couple the eave assembly to the side of the structure with the bottom edge of the height extension piece against the top edge of the siding member, and wherein the eave assembly is configured such that when the eave assembly is coupled to the structure, a top surface of each eave block resides coplanar with the top of the roof frame and at least part of the eave assembly protrudes below the top edge of the siding member;

and wherein the roof piece is coupled to the top of the roof frame and the top of each of the two eave blocks.

2. The building with an eave of claim 1 , wherein the trim piece is a first trim piece, and wherein the eave assembly further comprises a second trim piece coupled to the eave blocks.

3. The building with an eave of claim 1 , wherein the height extension piece is coupled to a portion of the roof frame.

4. A method of constructing a building, the method comprising:

framing at least two sides and a roof frame of the building;

applying a siding member to one of the sides, a top edge of the siding member residing at a predetermined height below the top of the roof frame;

constructing an eave assembly, the eave assembly comprising two eave blocks, a trim piece coupled to the eave blocks, and a height extension piece coupled to the eave blocks;

coupling the height extension piece of the eave assembly to the side of the building to couple the eave assembly to the side of the building, wherein coupling the height extension piece with the side of the building comprises placing a bottom edge of the height extension member against the top edge of the siding member; and

coupling a roof piece to the top of the roof frame and to the tops of the two eave blocks.

5. The method of constructing a building of claim 4 , wherein each of the two eave blocks includes a surface configured to reside parallel to the top of the roof frame after the eave assembly is coupled to the building, and wherein the eave assembly and the predetermined height are configured to place the surface coplanar to the top of the roof frame when the eave assembly is coupled to the building.

6. The method of constructing a building of claim 4 , wherein coupling the eave assembly to the side of the building comprises coupling the height extension piece to the side of the building.

7. The method of constructing a building of claim 4 , wherein coupling the eave assembly to the side of the building comprises coupling the height extension piece to a portion of the roof frame.

Assignments (1)
SECURITY INTEREST Recorded Jun 12, 2018
From: TUFF SHED, INC.
To: GUARANTY BANK AND TRUST COMPANY
Reel/Frame 046051/0590 →
Continuity (3)
Division 11684940 · Mar 12, 2007
Continuation In Part 11473858 · Jun 23, 2006
Related Publication 20110036023A1 · Feb 17, 2011