IP Library › Granted Patent US 8,129,652
Granted Patent B2
US 8,129,652 · App. 11/927,809 · Granted Mar 6, 2012

Welding stability system and method

Assignee: GM Global Technology Operations LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,129,652
App. No.
11/927,809
Filed
Oct 30, 2007
Granted
Mar 6, 2012
Kind
B2
Art Unit
3742
USPC
219/74
Abstract

A weld stability system for an arc welding apparatus and method of operation is disclosed. The weld stability system may comprise a shielding gas supply and a control assembly. The shielding gas supply may include a first source of gas, a second source of gas, a mixing chamber, a first valve selectively connecting the first source of gas to the mixing chamber, a second valve selectively connecting the second source of gas to the mixing chamber, and a shielding gas supply line configured to direct gas from the mixing chamber to a weld gun. The control assembly may include a controller operatively engaging the first and second valves, and at least one sensor configured to monitor a parameter of an arc welding process and communicate with the controller.

Claims (11)

1. A method of controlling a mixture of arc shielding gas during an arc welding operation, the method comprising the steps of:

(a) actuating a first valve connected to a first source of gas to selectively allow a first gas mixture to flow from the first source of gas into a mixing chamber and then into a weld gun;

(b) actuating a second valve connected to a second source of gas to selectively allow a second gas mixture, which is different from the first gas mixture, to flow from the second source of gas into the mixing chamber and then into the weld gun;

(c) conducting the arc welding operation;

(d) monitoring at least one weld parameter to detect arc instability during the arc welding operation;

(e) communicating the at least one weld parameter being monitored to a controller; and

(f) during the arc welding operation, automatically actuating the first and second valves with the controller when arc instability is detected during the arc welding operation to adjust the first gas mixture flowing from the first source of gas and the second gas mixture flowing from the second source of gas, respectively.

2. The method of claim 1 wherein step (f) is further defined by the controller employing a neural network processor to determine arc instability is present based on the communicated at least one weld parameter.

3. The method of claim 1 wherein step (d) is further defined by the at least one weld parameter being a visually detectable parameter that is monitored by an optical sensor.

4. The method of claim 1 wherein step (d) is further defined by the at least one weld parameter being a magnetic field strength adjacent to a weld location.

5. The method of claim 1 wherein step (d) is further defined by the at least one weld parameter being at least two weld parameters, and step (e) is further defined by communicating the at least two weld parameters being monitored to the controller.

Assignments (12)
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2014
From: WILMINGTON TRUST COMPANY
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034185/0587 →
CHANGE OF NAME Recorded Feb 10, 2011
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 025781/0035 →
SECURITY AGREEMENT Recorded Nov 8, 2010
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 025324/0057 →
RELEASE OF SECURITY INTEREST Recorded Nov 5, 2010
From: UAW RETIREE MEDICAL BENEFITS TRUST
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025315/0001 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025245/0780 →
SECURITY AGREEMENT Recorded Aug 28, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UAW RETIREE MEDICAL BENEFITS TRUST
Reel/Frame 023162/0187 →
SECURITY AGREEMENT Recorded Aug 27, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 023156/0215 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023155/0880 →
RELEASE OF SECURITY INTEREST Recorded Aug 20, 2009
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023124/0670 →
SECURITY AGREEMENT Recorded Apr 16, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
Reel/Frame 022554/0479 →
SECURITY AGREEMENT Recorded Feb 3, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 022201/0363 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 30, 2007
From: HAMPTON, JAY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 020033/0288 →
Continuity (1)
Related Publication 20090107960A1 · Apr 30, 2009