IP Library › Granted Patent US 8,166,279
Granted Patent B2
US 8,166,279 · App. 11/743,699 · Granted Apr 24, 2012

Method for predictive decoding of a load tagged pointer instruction

Assignee: International Business Machines Corporation
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,166,279
App. No.
11/743,699
Granted
Apr 24, 2012
Kind
B2
Abstract

Predictive decoding is achieved by fetching an instruction, accessing a predictor containing predictor information including prior instruction execution characteristics, obtaining predictor information for the fetched instruction from the predictor; and generating a selected one of a plurality of decode operation streams corresponding to the fetched instruction. The decode operation stream is selected based on the predictor information.

Claims (11)

1. A method for predictive decoding comprising:

fetching a load tagged pointer instruction, the load tagged pointer instruction comprising an associated pointer, the pointer having an associated tag and an associated indicator;

accessing a predictor containing predictor information for the fetched load tagged pointer instruction including prior instruction execution characteristics;

obtaining the predictor information for the fetched load tagged pointer instruction from the predictor;

determining whether the predictor information indicates a null value or a non-null value for the pointer associated with the load tagged pointer instruction;

analyzing a predictor confidence in response to determining that the predictor information indicates a null value for the pointer associated with the load tagged pointer instruction, wherein analyzing the predictor confidence comprises:

generating a safe decode sequence in response to determining that the predictor confidence is weak; and

generating a fast null decode sequence in response to determining that the predictor confidence is strong; and

generating a fast decode sequence in response to determining that the predictor information indicates a non-null value for the pointer associated with the load tagged pointer instruction.

2. The method of claim 1 , wherein generating the fast null decode sequence in response to determining that the predictor confidence is strong further comprises: executing the fast null decode sequence; determining whether the predictor information indicating a null value for the pointer associated with the load tagged pointer instruction is correct based on the execution, and, in response to determining that the predictor information is incorrect, causing a pipeline flush.

3. The method of claim 1 , wherein generating the fast decode sequence in response to determining that the predictor information indicates a non-null value for the pointer associated with the load tagged pointer instruction further comprises: executing the fast decode sequence; determining whether the predictor information indicating a non-null value for the pointer associated with the load tagged pointer instruction is correct based on the execution, and, in response to determining that the predictor information is incorrect, causing a pipeline flush.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2010
From: BLANER, BARTHOLOMEW; GSCHWIND, MICHAEL K
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 025100/0331 →
Continuity (1)
Related Publication 20080276069A1 · Nov 6, 2008