IP Library Granted Patent US 8,186,125
Granted Patent B2
US 8,186,125 · App. 12/621,806 · Granted May 29, 2012

Method of forming a jump pit

Assignee: Sportsfield Specialties, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,186,125
App. No.
12/621,806
Granted
May 29, 2012
Kind
B2
Abstract

A is provided for constructing a jump pit with a sand area. The form is constructed in sections. Each section has an inside wall and an outside wall. A support member is located between the outside wall and the inside wall. The sections are secured together onsite. Caps are mounted on the support members. The caps include an inclined surface which slops upwardly and away from the sand area forming the inclined surface. A cover over the sand area is supported by the inclined surface. Optionally, a chamber is located adjacent the outside wall. A grate covers the chamber and the grate is supported by a brace. A mat covers the grate. Openings in the grate and in the mat permit sand through them, thrown from the sand area to drop into the chamber.

Claims (24)

1. A method for forming a jump pit having a sand area, the method comprising:

providing an inclined surface disposed around at least a portion of the sand area of the jump pit, the inclined surface facing away from the sand area;

supporting a cover on the inclined surface over the sand area of the jump pit; and

providing a chamber surrounding the inclined surface for catching sand in the chamber.

2. The method of claim 1 wherein the providing the inclined surface comprises providing the inclined surface defining a flat inclined planar surface.

3. The method of claim 1 wherein the providing the inclined surface comprises providing the inclined surface along at least two sides of the sand area of the jump pit.

4. The method of claim 1 wherein the providing the inclined surface comprises providing the inclined surface along two longitudinal sides of the sand area of the jump pit having a rectangular configuration.

5. The method of claim 1 wherein the providing the inclined surface comprises providing the inclined surface around at least three sides of the sand area of the jump pit having a rectangular configuration.

6. The method of claim 1 wherein the providing the inclined surface comprises providing at least a portion of the inclined surface disposed adjacent to an upper surface of the sand area of the jump pit.

7. The method of claim 1 further comprising providing a member having a plurality of holes disposed over the chamber through which some of the sand thrown from the sand area of the jump pit may pass through the member and enter the chamber.

8. The method of claim 1 further comprising providing a grate over the chamber through which some of the sand thrown from the sand area of the jump pit may pass through the grate and enter the chamber.

9. The method of claim 1 further comprising providing a mat having a plurality of openings over the chamber through which some of the sand thrown from the sand area of the jump pit may pass through the plurality of openings and enter the chamber.

10. The method of claim 1 wherein the supporting the cover comprises supporting a generally rigid cover on the inclined surface over the sand area of the jump pit.

11. The method of claim 1 wherein the supporting the cover comprises supporting a plurality of generally rigid cover portions on the inclined surface over the sand area of the jump pit.

12. The method of claim 1 wherein the supporting the cover comprises supporting a cover comprising metal on the inclined surface over the sand area of the jump pit.

13. The method of claim 1 wherein the supporting the cover comprises supporting a plurality of cover portions comprising metal on the inclined surface over the sand area of the jump pit.

14. The method of claim 1 wherein the inclined surface comprises metal.

15. The method of claim 1 wherein the providing the inclined surface comprises providing the inclined surface attached to a base form which base form is disposed beneath a surface of an athletic field.

16. The method of claim 15 further comprising filling the base form with cement.

17. The method of claim 15 wherein the base form comprises support members having openings, and the filing of the base form with the cement comprises filing the cement between the openings in the support members.

18. The method of claim 1 wherein the base form comprises metal.

19. The method of claim 1 wherein the jump pit is permanently installed in an athletic field.

20. The method of claim 1 further comprising abutting the cover against a synthetic track surface.

21. The method of claim 1 wherein the providing the inclined surface comprises providing the inclined surface disposed beneath the surface of the athletic field.

Assignments (4)
CORRECTIVE ASSIGNMENT TO CORRECT THE INCORRECT LISTING OF SERIAL NO. 13/281041 AND REPLACE WITH 13/218041 PREVIOUSLY RECORDED ON REEL 032678 FRAME 0271. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jun 9, 2015
From: SPORTSFIELD SPECIALTIES, INC.
To: SPORTSFIELD INTELLECTUAL, LLC
Reel/Frame 035866/0819 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 15, 2014
From: SPORTSFIELD SPECIALTIES, LLC
To: SPORTSFIELD INTELLECTUAL, LLC
Reel/Frame 032673/0358 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 15, 2014
From: SPORTSFIELD SPECIALTIES, INC.
To: SPORTSFIELD INTELLECTUAL, LLC
Reel/Frame 032678/0271 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 3, 2009
From: GOULET, BURT
To: SPORTSFIELD SPECIALTIES, INC.
Reel/Frame 023600/0462 →
Continuity (3)
Continuation 11406200 · Apr 18, 2006
Provisional Application 60674236 · Apr 22, 2005
Related Publication 20100058572A1 · Mar 11, 2010