Method for controlling a half-bridge circuit and corresponding half-bridge circuit

Assignee: OSRAM AG
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,212,495
App. No.
12/524,087
Granted
Jul 3, 2012
Kind
B2
Abstract

A circuit arrangement for operation of lamps, including a half-bridge arrangement which has an upper and a lower electronic switch (Q 1 , Q 2 ), which are connected in series, each having a control connection and forming a neutral point (N 1 ) at their connection point. The circuit arrangement further includes: a load circuit, in which a load circuit current (IL 1 ) flows, is connected to the neutral point (N 1 ); a feedback device; a stop device; a timer coupled to the input of the stop device; and a trigger device. A sequence controller is configured to preset an on-time (t on ) during the preheating time of the electrodes of the lamps, by means of the timer, and after the preheating time of the electrodes of the lamps, this on-time is continuously increased until it corresponds at least to one quarter of the period duration of the resonant frequency of the reactance network.

Claims (35)

1. A circuit arrangement for operation of lamps, comprising:

a half-bridge arrangement which has an upper and a lower electronic switch, which are connected in series, each have a control connection and form a neutral point at their connection point;

a load circuit, in which a load circuit current flows, connected to the neutral point;

the load circuit includes a reactance network having a resonant frequency, and adapted so that a lamp can be connected thereto;

the load circuit is configured such that, during normal operation for a connected lamp after the opening of one of the electronic switches, the voltage on the respective other one of the electronic switches tends to zero after a transient time;

a feedback device which couples a feedback variable from the load circuit to the control connections of the electronic switches, such that the electronic switches are switched on alternately;

a stop device, which is coupled to the control connections of the upper and lower electronic switches and has an input to which a stop signal can be applied, with the stop device being configured for preventing the electronic switches from being switched on as long as the stop signal is in an off state;

a timer, which is coupled to the input of the stop device and produces the stop signal, which can assume an on state and an off state, the timer switching the stop signal to the on state for the duration of an on-time;

a trigger device which in each case emits a trigger signal to the timer after the transient time has elapsed, but at the latest when the load circuit current is tending to zero;

wherein a sequence controller configured to preset an on-time during the preheating time of the electrodes of the lamps, by means of the timer, which time is shorter than one quarter of the period duration of the resonant frequency of the reactance network and, after the preheating time of the electrodes of the lamps, this on-time is continuously increased until it corresponds at least to one quarter of the period duration of the resonant frequency of the reactance network, and

the on-time is increased continuously in 1 to 100 ms from the minimum value during the preheating time to the maximum value during operation of the lamps.

2. The circuit arrangement as claimed in claim 1 , further comprising a threshold value device configured to compare the load circuit current with a predeterminable current limit value, and, when this current limit value is reached, to emit a reset signal to the timer and to switch the stop device to the off state.

3. A circuit arrangement for operation of lamps, comprising:

a half-bridge arrangement which has an upper and a lower electronic switch, which are connected in series, each have a control connection and form a neutral point at their connection point;

a load circuit, in which a load circuit current flows, is connected to the neutral point;

the load circuit includes a reactance network having a resonant frequency, and adapted so that a lamp can be connected thereto;

the load circuit is configured such that, during normal operation for a connected lamp after the opening of one of the electronic switches, the voltage on the respective other one of the electronic switches tends to zero after a transient time;

a feedback device which couples a feedback variable from the load circuit to the control connections of the electronic switches, such that the electronic switches are switched on alternately;

a stop device, which is coupled to the control connections of the upper and lower electronic switches and has an input to which a stop signal can be applied, with the stop device being configured for preventing the electronic switches from being switched on as long as the stop signal is in an off state;

a timer, which is coupled to the input of the stop device and produces the stop signal, which can assume an on state and an off state, the timer switching the stop signal to the on state for the duration of an on-time;

a trigger device which in each case emits a trigger signal to the timer after the transient time has elapsed, but at the latest when the load circuit current is tending to zero;

wherein a sequence controller configured to preset an on-time during the preheating time of the electrodes of the lamps, by means of the timer, which time is shorter than one quarter of the period duration of the resonant frequency of the reactance network and, after the preheating time of the electrodes of the lamps, this on-time is continuously increased until it corresponds at least to one quarter of the period duration of the resonant frequency of the reactance network, and

the on-time is predetermined to be fixed at the operating frequency during the operating phase of the lamps.

4. The circuit arrangement as claimed in claim 3 , wherein, in the case of bipolar half-bridge switches, the on-time in the operating phase of the lamps is greater than one quarter of the period duration of the reactance network minus a storage time t s .

5. A circuit arrangement for operation of lamps, comprising:

a half-bridge arrangement which has an upper and a lower electronic switch, which are connected in series, each have a control connection and form a neutral point at their connection point;

a load circuit, in which a load circuit current flows, is connected to the neutral point;

the load circuit includes a reactance network having a resonant frequency, and adapted so that a lamp can be connected thereto;

the load circuit is configured such that, during normal operation for a connected lamp after the opening of one of the electronic switches, the voltage on the respective other one of the electronic switches tends to zero after a transient time;

a feedback device which couples a feedback variable from the load circuit to the control connections of the electronic switches, such that the electronic switches are switched on alternately;

a stop device, which is coupled to the control connections of the upper and lower electronic switches and has an input to which a stop signal can be applied, with the stop device being configured for preventing the electronic switches from being switched on as long as the stop signal is in an off state;

a timer, which is coupled to the input of the stop device and produces the stop signal, which can assume an on state and an off state, the timer switching the stop signal to the on state for the duration of an on-time;

a trigger device which in each case emits a trigger signal to the timer after the transient time has elapsed, but at the latest when the load circuit current is tending to zero;

wherein a sequence controller configured to preset an on-time during the preheating time of the electrodes of the lamps, by means of the timer, which time is shorter than one quarter of the period duration of the resonant frequency of the reactance network and, after the preheating time of the electrodes of the lamps, this on-time is continuously increased until it corresponds at least to one quarter of the period duration of the resonant frequency of the reactance network, and

the bipolar half-bridge switches have base series capacitors in the control loops.

Assignments (3)
CHANGE OF NAME Recorded May 24, 2012
From: PATENT-TREUHAND-GESELLSCHAFT FUR ELEKTRISCHE GLUHLAMPEN MBH
To: OSRAM AG
Reel/Frame 028274/0360 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2009
From: RUTTEN, IVO WILHELMUS JOHANNES MARIE
To: KONINKLIJKE PHILIPS ELECTRONICS, N.V.
Reel/Frame 023054/0993 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2009
From: LIESS, UWE; RUDOLPH, BERND
To: OSRAM GESELLSCHAFT MIT BESCHRANKTER HAFTUNG
Reel/Frame 023002/0845 →
Continuity (1)
Related Publication 20100102755A1 · Apr 29, 2010