US 8,360,682 · App. 12/516,262 · Granted Jan 29, 2013

Information method combined with dynamic consolidation and vacuum drainage for reinforcement of soft soil ground

Inventor: Shilong Xu (Shanghai, CN)
Assignee: Shanghai Harbour Soft Soil Treatment Engineering Co. Ltd.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,360,682
App. No.
12/516,262
Granted
Jan 29, 2013
Kind
B2
Abstract

A method for treating soft soil, including dividing a site into a plurality of subsections, investigating profile of the soft soil in each of the plurality of subsections, estimating expected settlement of the soft soil in each of the plurality of subsections, installing a plurality of water-tight systems around the site to block seepage of ambient groundwater from entering the site, installing a plurality of vacuum pipes in the plurality of subsections in a layered matrix form, connecting the plurality of vacuum pipes to a vacuum system via a plurality of ground horizontal pipes, placing a piezometer in each soil stratum, probing ramming energy thereof by conducting dynamic trials, measuring pore water pressure dissipation of each soil stratum to determine the spacing of the plurality of vacuum pipes, and performing a plurality of cycles of vacuum-compactions in each of the plurality of subsections.

Claims (10)

1. A method for treating soft soil, comprising:

(a) dividing a site into a plurality of subsections, investigating a profile of the soft soil in each of the plurality of subsections, and estimating expected settlement of the soft soil in each of the plurality of subsections;

(b) installing a plurality of water-tight systems around the site to block seepage of ambient groundwater from entering the site;

(c) installing a plurality of vacuum pipes in the plurality of subsections in a layered matrix form, connecting the plurality of vacuum pipes to a vacuum system via a plurality of ground horizontal pipes, placing a piezometer in each soil stratum, applying ramming energy thereto, and measuring pore water pressure dissipation of each soil stratum to determine the spacing of the plurality of vacuum pipes;

(d) performing a plurality of cycles of inter-moderated compactions in each of the plurality of subsections.

2. The method of claim 1 , further comprising conducting subsurface consolidation after Step (b) and before Step (c), including installing a plurality of vacuum pipes into subsurface soil, conducting vacuuming while compacting the subsurface soil using a trailer, so as to decrease water contents of the subsurface soil and improve its bearing capacities.

3. The method of claim 1 , further comprising eliminating differential settlements in step (d), including leveling the site using a bulldozer after each cycle of vacuum-compaction, calculating average settlement of each subsection, comparing the average settlement with an estimated value, and if the average settlement is inadequate, performing another cycle of vacuum-compaction till the estimated value is met.

4. The method of claim 1 , wherein said vacuum-compactions include densification by dynamic or vibration compaction.

5. The method of claim 1 , wherein each water-tight system includes a plurality of vacuum pipes installed at 2-3 m away around site, the vacuum pipes being connected to a ground horizontal vacuum system, so as to perform vacuum drainage during the treatment.

6. The method of claim 1 , wherein the ramming energy ranges from 500˜3500 kN·m.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 22, 2019
From: SHANGHAI GEOHARBOUR CONSTRUCTION GROUP CO., LTD.; XU, SHILONG
To: SHANGHAI GEOHARBOUR CONSTRUCTION GROUP CO., LTD.
Reel/Frame 048085/0416 →
CHANGE OF NAME Recorded Dec 21, 2018
From: SHANGHAI HARBOUR SOFT SOIL TREATMENT ENGINEERING CO., LTD.
To: SHANGHAI HARBOUR SOFT SOIL TREATMENT ENGINEERING (GROUP) CO., LTD.
Reel/Frame 047977/0308 →
CHANGE OF NAME Recorded Dec 21, 2018
From: SHANGHAI HARBOUR CONSTRUCTION GROUP CO., LTD.
To: SHANGHAI GEOHARBOUR CONSTRUCTION GROUP CO., LTD.
Reel/Frame 048285/0610 →
CHANGE OF NAME Recorded Dec 21, 2018
From: SHANGHAI HARBOUR SOFT SOIL TREATMENT ENGINEERING (GROUP) CO., LTD.
To: SHANGHAI HARBOUR CONSTRUCTION GROUP CO., LTD.
Reel/Frame 048318/0370 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 26, 2009
From: XU, SHILONG
To: SHANGHAI HARBOUR SOFT SOIL TREATMENT ENGINEERING CO. LTD.; XU, SHILONG
Reel/Frame 022733/0767 →
Priority Claims (1)
CN 2006 1 0119014 · Dec 1, 2006 · national
Continuity (1)
Related Publication 20100061806A1 · Mar 11, 2010