Method of recycling process gas in electrochemical processes

Inventors: Fritz Gestermann (Leverkusen, DE); Thorsten Leidig (Duisburg, DE); Alfred Soppe (Issum, DE)
Assignee: Bayer MaterialScience AG
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,377,284
App. No.
12/436,559
Granted
Feb 19, 2013
Kind
B2
Abstract

The invention relates to a method for recycling educt-containing process gas (residual gas) in electrochemical processes with at least one gas diffusion electrode while using a gas jet pump for directly reintroducing the residual gas in the electrochemical process.

Claims (19)

1. A method of recycling process gas into an electrochemical process comprising at least one gas diffusion electrode, said method comprising:

feeding feed gas into the electrochemical process via a gas jet pump under a pressure which exceeds a process pressure,

expanding the feed gas to process pressure in a gas jet pump, and generating a suction pressure which is less than the process pressure, and

aspirating feed gas-containing tail gas by means of the suction pressure generated in a gas jet pump and recycling the tail gas into the electrochemical process via at least one control member, wherein the at least one control member is positioned in the tail-gas stream, off-gas stream and/or recycling-gas stream;

wherein the feed gas and tail gas are fed into the electrochemical process in 1.01- to 10-fold stoichiometric excess, based on consumption of feed gas in the electrochemical process.

2. The method of claim 1 , wherein a part of the tail gas is discharged as an off-gas stream.

3. The method of claim 2 , wherein the process pressure is controlled via a further control member in the off-gas stream.

4. The method of claim 3 , wherein the feed gas pressure exceeds the process pressure by from 0.1 to 40 bar.

5. The method of claim 2 , wherein the electrochemical process is carried out under atmospheric pressure.

6. The method of claim 2 , wherein the process pressure is from 1 to 500 mbar below atmospheric pressure.

7. The method of claim 2 , wherein the feed gas pressure exceeds the process pressure by from 0.1 to 40 bar.

8. The method of claim 1 , wherein the tail gas is fed to the electrochemical process via the gas jet pump together with feed gas.

9. The method of claim 8 , wherein the feed gas pressure exceeds the process pressure by from 0.1 to 40 bar.

10. The method of claim 1 , wherein the process pressure exceeds atmospheric pressure by from 0.001 to 10 bar.

11. The method of claim 1 , wherein the electrochemical process is carried out under atmospheric pressure.

12. The method of claim 1 , wherein the process pressure is from 1 to 500 mbar below atmospheric pressure.

13. The method of claim 1 , wherein the feed gas pressure exceeds the process pressure by from 0.1 to 40 bar.

14. The method of claim 1 , wherein the tail gas is recycled into the electrochemical process via at least one control valve positioned on the recycle stream.

15. The method of claim 1 , wherein the recycled tail gas is fed directly into the gas jet pump.

Assignments (2)
CHANGE OF NAME Recorded Mar 30, 2016
From: BAYER MATERIALSCIENCE AG
To: COVESTRO DEUTSCHLAND AG
Reel/Frame 038399/0469 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 17, 2009
From: GESTERMANN, FRITZ; LEIDIG, THORSTEN; SOPPE, ALFRED
To: BAYER MATERIALSCIENCE AG
Reel/Frame 022977/0971 →
Priority Claims (1)
DE 101 49 779 · Oct 9, 2001 · national
Continuity (2)
Continuation 10491757
Related Publication 20090211915A1 · Aug 27, 2009