IP Library › Granted Patent US 8,647,224
Granted Patent B2
US 8,647,224 · App. 13/140,655 · Granted Feb 11, 2014

Generator arrangement for a wind power plant

Inventors: Anton Paweletz (Fellbach, DE); Heinz-Josef Tenberge (Sprockhoevel, DE)
Assignee: Robert Bosch GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,647,224
App. No.
13/140,655
Granted
Feb 11, 2014
Kind
B2
Abstract

A generator arrangement for a wind power plant includes a ring-shaped primary part, a ringshaped secondary part, and a planetary transmission arrangement disposed inside the primary part and the secondary part. The planetary transmission arrangement comprises an internal gear, a sun gear, and at least two planet gears. The sun gear is substantially ringshaped, having an inner wall, and outer wall, and a web connecting the inner wall and the outer wall. The internal gear is disposed between the inner wall and the outer wall of the sun gear and is supported at the outer wall of the sun gear.

Claims (34)

1. A generator arrangement for a wind energy installation comprising:

an annular primary part;

an annular secondary part; and

an epicyclic gearbox arrangement, which is arranged within the primary part and the secondary part,

wherein the epicyclic gearbox arrangement has a ring gear, a sun gear, and at least two planet gears,

wherein the sun gear is in the form of an annular shell with an inner wall, an outer wall, and a web which connects the inner wall and the outer wall, and

wherein the ring gear is arranged between the inner wall and the outer wall of the sun gear, and is supported by the outer wall of the sun gear.

2. The generator arrangement as claimed in claim 1 , wherein the ring gear is further supported by a planet support configured for supporting the at least two planet gears.

3. The generator arrangement as claimed in claim 1 , wherein the at least two planet gears roll between the ring gear and the inner wall of the sun gear.

4. The generator arrangement as claimed in claim 1 , wherein the annular secondary part is arranged on the outer wall of the sun gear.

5. The generator arrangement as claimed in claim 1 , wherein:

the ring gear is essentially in the form of an annular shell with an inner wall, an outer wall and a web which connects the inner wall and the outer wall, and

the annular primary part and the annular secondary part are arranged between the inner wall and the outer wall of the ring gear.

6. The generator arrangement as claimed in claim 5 , wherein the annular primary part is arranged on the outer wall of the ring gear.

7. The generator arrangement as claimed in claim 1 , wherein:

the epicyclic gearbox arrangement is preceded by a second gearbox arrangement, and

the second gearbox arrangement is a two-step gearbox.

8. The generator arrangement as claimed in claim 7 , wherein the second gearbox arrangement and the ring gear are connected by means of at least one elastic element.

9. The generator arrangement as claimed in claim 7 , wherein:

the planet support can be subdivided into an input-drive part and an output-drive part,

the input-drive part is arranged on the second gearbox arrangement, and

the output-drive part is arranged on the epicyclic gearbox arrangement.

10. The generator arrangement as claimed in claim 1 , wherein the generator is in the form of a doubly-fed asynchronous generator.

11. The generator arrangement as claimed in claim 1 , wherein the generator is in the form of a permanent-magnet synchronous generator.

12. A wind energy installation comprising:

a generator arrangement including;

an annular primary part,

an annular secondary part, and

an epicyclic gearbox arrangement, which is arranged within the primary part and the secondary part,

wherein the epicyclic gearbox arrangement has a ring gear, a sun gear, and at least two planet gears,

wherein the sun gear is in the form of an annular shell with an inner wall, an outer wall, and a web,

wherein the web connects the inner wall and the outer wall,

wherein the ring gear is arranged between the inner wall and the outer wall of the sun gear, and

wherein the ring gear is supported by the outer wall of the sun gear.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 12, 2016
From: ROBERT BOSCH GMBH
To: ZF FRIEDRICHSHAFEN AG
Reel/Frame 037729/0297 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 7, 2011
From: PAWELETZ, ANTON; TENBERGE, HEINZ-JOSEF
To: ROBERT BOSCH GMBH
Reel/Frame 027182/0590 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 16, 2011
From: HOBBS, CLINTON PAUL
To: MCCROMETER, INC.
Reel/Frame 026758/0844 →
Priority Claims (1)
DE 10 2008 063 875 · Dec 19, 2008 · national
Continuity (1)
Related Publication 20120032450A1 · Feb 9, 2012