IP Library Granted Patent US 8,746,322
Granted Patent B2
US 8,746,322 · App. 13/522,423 · Granted Jun 10, 2014

Technology of production of bimetallic and multilayer casts by gravity or spun casting

Inventor: Arnost Svoboda (Zidlochovice, CZ)
Assignee: Cronite CZ S.R.O.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,746,322
App. No.
13/522,423
Granted
Jun 10, 2014
Kind
B2
Abstract

Technology of production of bimetallic and multilayer casts by gravity or spun casting, at which at least two different metal materials are being gradually cast into the mold, while before casting of the second material there is started feeding of a flame into the mold and the flame is created by stream of aflame inflammable gas. Stream of aflame inflammable gas is created by hydrogen flame.

Claims (8)

1. A method of producing bimetallic and multilayer casts by gravity or spun casting, comprising:

providing a mould having a mould cavity;

sequentially casting at least two different metal materials in the mould by pouring in the mould cavity a first molten material and then pouring in the mould cavity a second molten material over the first molten material; and

feeding from a burner a flame of aflame hydrogen gas into the mould cavity at least before the starting of the pouring of the second molten material in the mould cavity, the aflame hydrogen gas passing through the mould cavity to consume all oxygen in the mould and then escaping to further burn in a free space above the mould;

wherein the burner is inserted into the mould cavity and the flame is fed into the mould cavity to consume all the oxygen in the mould cavity, and the flame is continuously fed into the mould cavity after pouring in the first molten material at least until the second molten material is poured into the mould cavity, wherein the second molten material is poured after a time delay to allow for realization of a solidified coating in the first molten material while the flame is fed into the mould, and wherein the burner comprises a tube and the aflame hydrogen is fed through the tube.

2. A method according to claim 1 , wherein feeding of the flame into the mould is started before pouring of the first molten material into the mould.

3. A method according to claim 1 , further comprising finishing the feeding of the flame into the mould when the second molten material covers a whole surface of the first molten material in the mould.

4. A method according to claim 1 , further comprising finishing feeding of the flame into the mould when pouring of the second molten material into the mould is completed.

Assignments (2)
CHANGE OF NAME Recorded Apr 21, 2014
From: AFE CRONITE CZ S.R.O
To: CRONITE CZ S.R.O.
Reel/Frame 032732/0240 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 16, 2012
From: SVOBODA, ARNOST
To: AFE CRONITE CZ S.R.O
Reel/Frame 028795/0825 →
Priority Claims (1)
CZ 2010-88 · Feb 4, 2010 · national
Continuity (1)
Related Publication 20120312495A1 · Dec 13, 2012