IP Library Granted Patent US 8,753,040
Granted Patent B2
US 8,753,040 · App. 13/676,680 · Granted Jun 17, 2014

Offshore installation method of a wind power generator and its fabrication segments

Inventors: Chao-Cheng Wu (New Taipei, TW); Po-Feng Lin (New Taipei, TW); Che-Yuan Liu (New Taipei, TW)
Assignee: Ship and Ocean Industries R&D Center
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,753,040
App. No.
13/676,680
Granted
Jun 17, 2014
Kind
B2
Abstract

The invention relates to an offshore installation method of a wind power generator and its fabrication segments. A prefabricated wind power generator is finished at a first location, and then carried by a ship to a second location for installation, largely saving installation time. With a tower inserted down through a base to shrink height of the generator, the ship can not only effectively diminish shaking posed by wind and sea waves, advancing steadiness of delivery, but also be one with smaller tonnage to save cost.

Claims (8)

1. A method of installing a wind power generator at a shallow water region, said shallow water region having a depth less than 30 meters, a first location being located at a shore, and a second location remote from the first location; wherein said wind power generator has a base provided with a central hole and a first connecting portion located at a top end of the base, a connecting member provided with a second connecting portion located at a bottom end and a first joint portion located at a top end of the member, a tower provided with a second joint portion located at a bottom end of the tower, a nacelle, and a blade wheel; said method comprising:

stage (A): positioning the base at the first location and inserting said tower directly through said central hole, fixing the nacelle on said tower, and then fixing said blade wheel to said nacelle so as to form a prefabricated wind power generator;

stage (B): lifting said prefabricated wind power generator with a ship and carrying the prefabricated wind power generator to a second location; and

stage (C): installing the prefabricated wind power generator by ballasting said ship to the seabed, descending the base to said second location, lifting said tower out of the central hole of said base, bolting the second connecting portion of the connecting member to said first connecting portion of the base, and bolting said second joint portion of the tower to said first joint portion of the connecting member.

2. A method of installing a wind power generator at a shallow water region, said shallow water region having a depth less than 30 meters, a first location being located at a shore, and a second location remote from the first location; wherein said wind power generator has a base provided with a central hole and a first connecting portion located at a top end of the base, a connecting member provided with a second connecting portion located at a bottom end and a first joint portion located at a top end of the member, wherein said connecting member is further provided with a positioning bar to correspondingly extend into a positioning hole further provided in said tower, a tower provided with a second joint portion located at a bottom end of the tower, a plurality of buffers to be deposited between said first joint portion and said second joint portion, a nacelle, and a blade wheel; said method comprising:

stage (A): positioning the base at the first location and inserting said tower directly through said central hole, fixing the nacelle on said tower, and then fixing said blade wheel to said nacelle so as to form a prefabricated wind power generator;

stage (B): lifting said prefabricated wind power generator with a ship and carrying the prefabricated wind power generator to a second location; and

stage (C): installing the prefabricated wind power generator by ballasting said ship to the seabed, descending the base to said second location, lifting said tower out of the central hole of said base, bolting the second connecting portion of the connecting member to said first connecting portion of the base, depositing said buffers on said first joint portion of the connecting portion, and lowering said second joint portion of the tower to press on said buffers with the positioning bar of said connecting member inserted into said positioning hole of said tower, enabling said second joint portion to slowly approach said first joint portion.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 14, 2012
From: WU, CHAO-CHENG; LIN, PO-FENG; LIU, CHE-YUAN
To: SHIP AND OCEAN INDUSTRIES R&D CENTER
Reel/Frame 029296/0820 →
Continuity (1)
Related Publication 20140133921A1 · May 15, 2014