IP Library Granted Patent US 8,783,350
Granted Patent B2
US 8,783,350 · App. 13/210,473 · Granted Jul 22, 2014

Processes for fracturing a well

Inventor: Philip M Snider (Houston, TX)
Assignee: Marathon Oil Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,783,350
App. No.
13/210,473
Granted
Jul 22, 2014
Kind
B2
Abstract

Processes and systems for fracturing a formation are disclosed. Tools that may be selectively opened and closed are positioned on a tubular liner that in turn is positioned within a subterranean well bore. Separate pairs of packers are also attached to and positioned along the tubular liner so as to straddle each tool. Fracturing fluid is pumped from the surface through the tubular and open tool and past a pair of packers at a temperature and injection rate which causes contraction of the tubular liner. Thereafter, the velocity of the fracturing fluid is sufficient to set the pair of packers adjacent the open tool. Continued pumping of fracturing fluid is directed by the set packers into the adjacent subterranean environs at a pressure sufficient to fracture the subterranean environs.

Claims (47)

1. A process comprising:

pumping a first volume of fracturing fluid through at least a portion of tubing positioned in a subterranean well bore and through a first port in the tubing at a velocity sufficient to deform two first packers that are carried on said tubing into sealing engagement with the well bore, said first port being positioned between said two first packers;

pumping said first volume of fracturing fluid through said first port at a pressure sufficient to fracture a subterranean environs; and thereafter

pumping a second volume of fracturing fluid through at least the portion of tubing positioned in a subterranean well bore and through a second port in the tubing at a velocity sufficient to deform two second packers that are carried on said tubing into sealing engagement with the well bore, said second port being positioned between said two second packers.

2. The process of claim 1 wherein said first volume of fracturing fluid is directed into said subterranean environs adjacent said first port.

3. The process of claim 1 wherein said first port remains open while pumping the second volume of fracturing fluid through the second port.

4. A process comprising:

pumping a stimulation fluid through a liner positioned in an open hole of a subterranean well for a period of time sufficient to allow a majority of movement of said liner due to a change in temperature and pressure caused by the stimulation fluid to occur; and thereafter

increasing the rate at which the stimulation fluid is pumped to actuate at least one packer that is positioned on the exterior of said liner.

5. The process of claim 4 wherein said open hole is substantially horizontal.

6. A process comprising:

pumping a first volume of fracturing fluid within an annulus formed between a subterranean well bore and a tubular positioned within said subterranean well bore at a velocity sufficient to deform two first packers into sealing engagement with the well bore;

pumping at least a portion of said first volume of fracturing fluid into said subterranean environs in proximity to said at least one first packer at a pressure sufficient to fracture said subterranean environs; and thereafter

pumping a second volume of fracturing fluid within said annulus at a velocity sufficient to deform two second packers into sealing engagement with the well bore.

7. The process of claim 6 wherein said first volume of fracturing fluid is pumped through a first port in said tubular and said at least a portion of said first volume of fracturing fluid is directed into said subterranean environs adjacent said first port.

8. The process of claim 7 wherein said at least one first packer is two first packers and said first port is positioned between said two first packers.

9. The process of claim 6 wherein said subterranean well bore is an open hole.

10. The process of claim 6 wherein fluids produced from said subterranean environs is produced to the surface of the earth through said tubular.

11. The process of claim 10 wherein said at least one first packer is designed to inhibit flow in both directions along said annulus.

12. A process comprising:

actuating two first packers into sealing engagement with a subterranean well bore adjacent a first opened port in a tubular positioned in said subterranean wellbore, said actuation caused by the flow rate of fracturing fluid and, said tubular having a plurality of closed ports and packers adjacent to each of said plurality of closed ports which are not actuated.

13. The process of claim 12 further comprising:

actuating at least one second packer into sealing engagement with said subterranean well bore adjacent a second opened port in a the tubular positioned in said subterranean well bore.

14. A process comprising:

pumping a first volume of fracturing fluid through at least a portion of tubing positioned in a subterranean well bore at a velocity sufficient to deform at least one packer that is carried on said tubing into sealing engagement with the well bore, wherein said first volume of fracturing fluid is pumped through a first port in said tubing; and thereafter,

pumping said first volume of fracturing fluid at a pressure sufficient to fracture a subterranean environs, wherein said first volume of fracturing fluid is directed into said subterranean environs adjacent said first port;

closing said first port;

pumping a second volume of fracturing fluid through at least a portion of the tubing positioned in the subterranean well bore at a velocity sufficient to deform at least one second packer that is carried on said tubing into sealing engagement with the well bore; and thereafter,

pumping said second volume of fracturing fluid at a pressure sufficient to fracture a subterranean environs.

15. The process of claim 14 wherein said first volume of fracturing fluid is pumped through a second port in said tubing and said first volume of fracturing fluid is directed into said subterranean environs adjacent said second port.

16. The process of claim 15 wherein two packers are carried on said tubing and said second port is positioned between said two packers.

17. The process of claim 14 wherein said first port is closed by blocking the interior of the tubing string between the first port and the second port.

18. The process of claim 17 wherein said second volume of fracturing fluid is pumped through a second port in said tubing and said second volume of fracturing fluid is directed into said subterranean environs adjacent said second port.

19. The process of claim 18 wherein two packers are carried on said tubing and said second port is positioned between said two packers.

20. The process of claim 17 wherein said subterranean well bore is an open hole.

21. The process of claim 17 wherein fluids from said subterranean environs are produced to the surface of the earth through said tubular.

22. The process of claim 21 wherein said at least one second packer is designed to inhibit flow in both directions along said annulus.

23. The process of claim 17 wherein the interior of the tubing string is fully blocked.

24. A process comprising:

pumping a first volume of fracturing fluid through a first port in a tubular positioned within a subterranean well bore and within an annulus formed between the subterranean well bore and the tubular at a velocity sufficient to deform at least one first packer into sealing engagement with the well bore; and thereafter,

pumping at least a portion of said first volume of fracturing fluid into said subterranean environs adjacent said first port and in proximity to said at least one first packer at a pressure sufficient to fracture said subterranean environs;

closing said first port;

pumping a second volume of fracturing fluid within said annulus at a velocity sufficient to deform at least one second packer into sealing engagement with the well bore; and thereafter,

pumping at least a portion of said second volume of fracturing fluid into said subterranean environs in proximity to said at least one second packer at a pressure sufficient to fracture said subterranean environs.

25. The process of claim 24 wherein said second volume of fracturing fluid is directed into said subterranean environs adjacent said second port.

26. The process of claim 24 wherein said first port is closed by blocking the interior of the tubing string between the first port and the second port.

27. The process of claim 26 wherein the interior of the tubing string is fully blocked.

Assignments (9)
PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Recorded Apr 26, 2023
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 063470/0629 →
SECURITY INTEREST Recorded Oct 1, 2021
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 057683/0706 →
RELEASE OF SECURITY INTEREST Recorded Oct 1, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 057683/0423 →
RELEASE OF SECURITY INTEREST Recorded Aug 28, 2020
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 053838/0323 →
SECURITY INTEREST Recorded Aug 28, 2020
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 054288/0302 →
SECURITY INTEREST Recorded Dec 26, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT
Reel/Frame 051419/0140 →
SECURITY INTEREST Recorded Dec 18, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY INC.; PRECISION ENERGY SERVICES INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT
Reel/Frame 051891/0089 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 8, 2017
From: MARATHON OIL COMPANY
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Reel/Frame 042275/0913 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 26, 2011
From: SNIDER, PHILIP M
To: MARATHON OIL COMPANY
Reel/Frame 026813/0780 →
Continuity (1)
Related Publication 20130043030A1 · Feb 21, 2013