IP Library Granted Patent US 8,798,785
Granted Patent B2
US 8,798,785 · App. 13/713,627 · Granted Aug 5, 2014

System and process for real time monitoring of mail and print jobs and providing real time verification of mail piece completion

Inventor: Christopher M Brown (Lebanon, IN)
Assignee: Allison Payment Systems, LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,798,785
App. No.
13/713,627
Granted
Aug 5, 2014
Kind
B2
Abstract

The present application relates to a system and method for tracking individual pieces within a printing or mailing job, as well as tracking completed trays, skids, or containers of printed documents.

Claims (54)

1. A method for tracking documents within a document production pathway, the method comprising:

defining, using a processor, a production sequence of discrete tasks to be performed on each of a plurality of documents to be produced by a document production facility, wherein each of the plurality of documents is assigned a sequence number operable to individually identify each of the plurality of documents;

defining, using the processor, a production pathway in the document production facility to produce each of the plurality of documents;

defining, using the processor, a document sequence for the plurality of documents to be produced;

performing the production sequence of discrete tasks on each of the plurality of documents in the production pathway;

placing each of the plurality of documents in one or more trays in the document sequence after each of the discrete tasks is performed;

tagging each of the one or more trays with a tray identifier operable to individually identify each of the one or more trays;

determining, using the processor, the sequence number for each of the first document of the plurality of documents placed in each tray and the last document of the plurality of documents placed in each tray;

recording, using the processor and a database, associations between the sequence numbers for each of the first document of the plurality of documents placed in each tray and the last document of the plurality of documents placed in each tray and tray identifiers for each of the one or more trays after each discrete task in the production sequence is performed; and

tracking, using the processor, each tray within the production pathway in the database.

2. The method of claim 1 , the method further comprising:

removing at least one document from the plurality of documents in the production pathway;

recording, using the processor and the database, each sequence number for each of the at least one document removed from the production pathway;

placing each of the at least one document that is removed from the production pathway in a designated tray for removed documents;

recording, using the processor and the database, associations between each sequence number of each of the at least one document removed from the production pathway and the tray identifier of the designated tray for removed documents; and

tracking, using the processor, the designated tray within the production pathway in the database.

3. The method of claim 2 , the method further comprising:

determining, using the processor and the database, the location within the document production facility of the at least one document removed from the production pathway using the sequence number of the at least one document.

4. The method of claim 1 , the method further comprising:

determining, using the processor and the database, the location of a selected document within the document production facility using the sequence number of the selected document.

5. The method of claim 1 , the method further comprising:

extracting document information for each of the plurality of documents from a project file using the processor to generate a command file, wherein the command file comprises specifications for each of the plurality of documents to be produced by the document production facility, the production pathway to produce each of the plurality of documents, the production sequence of discrete tasks to be performed on each of the plurality of documents, and the document sequence of each of the plurality of documents to be produced.

6. The method of claim 5 , wherein the specifications for each of the plurality of documents comprise customized information, a number and sequence of inserts, and/or a weight of the document.

7. The method of claim 6 , the method further comprising:

determining, using the processor, the accuracy of each of the plurality of documents produced based on the specifications; and

removing a selected document from the production pathway after determining that the selected document is inaccurate.

8. The method of claim 1 , wherein the document production facility comprises at least two physical locations or premises.

9. The method of claim 1 , wherein each tray identifier and each document sequence number may be determined using a counting apparatus.

10. The method of claim 9 , wherein the counting apparatus comprises an optical character verification system.

11. The method of claim 1 , the method further comprising:

placing at least one of the one or more trays on a skid;

tagging the skid with a skid identifier operable to individually identify each skid;

recording, using the processor and a database, associations between the skid identifier and the tray identifier of the at least one of the one or more trays and the sequence numbers of the plurality of documents associated with the tray identifier of the at least one of the one or more trays; and

tracking, using the processor, each skid within the document production facility in the database.

12. The method of claim 11 , the method further comprising:

determining, using the processor and the database, the location of a selected skid within the document production facility using the skid identifier, tray identifier, or sequence number of a selected document.

13. The method of claim 11 , wherein the skid is tagged with a radio-frequency identification device.

14. The method of claim 1 , wherein the locations within the production pathway of a selected tray and/or document sequence number are reported via a user interface operably connected to the processor.

15. The method of claim 1 , wherein the discrete tasks comprise printing, inserting, stapling, sorting, weighing, folding, and/or sealing.

16. A method for tracking documents within a document production pathway, the method comprising:

extracting document specifications from a project file using a processor for each of a plurality of documents to be produced by a document production facility;

defining, using the processor, a production sequence of discrete tasks to be performed on each of a plurality of documents, wherein each of the plurality of documents is assigned a sequence number operable to individually identify each of the plurality of documents;

defining, using the processor, a production pathway in the document production facility to produce each of the plurality of documents;

defining, using the processor, a document sequence for the plurality of documents to be produced;

performing the production sequence of discrete tasks on each of the plurality of documents in the production pathway;

recording, using the processor and a database, the sequence number for each of the plurality of documents after each discrete task in the production sequence is performed; and

tracking, using the processor, each of the plurality of documents within the production pathway in the database.

17. The method of claim 16 , the method further comprising:

removing at least one document from the plurality of documents in the production pathway; and

recording, using the processor and the database, each sequence number for each of the at least one document removed from the production pathway.

18. The method of claim 16 , the method further comprising:

determining, using the processor and the database, the location of a selected document within the document production facility using the sequence number of the selected document.

19. The method of claim 16 , wherein each document sequence number may be determined using a counting apparatus.

20. The method of claim 16 , wherein the specifications for each of the plurality of documents comprise customized information, a number and sequence of inserts, and/or a weight of the document.

Assignments (5)
RELEASE OF SECURITY INTEREST AT REEL/FRAME 032848/0920 Recorded Jul 19, 2018
From: NORTHCREEK MEZZANINE FUND II, L.P.
To: ALLISON PAYMENT SYSTEMS, LLC
Reel/Frame 046591/0420 →
RELEASE OF SECURITY INTEREST AT REEL/FRAME 032838/0931 Recorded Jul 18, 2018
From: ENTERPRISE BANK & TRUST
To: ALLISON PAYMENT SYSTEMS, LLC
Reel/Frame 046591/0186 →
SECURITY INTEREST Recorded May 8, 2014
From: ALLISON PAYMENT SYSTEMS, LLC
To: NORTHCREEK MEZZANINE FUND II, L.P.
Reel/Frame 032848/0920 →
SECURITY INTEREST Recorded May 7, 2014
From: ALLISON PAYMENT SYSTEMS, LLC
To: ENTERPRISE BANK & TRUST
Reel/Frame 032838/0931 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 8, 2013
From: BROWN, CHRISTOPHER M.
To: ALLISON PAYMENT SYSTEMS, LLC
Reel/Frame 029949/0143 →
Continuity (3)
Division 12234385 · Sep 19, 2008
Provisional Application 60973555 · Sep 19, 2007
Related Publication 20140043647A1 · Feb 13, 2014