IP Library › Granted Patent US 8,805,632
Granted Patent B2
US 8,805,632 · App. 13/071,646 · Granted Aug 12, 2014

Method and apparatus for clock synchronization

Inventors: Radu Coman (Hannover, DE); Michael Neubert (Braunschweig, DE)
Assignee: Baker Hughes Incorporated
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,805,632
App. No.
13/071,646
Granted
Aug 12, 2014
Kind
B2
Abstract

A system for synchronizing components of a downhole system includes: a source assembly including a source clock; an electromagnetic source associated with the source assembly and configured to emit an electromagnetic signal into an earth formation at a transmission time; a receiver assembly including a receiver clock; an electromagnetic receiver associated with the receiver clock and configured to detect the electromagnetic signal; and a processor configured to identify a receipt time of the electromagnetic signal based on the receiver clock and adjust the receiver clock by comparing the transmission time to the receipt time.

Claims (13)

1. A method of estimating a property of an earth formation, comprising:

disposing a carrier in a borehole in the earth formation, the carrier including one of a receiver assembly and a source assembly, the receiver assembly including a receiver clock and the source assembly including a source clock;

transmitting an electromagnetic (EM) signal through the earth formation from an EM source in the source assembly at a pre-selected transmission time, the transmission time being identified based on the source clock;

detecting the electromagnetic signal via an EM detector in the receiver assembly;

identifying a receipt time of the detected electromagnetic signal using the receiver clock;

adjusting the receiver clock by comparing the transmission time to the receipt time to synchronize the receiver clock to the source clock;

emittng a seismic signal into the earth formation from a seismic source in the source assembly;

detecting the seismic signal by at least one seismic receiver disposed in the receiver assembly; and

estimating at least one property of the formation based on the detected seismic signal.

2. The method of claim 1 , wherein the carrier is selected from at least one of a borehole string, a drill string, a downhole tool, a bottomhole assembly (BHA), a downhole sub, a wireline carrier, a drill bit assembly and a logging-while-drilling (LWD) carrier.

3. The method of claim 1 , wherein the carrier includes the seismic receiver, and the seismic source is disposed at a surface location.

4. The method of claim 1 , Wherein the carrier includes the seismic source, and the seismic receiver is disposed at least one of a surface location and a remote downhole location.

5. The method of claim 1 , wherein comparing includes combining the transmission time with a transit time of the electromagnetic signal to calculate a correct receipt time, and comparing the correct receipt time to the measured receipt time to calculate a relative drift between the source clock and the receiver clock.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 27, 2011
From: COMAN, RADU; NEUBERT, MICHAEL
To: BAKER HUGHES INCORPORATED
Reel/Frame 026185/0832 →
Continuity (2)
Provisional Application 61321658 · Apr 7, 2010
Related Publication 20110251813A1 · Oct 13, 2011