Bustle pipe arrangement

Inventors: Jean-Paul Simoes (Walferdange, LU); Lionel Hausemer (Steinsel, LU); Manfred Moller (Wiesbaden-Auringen, DE); Paul Tockert (Berbourg, LU); Rudolf Hebel (Ginsheim-Gustavsburg, DE)
Assignees: Paul Wurth Refractory & Engineering GmbH; Paul Wurth S.A.
F27B1/16F27D3/16C21B9/10C21B7/163F27B1/10F27D1/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,808,616
App. No.
13/143,216
Granted
Aug 19, 2014
Kind
B2
Abstract

There is provided a bustle pipe arrangement of a shaft furnace that comprises a circumferential bustle pipe arranged along the outer casing of the shaft furnace, the bustle pipe being arranged at a certain distance from the outer casing. The arrangement further comprises a plurality of first arms connecting the bustle pipe to the outer casing of the shaft furnace on a first level; and a plurality of second arms connecting the bustle pipe to the outer casing of the shaft furnace on a second level, the first level being different from the second level. First and second blow channels are respectively arranged through the first and second arms for fluidly connecting the bustle pipe to the interior of the shaft furnace.

Claims (18)

1. Bustle pipe arrangement of a shaft furnace comprising:

a circumferential bustle pipe arranged along an outer casing of said shaft furnace, said bustle pipe being arranged at a certain distance from said outer casing;

a plurality of first arms connecting said bustle pipe to said outer casing of said shaft furnace on a first level; first blow channels being arranged through said first arms for fluidly connecting said bustle pipe to an interior of said shaft furnace; and

a plurality of second arms connecting said bustle pipe to said outer casing of said shaft furnace on a second level; second blow channels being arranged through said second arms for fluidly connecting said bustle pipe to the interior of said shaft furnace, said first level being different from said second level,

wherein said bustle pipe comprises access ports located in wall portions of the bustle pipe and opposite to said first and/or second blow channels, in linear alignment with respective first and/or second blow channels, and

wherein said first arms are essentially horizontal and wherein said second arms are inclined at an angle of between 10 and 60° with respect to the horizontal.

2. Bustle pipe arrangement according to claim 1 , wherein said first and second arms are configured to support said circumferential bustle pipe.

3. Bustle pipe arrangement according to claim 1 , wherein said bustle pipe comprises a refractory lining on an inner wall and wherein said first and/or second blow channels extend through said refractory lining of said bustle pipe.

4. Bustle pipe arrangement according to claim 1 , wherein a plunger is associated with an access port for at least partially plugging at least one of said first blow channels and second blow channels.

5. Bustle pipe arrangement according to claim 4 , wherein said plunger has a conical nose for allowing regulation of gas flow through at least one of said first blow channels and second blow channels.

6. Bustle pipe arrangement according to claim 1 , wherein an injection nozzle and/or an injection nozzle insert is removably arranged in at least one of the first blow channels and the second blow channels.

7. Bustle pipe arrangement according to claim 1 , wherein said second arms are arranged so as to be, on a vertical projection, arranged half-way between two neighboring first arms.

8. Bustle pipe arrangement according to claim 1 , wherein said first and/or second arms are formed by a straight piece of piping lined internally with refractory material and having said first and second blow channels passing therethrough.

9. Bustle pipe arrangement according to claim 1 , wherein said second arms are arranged at an angle chosen such that access ports associated with said second blow channels are essentially on the same level as access ports associated with said first blow channels.

10. Bustle pipe arrangement according to claim 1 , wherein said first and second support arms are both inclined at an angle of between 0 and 40° with respect to the horizontal.

11. Bustle pipe arrangement according to claim 1 , further comprising at least one plurality of auxiliary arms connecting said bustle pipe to said outer casing of said shaft furnace, wherein auxiliary blow channels are arranged through said auxiliary arms for fluidly connecting said bustle pipe to the interior of said shaft furnace.

12. Bustle pipe arrangement according to claim 1 , wherein said bustle pipe has an essentially round or oval cross-section.

13. Bustle pipe arrangement according to claim 4 , wherein said plunger comprises an oxid-ceramic material or a silicon infiltrated silicon carbide material.

Assignments (7)
CHANGE OF ADDRESS Recorded Oct 3, 2019
From: PAUL WURTH DEUTSCHLAND GMBH
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 050614/0234 →
CORRECTIVE ASSIGNMENT TO CORRECT THE TYPOGRAPHICAL ERROR IN THE FIRST LISTED APPLICATION NUMBER PREVIOUSLY RECORDED AT REEL: 050592 FRAME: 0605. ASSIGNOR(S) HEREBY CONFIRMS THE APPLICATION. Recorded Oct 3, 2019
From: PAUL WURTH REFRACTORY & ENGINEERING
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 050613/0940 →
MERGER AND CHANGE OF NAME Recorded Oct 1, 2019
From: PAUL WURTH REFRACTORY & ENGINEERING GMBH; PAUL WURTH UMWELTTECHNIK GMBH
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 050592/0605 →
CHANGE OF NAME Recorded Jun 18, 2019
From: PAUL WURTH UMWELTTECHNIK GMBH
To: PAUL WURTH DEUTSCHLAND GMBH
Reel/Frame 049510/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE'S ADDRESS PREVIOUSLY RECORDED ON REEL 026541 FRAME 0385. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Aug 16, 2011
From: SIMOES, JEAN-PAUL; HAUSEMER, LIONEL; MOLLER, MANFRED DR.; TOCKERT, PAUL; HEBEL, RUDOLF
To: PAUL WURTH REFRACTORY & ENGINEERING GMBH
Reel/Frame 026761/0386 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 5, 2011
From: SIMOES, JEAN-PAUL; HAUSEMER, LIONEL; MOLLER, MANFRED, DR.; TOCKERT, PAUL; HEBEL, RUDOLF
To: PAUL WURTH REFRACTORY & ENGINEERING GMBH
Reel/Frame 026541/0385 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 5, 2011
From: SIMOES, JEAN-PAUL; HAUSEMER, LIONEL; MOLLER, MANFRED, DR.; TOCKERT, PAUL; HEBEL, RUDOLF
To: PAUL WURTH S.A.
Reel/Frame 026541/0436 →
Priority Claims (1)
EP 09150054 · Jan 5, 2009 · regional
Continuity (1)