IP Library Granted Patent US 8,918,982
Granted Patent B2
US 8,918,982 · App. 12/528,168 · Granted Dec 30, 2014

Method for the production of a high-pressure accumulator pipe of steel for fuel injection systems and high-pressure accumulator pipe produced according to this method

Inventors: Michael Hagedorn (Dortmund, DE); Uwe Lechtenfeld (Dortmund, DE)
Assignee: Salzgitter Mannesmann Precision GmbH
B21D39/06F02M55/025B21C37/154F02M2200/9053F02M2200/80B21K25/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,918,982
App. No.
12/528,168
Granted
Dec 30, 2014
Kind
B2
Abstract

In a method of making a high-pressure accumulator pipe as composite pipe of steel for pressures of up to 1800 bar and above with high static strength and fatigue strength for fuel injection systems with common rail systems for internal combustion engines, a first inner pipe part is inserted into a second outer pipe part with little clearance, and the inner pipe part is connected to the outer pipe part gap-free and by interference fit through mechanical forming. The mechanical forming includes a rolling-in process, wherein the inner pipe part is subjected to a ductile expansion and the outer pipe part is subjected to an elastic expansion using an oversized rolling tool that is moved within the inner pipe part, and wherein a residual compressive stress adjusted to the operating pressure is applied to the inner pipe part after the forming process via the elastic resilience of the outer pipe part.

Claims (9)

1. A method of making a high-pressure accumulator pipe as composite pipe of steel for pressures of up to 1800 bar and above and exhibiting high static strength and fatigue strength for fuel injection systems with common rail systems for internal combustion engines, comprising the steps of:

inserting an inner pipe part into an outer pipe part with little clearance; and

connecting the inner pipe part to the outer pipe part gap-free and by interference fit through mechanical forming by moving an oversized rolling tool within the inner piper part to thereby subject the inner pipe part to a ductile expansion and the outer pipe part to an elastic expansion

wherein the inner pipe part is acted upon after the forming process by a residual compressive stress as the outer pipe part springs back.

2. The method of claim 1 , wherein the inner and outer pipe parts are made of differently alloyed materials, with the outer pipe part being made of a high-strength material and the inner pipe part being made of a high-strength material with great forming capability.

3. The method of claim 1 , wherein the outer pipe part is made of an unalloyed or low-alloy material, and the inner pipe part is made of a high-alloy material.

4. The method of claim 1 , wherein the inner and outer pipe parts are made of a same material.

5. The method of claim 1 , wherein the inner pipe part has a wall thickness which is smaller than a wall thickness of the outer pipe part.

6. The method of claim 1 , wherein the inner pipe part has an inner surface which is defined by a roughness R z in a range of ≦1.0 μm and a roughness R a in a range of ≦0.2 μm.

Assignments (2)
MERGER Recorded Jul 10, 2014
From: SALZGITTER MANNESMANN PRÄZISROHR GMBH
To: SALZGITTER MANNESMANN PRECISION GMBH
Reel/Frame 033288/0130 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 5, 2010
From: HAGEDORN, MICHAEL; LECHTENFELD, UWE
To: SALZGITTER MANNESMANN PRAEZISROHR GMBH
Reel/Frame 025324/0382 →
Priority Claims (1)
DE 10 2007 011 868 · Mar 7, 2007 · national
Continuity (1)
Related Publication 20110041946A1 · Feb 24, 2011