IP Library Granted Patent US 9,187,295
Granted Patent B2
US 9,187,295 · App. 11/897,920 · Granted Nov 17, 2015

Safety and control method for cranes

Inventors: Klaus Schneider (Hergatz, DE); Martin Rajek (Bludesch, AT)
Assignee: Liebherr-Werk Nenzing GmbH
B66C15/045B66C15/065
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,187,295
App. No.
11/897,920
Granted
Nov 17, 2015
Kind
B2
Abstract

The disclosure includes a safety method for the lifting and/or transporting of a common load using a plurality of cranes, comprising the steps: determining of possible damage incidents for movement vectors of the cranes; activation of an alarm function if predetermined movement vectors result in damage incidents and/or limitation of the movement vectors used for the control of the cranes to those movement vectors which do not result in damage incidents in any of the cranes. Furthermore, a corresponding control method as well as a safety system and a control system are provided.

Claims (26)

1. A safety method for the lifting and/or transporting of a common load using a plurality of cranes, comprising the steps:

determining possible damage incidents for movement vectors of the cranes, wherein the movement vectors include at least speeds or accelerations of each of the plurality of cranes lifting and/or transporting the common load and represent a set of data which contains information on control of all cranes, and wherein permitted movement vectors are determined by a predictive calculation; and

activating an alarm function if predetermined movement vectors result in damage incidents and/or limiting the movement vectors used for control of the cranes to those movement vectors which do not result in damage incidents in any of the cranes.

2. The safety method in accordance with claim 1 , wherein the damage incidents include at least one overload of the cranes.

3. The safety method in accordance with claim 2 , wherein a possible overload is determined via load torque limitations associated with respective cranes of the plurality of cranes.

4. The safety method in accordance with claim 1 , wherein the determination of permitted movement vectors is based on an iterative method.

5. The safety method in accordance with claim 1 , wherein the possible damage incidents include a collision of the cranes between one another.

6. The safety method in accordance with claim 5 , wherein a calculation of the possible collisions is based on a geometrical model of the cranes, of the load and/or of the disturbance objects.

7. The safety method in accordance with claim 1 , wherein the possible damage incidents include a collision of the cranes with the load.

8. The safety method in accordance with claim 7 , wherein the determination of the collision is based on at least one geometrical model of the cranes and of the load.

9. The safety method in accordance with claim 8 , wherein geometrical data of the load are input and/or determined.

10. The safety method in accordance with claim 9 , wherein geometrical data of possible disturbance objects are input and possible collisions of the cranes and/or of the load with the disturbance objects are calculated.

11. The safety method in accordance with claim 1 , wherein the possible damage incidents include exceeding limits of the torque sum of the cranes.

12. The safety method in accordance with claim 1 , wherein the possible damage incidents include exceeding limits for external limitations including at least one of a maximum permitted heeling of a ship, a maximum permitted ground pressure and a maximum permitted torque of a platform.

13. The safety method in accordance with claim 1 , wherein possible damage incidents are recognized in a predictive calculation, with their possible prevention being taken into account.

14. The safety method in accordance with claim 13 , wherein the predictive calculations are carried out on the basis of dynamic properties of the cranes, including the maximum possible speeds and/or accelerations of crane drives.

15. The safety method in accordance with claim 1 , wherein deformation of the cranes is taken into account.

16. The safety method in accordance with claim 1 , wherein the alarm function includes an automatic deactivation of the cranes.

17. The safety method in accordance with claim 1 , wherein safety distances from the possible damage incidents can be selected.

18. The safety method in accordance with claim 1 , wherein data are forwarded to external systems including a ballasting control of a ship, to control them and/or to exchange data with the external systems.

19. The safety method in accordance with claim 1 , wherein the cranes can be moved and have means for the determination of their positions, including GPS devices.

20. A control method for the lifting and/or transporting of a common load using a plurality of cranes, comprising the steps:

presetting a desired movement of the load or of the cranes; and

determining possible damage incidents for movement vectors of the cranes, where determining possible damage incidents includes using a predictive calculation to check each movement vector to determine whether a current movement of that movement vector will directly result in a damage incident in any of the cranes and whether the current movement of that movement vector could provoke a future damage incident in any of the cranes,

wherein the movement vectors used for the control of the cranes are limited to those movement vectors which do not directly result in damage incidents in any of the cranes and which could not provoke a future damage incident in any of the cranes, and where the movement vectors include at least speeds or accelerations of each of the plurality of cranes and represent a set of data which contains information on control of all cranes.

21. The control method in accordance with claim 20 , wherein the movement vectors include permitted movement vectors for each of the cranes, the permitted movement vectors being those movement vectors in which a movement procedure is available which does not result in at least one damage incident.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 26, 2007
From: SCHNEIDER, KLAUS; RAJEK, MARTIN
To: LIEBHERR-WERK NENZING GMBH
Reel/Frame 020022/0483 →
Priority Claims (1)
DE 10 2006 040 782 · Aug 31, 2006 · national
Continuity (1)
Related Publication 20080053945A1 · Mar 6, 2008