IP Library Granted Patent US 9,255,720
Granted Patent B2
US 9,255,720 · App. 12/828,889 · Granted Feb 9, 2016

Demand control ventilation system with commissioning and checkout sequence control

Inventors: Adrienne Thomle (Plymouth, MN); Todd Kreft (Richfield, MN); Mark Bokusky (Brooklyn Park, MN)
Assignee: Honeywell International Inc.
F24F11/006F24F12/006G05B19/042F24F2011/0006F24F2011/0091F24F2012/007G05B2219/23193G05B2219/2614Y02B30/563
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,255,720
App. No.
12/828,889
Granted
Feb 9, 2016
Kind
B2
Abstract

The disclosure relates to a Demand Control Ventilation (DCV) and/or Economizer system that is capable of drawing outside air into an HVAC air stream. In some instances, the DCV and/or Economizer system may be configured to help perform one or more system checks to help verify that the system is functioning properly. In some instances, the DCV and/or Economizer system may provide some level of manual control over certain hardware (e.g. dampers) to help commission the system. The DCV and/or Economizer system may store one or more settings and or parameters used during the commissioning process (either in the factory or in the field), so that these settings and/or parameters may be later accessed to verify that the DCV and/or Economizer system was commissioned and commissioned properly.

Claims (19)

1. A Demand Control Ventilation (DCV) and/or Economizer system that is configured to be attached to a roof top HVAC unit of a building, comprising:

a DCV and/or economizer unit having a damper and a controller integrated with and located at the DCV and/or economizer unit, wherein the controller includes a memory, and wherein the damper is configured to selectively control air flow from outside of the building and into the building;

the controller is configured to control a position of the damper such that a desired air flow of outside air is drawn into the building;

the memory of the controller storing one or more calibration parameters generated during a commissioning of the DCV and/or economizer unit, wherein the one or more calibration parameters includes a minimum damper position based on a desired non-zero ventilation rate of the building;

an interface for retrieving one or more of the stored calibration parameters from the memory of the controller of the DCV and/or economizer unit for display to a user, and for receiving a command from a user to initiate and perform one or more user initiated tests of the DCV and/or economizer unit; and

wherein the controller is configured to initiate and perform one or more tests of the DCV and/or economizer unit upon receiving the command from the user via the interface, the one or more tests comprising proving that the damper can successfully be moved from a first position to a second position and providing confirmation to the user.

2. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein one of the stored calibration parameters includes a date of commissioning parameter.

3. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein one of the stored calibration parameters includes a person or company parameter.

4. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein one of the stored calibration parameters includes a minimum damper position parameter.

5. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein one of the stored calibration parameters includes a maximum damper position parameter.

6. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein one of the stored calibration parameters includes an airflow parameter.

7. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the memory is a non-volatile memory.

8. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the interface includes a local user interface.

9. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the interface includes a remote user interface.

10. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the interface includes a wired interface.

11. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the interface includes a wireless interface.

12. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the controller includes a test mode, wherein in the test mode, a user can independently control a position of the damper.

13. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the memory of the controller in a non-volatile memory, and the stored calibration parameters are stored in non-volatile memory, and wherein the controller is programmed to downloaded the stored calibration parameters to a remote device via the interface upon request.

14. The Demand Control Ventilation (DCV) and/or Economizer system of claim 1 , wherein the controller is programmed to automatically initiate and perform one or more self-tests of the DCV and/or economizer unit.

Assignments (1)
ASSIGMENT OF ASSIGNOR'S INTEREST Recorded Jul 1, 2010
From: THOMLE, ADRIENNE; KREFT, TODD; BOKUSKY, MARK
To: HONEYWELL INTERNATIONAL INC.
Reel/Frame 024627/0802 →
Continuity (3)
Continuation In Part 12764431 · Apr 21, 2010
Continuation In Part 12764415 · Apr 21, 2010
Related Publication 20110264275A1 · Oct 27, 2011