System and method for retrofitting walls with retaining ties
View Patent ↗A retention tie system for post-construction installation to stabilize masonry or composite walls. The system comprises a tie member anchored in an anchor hole bored into the existing foundation and a tensioned against a base plate and a cover plate seated along the top of the wall. A bracing member is used to provide lateral stability to the respective plate members. A tension washer is used to ensure that the tie members are tensioned to the appropriate load.
1. A method of reinforcing an existing wall of a structure, the structure having a concrete foundation supporting the wall, and the wall comprising concrete masonry units, a top, and a vertical passageway, the method comprising the steps of:
locating an access block in the wall, the access block corresponding to a reinforcing location determined by structural analysis;
installing a knock-out in the access block;
installing, via the knock-out, an anchor hole in the foundation;
covering the anchor hole with a protective member;
installing a base plate on the top of the wall, the base plate having a first set of access holes;
installing a cover plate over the base plate, the cover plate having a second set of access holes;
placing the first set of access holes, the second set of access holes, the vertical passageway, and the anchor hole in substantial vertical alignment;
placing a bearing plate member over the cover plate, the bearing plate member having a receiving hole, and the receiving hole placed in substantial vertical alignment with the anchor hole and at least one of the second access holes; and
providing a tie member having an anchor end and a tension end;
lowering the tie member through the receiving hole, second access hole, first access hole, vertical passageway such that the anchor end is placed in proximity to the anchor hole;
removing the protective member from the anchor hole by accessing the protective member via the knock-out;
inserting the anchor end into the anchor hole;
inserting retaining material inside the anchor hole;
curing the retaining material such that the retaining material forms a secure bond between the anchor end and the foundation;
tensioning the tie member by adjusting a mechanical tensioner attached to the tension end of the tie member; and
introducing a bracing member inside the vertical passageway such that the bracing member retains the tie member in close proximity to the centerline of the vertical passageway.
2. The method of claim 1 , further comprising the steps of covering the knock-out with a screen member and applying fill material over the screen member.
3. The method of claim 2 , further comprising the steps of:
installing a tension washer between the mechanical tensioner and the bearing plate member, the tension washer configured to provide a visual indication of the magnitude of tension force in the tie member; and
determining, via the tension washer, the event of the tie member being loaded with the pre-determined magnitude of tension load.
4. The method of claim 1 , further comprising the steps of:
installing a tension washer between the mechanical tensioner and the bearing plate member, the tension washer configured to provide a visual indication of the magnitude of tension force in the tie member; and
determining, via the tension washer, the event of the tie member being loaded with the pre-determined magnitude of tension load.
5. A method of reinforcing an existing wall of a structure, the structure having a concrete foundation supporting the wall, and the wall comprising concrete masonry units, a top, and a vertical passageway, the method comprising the steps of:
locating an access block in the wall, the access block corresponding to a reinforcing location determined by structural analysis;
installing a knock-out in the access block;
installing, via the knock-out, an anchor hole in the foundation;
covering the anchor hole with a protective member;
placing a bearing plate member on the top of the wall, the bearing plate member having a receiving hole, and the receiving hole placed in substantial vertical alignment with the anchor hole; and
providing a tie member having an anchor end and a tension end;
lowering the tie member through the receiving hole and vertical passageway such that the anchor end is placed in proximity to the anchor hole;
removing the protective member from the anchor hole by accessing the protective member via the knock-out;
inserting the anchor end into the anchor hole;
inserting retaining material inside the anchor hole;
curing the retaining material such that the retaining material forms a secure bond between the anchor end and the foundation;
tensioning the tie member by adjusting a mechanical tensioner attached to the tension end of the tie member.
6. The method of claim 5 , further comprising the steps of covering the knock-out with a screen member and applying fill material over the screen member.
7. The method of claim 5 , further comprising the steps of:
installing a tension washer between the mechanical tensioner and the bearing plate member, the tension washer configured to provide a visual indication of the magnitude of tension force in the tie member; and
determining, via the tension washer, the event of the tie member being loaded with the pre-determined magnitude of tension load.
8. The method of claim 6 , further comprising the steps of:
installing a tension washer between the mechanical tensioner and the bearing plate member, the tension washer configured to provide a visual indication of the magnitude of tension force in the tie member; and
determining, via the tension washer, the event of the tie member being loaded with the pre-determined magnitude of tension load.
9. The method of claim 5 , further comprising the step of introducing a bracing member inside the vertical passageway such that the bracing member retains the tie member in close proximity to the centerline of the vertical passageway.
10. The method of claim 9 , further comprising the steps of covering the knock-out with a screen member and applying fill material over the screen member.
11. The method of claim 9 , further comprising the steps of:
installing a tension washer between the mechanical tensioner and the bearing plate member, the tension washer configured to provide a visual indication of the magnitude of tension force in the tie member; and
determining, via the tension washer, the event of the tie member being loaded with the pre-determined magnitude of tension load.
12. The method of claim 10 , further comprising the steps of:
installing a tension washer between the mechanical tensioner and the bearing plate member, the tension washer configured to provide a visual indication of the magnitude of tension force in the tie member; and
determining, via the tension washer, the event of the tie member being loaded with the pre-determined magnitude of tension load.