IP Library Granted Patent US 9,357,510
Granted Patent B2
US 9,357,510 · App. 14/671,364 · Granted May 31, 2016

Power sharing and power headroom reporting in dual connectivity scenarios

Inventors: Jelena Damnjanovic (Del Mar, CA); Wanshi Chen (San Diego, CA); Aleksandar Damnjanovic (Del Mar, CA); Peter Gaal (San Diego, CA)
Assignee: QUALCOMM Incorporated
H04W52/365H04W52/146H04W52/32H04W52/34H04W52/367H04W52/38H04W72/0413H04W72/0446H04W76/046H04W88/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,357,510
App. No.
14/671,364
Granted
May 31, 2016
Kind
B2
Abstract

Certain aspects of the present disclosure provide procedures for power sharing, scaling, and power headroom reporting in dual connectivity operations. According to certain aspects, a method of wireless communication by a user equipment (UE) is provided. The method generally includes determining a maximum available transmit power of the UE, semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station, and dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power.

Claims (56)

1. A method for wireless communication by a user equipment (UE), comprising:

determining a maximum available transmit power of the UE;

semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station; and

dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power, wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:

determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and

including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station.

2. The method of claim 1 , wherein the semi-static configuring is via radio resource control (RRC) signaling.

3. The method of claim 1 , wherein the unused amount comprises an amount of the first minimum guaranteed power that is unused for transmission to the first base station on all uplink channels to be transmitted to the first base station.

4. The method of claim 1 , wherein the first base station and the second base station operate asynchronously, and wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:

determining a first amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a first transmission time interval (TTI);

determining a second amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a second TTI overlapping the first TTI; and

including at least a portion of the smaller of the first unused amount or the second unused amount when determining the second maximum transmit power.

5. The method of claim 1 , wherein the first base station comprises a Master Evolved Node B (MeNB) or a Secondary eNB (SeNB) and the second base station comprises the other one of a MeNB or a SeNB.

6. The method of claim 1 , wherein the semi-static configuring is based on a prioritization.

7. The method of claim 6 , wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH), a physical uplink shared channel (PUSCH) with uplink control information (UCI), and a PUSCH without UCI.

8. The method of claim 6 , wherein the prioritization comprises allocating transmit power with a higher priority to channels for a Master Evolved Node B (MeNB) and with a lower priority to corresponding channels for a Secondary eNB (SeNB).

9. The method of claim 6 , wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH) for a Master Evolved Node B (MeNB), a PUCCH for a Secondary eNB (SeNB), a physical uplink shared channel (PUSCH) with uplink control information (UCI) for a MeNB, a PUSCH with UCI for a SeNB, and a PUSCH without UCI.

10. The method of claim 6 , wherein the prioritization comprises allocating transmit power with a higher priority to a physical uplink shared channel (PUSCH) that carries traffic with a higher grade of service and with a lower priority to a PUSCH that carries traffic with a lower grade of service.

11. The method of claim 6 , wherein the prioritization comprises uniformly distributing power for physical uplink shared channel (PUSCH) transmissions to the first base station and the second base station.

12. The method of claim 1 , further comprising:

sending a power headroom report (PHR) to at least one of the first base station or the second base station indicating at least one of the first maximum transmit power or the second maximum transmit power.

13. An apparatus for wireless communications, comprising:

at least one processor configured to:

determine a maximum available transmit power of the apparatus,

semi-statically configure a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station, and

dynamically determine a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the apparatus, the first minimum guaranteed power, and the second minimum guaranteed power, wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:

determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and

including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station; and

a memory coupled with the at least one processor.

14. The apparatus of claim 13 , wherein the semi-static configuring is via radio resource control (RRC) signaling.

15. The apparatus of claim 13 , wherein the unused amount comprises an amount of the first minimum guaranteed power that is unused for transmission to the first base station on all uplink channels to be transmitted to the first base station.

16. The apparatus of claim 13 , wherein the first base station and the second base station operate asynchronously, and wherein dynamically determining the first maximum transmit power and the second maximum transmit power comprises:

determining a first amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a first transmission time interval (TTI);

determining a second amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station during a second TTI overlapping the first TTI; and

including at least a portion of the smaller of the first unused amount or the second unused amount when determining the second maximum transmit power.

17. The apparatus of claim 13 , wherein the first base station comprises a Master Evolved Node B (MeNB) or a Secondary eNB (SeNB) and the second base station comprises the other one of a MeNB or a SeNB.

18. The apparatus of claim 13 , wherein the semi-static configuring is based on a prioritization.

19. The apparatus of claim 18 , wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH), a physical uplink shared channel (PUSCH) with uplink control information (UCI), and a PUSCH without UCI.

20. The apparatus of claim 18 , wherein the prioritization comprises allocating transmit power with a higher priority to channels for a Master Evolved Node B (MeNB) and with a lower priority to corresponding channels for a Secondary eNB (SeNB).

21. The apparatus of claim 18 , wherein the prioritization comprises allocating transmit power, in order of higher priority to lower priority, to: a physical uplink control channel (PUCCH) for a Master Evolved Node B (MeNB), a PUCCH for a Secondary eNB (SeNB), a physical uplink shared channel (PUSCH) with uplink control information (UCI) for a MeNB, a PUSCH with UCI for a SeNB, and a PUSCH without UCI.

22. The apparatus of claim 18 , wherein the prioritization comprises allocating transmit power with a higher priority to a physical uplink shared channel (PUSCH) that carries traffic with a higher grade of service and with a lower priority to a PUSCH that carries traffic with a lower grade of service.

23. The apparatus of claim 18 , wherein the prioritization comprises uniformly distributing power for physical uplink shared channel (PUSCH) transmissions to the first base station and the second base station.

24. The apparatus of claim 13 , further comprising:

sending a power headroom report (PHR) to at least one of the first base station or the second base station indicating at least one of the first maximum transmit power or the second maximum transmit power.

25. An apparatus for wireless communication by a user equipment (UE), comprising:

means for determining a maximum available transmit power of the UE;

means for semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station; and

means for dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power, wherein means for dynamically determining the first maximum transmit power and the second maximum transmit power comprises:

means for determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and

means for including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station.

26. A non-transitory computer readable medium having computer executable code stored there, the computer executable code comprising:

code for determining a maximum available transmit power of the UE;

code for semi-statically configuring a first minimum guaranteed power available for uplink transmission to a first base station and a second minimum guaranteed power available for uplink transmission to a second base station; and

code for dynamically determining a first maximum transmit power available for uplink transmission to the first base station and a second maximum transmit power available for uplink transmission to the second base station based, at least in part, on the maximum available transmit power of the UE, the first minimum guaranteed power, and the second minimum guaranteed power, wherein code for dynamically determining the first maximum transmit power and the second maximum transmit power comprises:

code for determining an amount of the first minimum guaranteed power that is unused for uplink transmission to the first base station, and

code for including at least a portion of the unused amount when determining the second maximum transmit power available for uplink transmission to the second base station.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 17, 2015
From: DAMNJANOVIC, JELENA; CHEN, WANSHI; DAMNJANOVIC, ALEKSANDAR; GAAL, PETER
To: QUALCOMM INCORPORATED
Reel/Frame 035439/0106 →
Continuity (2)
Provisional Application 61973126 · Mar 31, 2014
Related Publication 20150282104A1 · Oct 1, 2015