IP Library › Granted Patent US 9,392,587
Granted Patent B2
US 9,392,587 · App. 14/446,576 · Granted Jul 12, 2016

Method for transmitting control information and device for same

Inventors: Suckchel Yang (Anyang, KR); Joonkui Ahn (Anyang, KR); Dongyoun Seo (Anyang, KR); Mingyu Kim (Anyang, KR)
Assignee: LG ELECTRONICS INC.
H04W72/0406H04L1/1822H04L1/1861H04W52/325H04L1/1812H04L5/0053H04W52/242H04W52/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,392,587
App. No.
14/446,576
Granted
Jul 12, 2016
Kind
B2
Abstract

The present invention relates to a wireless communication system. In more detail, the present invention relates to a method for transmitting uplink control information in a wireless communication system operating as TDD, and a device for same. The method includes transmitting Hybrid Automatic Repeat request-Acknowledgement (HARQ) in a subframe n through Physical Uplink Control Channel (PUCCH), and a transmission power of the PUCCH relates to a method determined using Equation 4 or 5, and a device for same.

Claims (492)

1. A method for transmitting uplink control information by a user equipment in a TDD (Time Division Duplex) wireless communication system, the method comprising:

determining, by the user equipment, a PUCCH (Physical Uplink Control Channel) transmission power parameter according to an UL-DL (Uplink-Downlink) configuration and a modulo equation; and

transmitting, by the user equipment to a base station, a HARQ-ACK (Hybrid Automatic Repeat reQuest-Acknowledgement) signal via a PUCCH in an uplink (UL) subframe in accordance with the determined PUCCH transmission power parameter,

wherein the modulo equation includes the following parameters;

a number of cells configured for the user equipment;

a downlink assignment index number indicated by a downlink scheduling-related PDCCH (Physical Downlink Control Channel) lastly detected within subframe(s) associated with the UL subframe;

a total number of downlink scheduling-related PDCCHs detected;

a number of HARQ-ACK bits corresponding to a configured downlink transmission mode on a serving cell c, and

one of:

a number of PDCCH or PDSCH (Physical Downlink Shared Channel) without a corresponding PDCCH received when bundling is applied, or

a number of transport blocks or a SPS (Semi-Persistent Scheduling) release PDCCH received by the user equipment when bundling is not applied,

wherein the modulo equation further includes applying a modulo-4 operation to a difference between the downlink assignment index number and the total number of downlink scheduling-related PDCCHs detected.

2. The method of claim 1 ,

wherein the UL subframe corresponds to a subframe n,

wherein the PUCCH transmission power parameter is n HARQ ,

wherein the modulo equation is:

n

HARQ

=

∑

c

=

0

C

-

1

⁢

(

(

(

V

DAI

,

c

DL

-

U

DAI

,

c

)

⁢

mod

⁢

⁢

4

)

·

n

c

ACK

+

∑

k

∈

K

⁢

N

k

,

c

received

)

,

wherein C denotes the number of cells configured for the user equipment,

K denotes a set having M elements k (k∈K) according to the UL-DL configuration, M is a positive integer,

V DAI,c DL is the downlink assignment index number having a value indicated by a 2-bit DAI (Downlihk Assignment Index) field included in the downlink scheduling-related PDCCH lastly detected within the subframe(s) n−k in the serving cell c,

U DAI,c denotes the total number of downlink scheduling-related PDCCHs detected within the subframe(s) n−k in the serving cell c,

n c ACK denotes the number of HARQ-ACK bits corresponding to the configured downlink transmission mode on the serving cell c, and is set to 1 when spatial bundling is applied,

when spatial bundling is applied, N k,c received represents the number of PDCCH or PDSCH without a corresponding PDCCH received in the subframe(s) n−k and the serving cell c,

when spatial bundling is not applied, N k,c received represents the number of transport blocks received or SPS release PDCCH received in the subframe(s) n−k and the serving cell c, and

mod represents a modulo operation.

3. The method according to claim 2 , wherein a PUCCH transmission power is determined according to the following equation:

h

⁡

(

·

)

=

n

HARQ

+

n

SR

-

1

N

,

wherein N is a positive integer, and

n SR is a power adjustment parameter used to adjust the PUCCH transmission power in relation to SR (Scheduling Request), and is set to 0 or 1.

4. The method according to claim 3 , wherein the PUCCH transmission power is determined according to the following equation:

P

PUCCH

⁡

(

n

)

=

min

⁢

{

P

CMAX

,

c

⁡

(

n

)

,

P

0

⁢

_PUCCH

+

PL

c

+

h

⁡

(

·

)

+

Δ

F_PUCCH

⁡

(

F

)

+

Δ

TxD

⁡

(

F

′

)

+

g

⁡

(

i

)

}

,

wherein P PUCCH (n) represents the PUCCH transmission power,

P CMAX,c (n) represents a configured transmission power in the subframe n for the serving cell c,

P 0 _ PUCCH is determined based on at least one parameter provided by a higher layer,

PL c is a downlink path loss estimate of the serving cell c,

Δ P _ PUCCH (F) represents a value corresponding to a PUCCH format,

Δ TxD (F′) is a value provided by the higher layer or 0, and

g(i) represents a current PUCCH power control adjustment state.

5. The method according to claim 1 , wherein the UL-DL configuration is one of UL-DL configurations #1 to #6 as shown in the following table

Uplink-downlink

Subframe number

configuration

0

1

2

3

4

5

6

7

8

9

0

D

S

U

U

U

D

S

U

U

U

1

D

S

U

U

D

D

S

U

U

D

2

D

S

U

D

D

D

S

U

D

D

3

D

S

U

U

U

D

D

D

D

D

4

D

S

U

U

D

D

D

D

D

D

5

D

S

U

D

D

D

D

D

D

D

6

D

S

U

U

U

D

S

U

U

D

wherein D denotes a subframe for downlink, S denotes a subframe comprising a downlink period, a guard period, and an uplink period, and U denotes a subframe for uplink.

6. The method according to claim 5 , wherein the UL-DL configuration is UL-DL configuration #5.

7. A user equipment configured to transmit uplink control information in a TDD (Time Division Duplex) wireless communication system, the user equipment comprising:

a processor configured to determine a PUCCH (Physical Uplink Control Channel) transmission power parameter according to an UL-DL (Uplink-Downlink) configuration and a modulo equation,

wherein the modulo equation includes the following parameters:

a number of cells configured for the user equipment;

a downlink assignment index number indicated by a downlink scheduling-related PDCCH (Physical Downlink Control Channel) lastly detected within subframe(s) associated with an UL (Uplink) subframe;

a total number of downlink scheduling-related PDCCHs detected;

a number of HARQ-ACK (Hybrid Automatic Repeat reQuest-Acknowledgement) bits corresponding to a configured downlink transmission mode on a serving cell c, and

one of:

a number of PDCCH or PDSCH (Physical Downlink Shared Channel) without a corresponding PDCCH received when bundling is applied, or

a number of transport blocks or a SPS (Semi-Persistent Scheduling) release PDCCH received by the user equipment when bundling is not applied,

wherein the modulo equation further includes applying a modulo-4 operation to a difference between the downlink assignment index number and the total number of downlink scheduling-related PDCCHs detected; and

a radio frequency (RF) unit operatively connected to the processor and configured to transmit a HARQ-ACK signal to a base station via a PUCCH in the UL subframe in accordance with the determined PUCCH transmission power parameter.

8. The user equipment of claim 7 ,

wherein the UL subframe corresponds to a subframe n,

wherein the PUCCH transmission power parameter is n HARQ ,

wherein the modulo equation is:

n

HARQ

=

∑

c

=

0

C

-

1

⁢

(

(

(

V

DAI

,

c

DL

-

U

DAI

,

c

)

⁢

mod

⁢

⁢

4

)

·

n

c

ACK

+

∑

k

∈

K

⁢

N

k

,

c

received

)

,

wherein C denotes the number of cells configured for the user equipment,

K denotes a set having M elements k (k∈K) according to the UL-DL configuration, M is a positive integer,

V DAI,c DL is the downlink assignment index number having a value indicated by a 2-bit DAI (Downlink Assignment Index) field included in the downlink scheduling-related PDCCH lastly detected within the subframe(s) n−k in the serving cell c,

U DAI,c denotes the total number of downlink scheduling-related PDCCHs detected within the subframe(s) n−k in the serving cell c,

n c ACK denotes the number of HARQ-ACK bits corresponding to the configured downlink transmission mode on the serving cell c, and is set to 1 when spatial bundling is applied,

when spatial bundling is applied, N k,c received represents the number of PDCCH or PDSCH without a corresponding PDCCH received in the subframe(s) n−k and the serving cell c,

when spatial bundling is not applied, N k,c received represents the number of transport blocks received or SPS release PDCCH received in the subframe(s) n−k and the serving cell c, and

mod represents a modulo operation.

9. The user equipment according to claim 8 , wherein the PUCCH transmission power is determined according to the following equation:

h

⁡

(

·

)

=

n

HARQ

+

n

SR

-

1

N

,

wherein N is a positive integer, and

n SR is a power adjustment parameter used to adjust the PUCCH transmission power in relation to SR (Scheduling Request), and is set to 0 or 1.

10. The user equipment according to claim 9 , wherein the PUCCH transmission power is determined according to the following equation:

P

PUCCH

⁡

(

n

)

=

min

⁢

{

P

CMAX

,

c

⁡

(

n

)

,

P

0

⁢

_PUCCH

+

PL

c

+

h

⁡

(

·

)

+

Δ

F_PUCCH

⁡

(

F

)

+

Δ

TxD

⁡

(

F

′

)

+

g

⁡

(

i

)

}

,

wherein P PUCCH (n) represents the PUCCH transmission power,

P CMAX,c (n) represents a configured transmission power in the subframe n for the serving cell c,

P 0 _ PUCCH is determined based on at least one parameter provided by a higher layer,

PL c is a downlink path loss estimate of the serving cell c,

Δ F _ PUCCH (F) represents a value corresponding to a PUCCH format,

Δ TxD (F′) is a value provided by the higher layer or 0, and

g(i) represents a current PUCCH power control adjustment state.

11. The user equipment according to claim 7 , wherein the UL-DL configuration is one of UL-DL configurations #1 to #6 as shown in the following table

Uplink-downlink

Subframe number

configuration

0

1

2

3

4

5

6

7

8

9

0

D

S

U

U

U

D

S

U

U

U

1

D

S

U

U

D

D

S

U

U

D

2

D

S

U

D

D

D

S

U

D

D

3

D

S

U

U

U

D

D

D

D

D

4

D

S

U

U

D

D

D

D

D

D

5

D

S

U

D

D

D

D

D

D

D

6

D

S

U

U

U

D

S

U

U

D

wherein D denotes a subframe for downlink, S denotes a subframe comprising a downlink period, a guard period, and an uplink period, and U denotes a subframe for uplink.

12. The user equipment according to claim 11 , wherein the UL-DL configuration is UL-DL configuration #5.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2014
From: YANG, SUCKCHEL; AHN, JOONKUI; SEO, DONGYOUN; KIM, MINGYU
To: LG ELECTRONICS INC.
Reel/Frame 033420/0672 →
Continuity (3)
Continuation 14000859
Provisional Application 61486822 · May 17, 2011
Related Publication 20140341151A1 · Nov 20, 2014