IP Library Granted Patent US 9,461,793
Granted Patent B2
US 9,461,793 · App. 14/349,026 · Granted Oct 4, 2016

Method for determining the transmission of a sounding reference signal in a wireless communication system, and terminal therefor

Inventors: Dongcheol Kim (Anyang-si, KR); Hangyu Cho (Anyang-si, KR); Seunghee Han (Anyang-si, KR); Minseok Noh (Anyang-si, KR)
Assignee: LG Electronics Inc.
H04L5/0048H04L5/001H04L25/0224H04W72/0446H04L5/0051H04L5/0053
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,461,793
App. No.
14/349,026
Granted
Oct 4, 2016
Kind
B2
Abstract

The invention relates to a method for determining the transmission of a sounding reference signal (SRS) by a terminal in a wireless communication system, which can include a step of determining whether a physical uplink control channel (PUCCH) or a physical uplink shared channel (PUSCH) in a first timing advance (TA) group, or an SRS in a second TA group in the same subframe, is to be transmitted when the transmission timing of the PUCCH or the PUSCH in a cell of the first TA group and the transmission timing of the SRS in a cell of the second TA group overlap each other in the same subframe.

Claims (17)

1. A method of controlling a sounding reference symbol (SRS) transmission by a user equipment (UE) in a wireless communication system supporting a plurality of component carriers, the method comprising:

when a sounding reference symbol (SRS) transmission on a first timing advance group is scheduled in a subframe, and a physical uplink control channel (PUCCH) transmission and a physical uplink shared channel (PUSCH) transmission on a second timing advance group are scheduled in the subframe,

transmitting the PUCCH and PUSCH in the subframe of the second timing advance group; and

dropping the SRS in the subframe of the first timing advance group when the SRS transmission in the subframe of the first timing advance group overlaps the PUCCH transmission and PUSCH transmission on the second timing advance group in a time domain and a total transmission power of the UE exceeds a maximum transmission power configured for the UE in the overlapped portion.

2. The method of claim 1 , wherein the UE is configured with a plurality of timing advance groups.

3. The method of claim 1 , wherein the SRS transmission in the subframe of the first timing advance group overlaps the PUCCH transmission and PUSCH transmission on the second timing advance group at a symbol level in the subframe.

4. The method of claim 1 , wherein the PUCCH transmission and PUSCH transmission are scheduled in the subframe of the same component carrier of the second timing advance group.

5. A user equipment (UE) capable of controlling a sounding reference symbol (SRS) transmission in a wireless communication system supporting a plurality of component carriers, the UE comprising:

a transmitter; and

a processor,

when a sounding reference symbol (SRS) transmission on a first timing advance group is scheduled in a subframe, and a physical uplink control channel (PUCCH) transmission and a physical uplink shared channel (PUSCH) transmission on a second timing advance group are scheduled in the subframe,

wherein the processor:

controls the transmitter to transmit the PUCCH and PUSCH in the subframe of the second timing advance group; and

drops the SRS in the subframe of the first timing advance group when the SRS transmission in the subframe of the first timing advance group overlaps the PUCCH transmission and PUSCH transmission on the second timing advance group in a time domain and a total transmission power of the UE exceeds a maximum transmission power configured for the UE in the overlapped portion.

6. The UE of claim 5 , wherein the processor is further configured with a plurality of timing advance groups for the UE.

7. The UE of claim 5 , wherein the SRS transmission in the subframe of the first timing advance group overlaps the PUCCH transmission and PUSCH transmission on the second timing advance group at a symbol level in the subframe.

8. The UE of claim 5 , wherein the PUCCH transmission and PUSCH transmission are scheduled in the subframe of the same component carrier of the second timing advance group.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 1, 2014
From: KIM, DONGCHEOL; CHO, HANGYU; HAN, SEUNGHEE; NOH, MINSEOK
To: LG ELECTRONICS INC.
Reel/Frame 032575/0437 →
Continuity (2)
Provisional Application 61553962 · Nov 1, 2011
Related Publication 20150036601A1 · Feb 5, 2015