IP Library › Granted Patent US 9,476,583
Granted Patent B2
US 9,476,583 · App. 14/578,476 · Granted Oct 25, 2016

Recovery system of waste heat from flue gas

Inventor: Bing Liu (Shanghai, CN)
Assignee: SHANGHAI FUBO EP EQUIPMENT CO., LTD.
F22D1/12F22B1/18F22B1/1892F22D1/04F22D1/08F24D12/02F24H8/00F28D21/001F28F21/082F24D2200/18Y02B30/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,476,583
App. No.
14/578,476
Granted
Oct 25, 2016
Kind
B2
Abstract

A recovery system of waste heat from flue gas. The system includes a first heat exchanger and a second exchanger. The first heat exchanger includes a heat absorption section, a heat release section, and a first pipeline. The second heat exchanger includes a second pipeline including an inlet header and an outlet header. The system further includes a third pipeline. The first heat exchanger is disposed at a relatively high temperature side of a flue, the second heat exchanger is disposed at a relatively low temperature side of the flue, and the first heat exchanger and the second heat exchanger are connected by the third pipeline. The heat absorption section and the heat release section are connected by the first pipeline to form a circulation loop; the heat absorption section is disposed in the flue; the heat release section is disposed in the third pipeline.

Claims (16)

1. A recovery system of waste heat from flue gas, the system comprising:

a) a first heat exchanger, the first heat exchanger comprising a heat absorption section, a heat release section, and a first pipeline;

b) a second exchanger, the second heat exchanger comprising a second pipeline comprising an inlet header and an outlet header; and

c) a third pipeline;

wherein

the first heat exchanger is disposed at a relatively high temperature side of a flue, the second heat exchanger is disposed at a relatively low temperature side of the flue, and the first heat exchanger and the second heat exchanger are connected by the third pipeline;

the heat absorption section and the heat release section are connected by the first pipeline to form a circulation loop; the heat absorption section is disposed in the flue; the heat release section is disposed in the third pipeline; and

when in use, a medium to be heated is introduced to the second exchanger along the third pipeline and the inlet header in sequence for heat exchange, and flows out from the outlet heater of the second exchanger.

2. The system of claim 1 , wherein the third pipeline comprises a first branch and a second branch which are connected in parallel; the heat release section of the first heat exchanger is disposed in the first branch; and the second branch is configured to regulate a flow rate of the medium.

3. The system of claim 2 , wherein a regulating valve is disposed on the second branch of the third pipeline, and the regulating valve is controlled by a control device.

4. The system of claim 3 , wherein a temperature measuring point is disposed on the first pipeline connecting the heat absorption section and the heat release section, and the temperature measuring point transmits a temperature signal to the control device.

5. The system of claim 4 , wherein tube bundles of the second heat exchanger contacting with flue gas comprises plain carbon steel.

6. The system of claim 1 , wherein when in use, the first pipeline of the first heat exchanger is filled with forced circulating water.

7. The system of claim 1 , wherein when in use, the medium to be heated is low temperature feedwater supplied for a boiler.

8. The system of claim 1 , wherein tube bundles of the second heat exchanger contacting with flue gas comprises corrosion resisting steel.

9. The system of claim 1 , wherein tube bundles of the second heat exchanger contacting with flue gas comprises plain carbon steel.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 21, 2014
From: LIU, BING
To: SHANGHAI FUBO EP EQUIPMENT CO., LTD.
Reel/Frame 034562/0878 →
Priority Claims (2)
CN 2012 1 0234270 · Jul 6, 2012 · national
CN 2012 2 0327646 U · Jul 6, 2012 · national
Continuity (2)
Continuation In Part PCTCN2013076917 · Jun 7, 2013
Related Publication 20150107537A1 · Apr 23, 2015