IP Library › Granted Patent US 9,488,748
Granted Patent B2
US 9,488,748 · App. 14/116,126 · Granted Nov 8, 2016

System and method for generating fluid compensated downhole parameters

Inventor: Richard Bloemenkamp (Issy-les-Moulineaux, FR)
Assignee: SCHLUMBERGER TECHNOLOGY CORPORATION
G01V3/20E21B49/005E21B49/10G01V3/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,488,748
App. No.
14/116,126
Granted
Nov 8, 2016
Kind
B2
Abstract

Systems, tools and techniques for generating downhole parameters of a wellbore penetrating a subterranean formation and having a downhole fluid ( 108 ) therein are provided. A downhole tool with sensor pads ( 118 a, 118 b, 118 c, 118 d ) is positioned in the wellbore ( 106 ) for emitting an electrical signal therefrom and for measuring the electrical signal. A downhole fluid unit is provided for generating downhole fluid measurements from the measured electrical signal passing through the downhole fluid and for generating a downhole fluid distribution profile ( 430 ) based on the downhole fluid measurements whereby separation of the downhole fluid may be indicated. A formation unit may be provided for generating formation measurements from the measured electrical signal passing through the subterranean formation. A compensation unit may be provided for analyzing the fluid distribution profile and selectively adjusting the formation measurements based on the analyzed downhole fluid distribution profile whereby a fluid compensated formation parameter is provided.

Claims (24)

1. A system for generating downhole parameters of a wellbore penetrating a subterranean formation and having a downhole fluid therein, comprising:

a downhole tool positionable in the wellbore;

a plurality of sensor pads positionable axially about the downhole tool and spaced at a distance from the downhole tool, wherein each sensor pad of the plurality of sensor pads is configured to emit an electrical signal therefrom and to measure the electrical signal; and

a downhole fluid unit for generating, at different locations along the wellbore, a plurality of downhole fluid measurements from the measured electrical signal passing through the downhole fluid in situ and generating a downhole fluid distribution profile based on the plurality of downhole fluid measurements, an orientation of the wellbore, and a position of the sensor pad corresponding to each of the downhole fluid measurements, whereby separation of the downhole fluid may be indicated.

2. The system of claim 1 , further comprising a formation unit for generating at least one formation measurement from the measured electrical signal passing through the subterranean formation.

3. The system of claim 2 , further comprising a compensation unit for analyzing the plurality of downhole fluid measurements and the downhole fluid distribution profile and selectively adjusting the at least one formation measurement based on the analyzed downhole fluid distribution profile whereby a fluid compensated formation parameter is provided.

4. The system of claim 1 , further comprising at least one sensor for measuring at least one wellbore measurement, wherein the at least one wellbore measurement is one of at least one electrical, acoustic, nuclear, temperature, and pressure.

5. A method for generating downhole parameters of a wellbore penetrating a subterranean formation and having a downhole fluid therein, comprising:

positioning a downhole tool in the wellbore, the downhole tool having a plurality of sensor pads depending therefrom;

positioning the plurality of sensor pads adjacent a wall of the wellbore, in an axial plane of the wellbore, the plurality of sensor pads being spaced at a distance from the downhole tool;

emitting an electrical signal from each of the plurality of sensor pads;

measuring the electrical signal with each of the plurality of sensor pads;

generating, at different locations along the wellbore, a plurality of downhole fluid measurements from the measured electrical signal passing through the downhole fluid as a function of wellbore orientation, the plurality of downhole fluid measurements being generated without intake of the downhole fluid; and

generating a downhole fluid distribution profile based on the plurality of downhole fluid measurements and locations at which the electrical signals are measured.

6. The method of claim 5 , further comprising generating at least one formation measurement from the measured electrical signal passing through the subterranean formation.

7. The method of claim 6 , further comprising generating at least one downhole fluid compensated formation measurement by analyzing the downhole fluid distribution profile and selectively adjusting the at least one formation measurement based on the analyzed downhole fluid distribution profile.

8. The method of claim 7 , wherein the step of generating at least one downhole fluid compensated formation parameter comprises determining if any of the plurality of downhole fluid measurements is outside of an expected range and selectively deleting any of the plurality of downhole fluid measurements that is outside of an expected range.

9. The method of claim 7 , wherein the step of generating at least one downhole fluid compensated formation parameter comprises repeating the steps of the method at a new location in the wellbore.

10. The method of claim 7 , wherein the step of generating at least one downhole fluid compensated formation parameter comprises changing the sensor pads and repeating the steps of the method.

11. The method of claim 5 , further comprising measuring at least one wellbore measurement with at least one sensor.

12. The method of claim 5 , wherein the step of generating a plurality of downhole fluid measurements comprises performing an indirect measurement of the downhole fluid.

13. The method of claim 5 , wherein the step of generating a plurality of downhole fluid measurements is performed over time.

14. The method of claim 5 , wherein the step of generating a downhole fluid distribution profile comprises converting the electrical signal into a fluid loss tangent.

15. The method of claim 5 , wherein the step of generating a downhole fluid distribution profile comprises converting the electrical signal into an oil/water ratio.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 7, 2013
From: BLOEMENKAMP, RICHARD
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 031558/0320 →
Priority Claims (1)
EP 11305573 · May 11, 2011 · regional
Continuity (1)
Related Publication 20140062487A1 · Mar 6, 2014