IP Library › Granted Patent US 9,546,419
Granted Patent B2
US 9,546,419 · App. 13/968,144 · Granted Jan 17, 2017

Method of reducing tungsten film roughness and resistivity

Inventors: Amit Khandelwal (San Jose, CA); Avgerinos V. Gelatos (Redwood City, CA)
Assignee: Applied Materials, Inc.
C23C16/0281C23C16/14C23C16/45525
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,546,419
App. No.
13/968,144
Granted
Jan 17, 2017
Kind
B2
Abstract

Methods for controlling crystal size in bulk tungsten layers are disclosed herein. Methods for depositing a bulk tungsten metal layer can include positioning a substrate with a barrier layer in a processing chamber, forming a tungsten nucleation layer, post-treating the nucleation layer with one or more treatment gas cycles including an activating gas and a purging gas, heating the substrate to a deposition temperature, and depositing a bulk tungsten layer with alternating nitrogen flow on the nucleation layer. The post-treatment cycling can be applied optionally to the bulk metal deposition with alternating nitrogen flow.

Claims (39)

1. A method for depositing a bulk metal, comprising:

positioning a substrate in a processing chamber, the substrate having an barrier layer formed on the surface;

forming a nucleation layer;

treating the nucleation layer with one or more treatment gas cycles, the treatment gas cycles sequentially comprising:

flowing an activating gas; and

flowing a treatment purging gas;

heating the substrate to a deposition temperature; and

depositing a bulk metal layer on the nucleation layer with one or more metal layer deposition cycles, the metal layer deposition cycles sequentially comprising:

depositing a first layer on the nucleation layer by reacting a first processing gas, the first processing gas comprising a tungsten halide, a hydrogen-containing gas, and a nitrogen-containing gas;

purging the first processing gas from the chamber using a first purge gas, the first purge gas comprising the hydrogen-containing gas;

depositing a second layer on the first layer by reacting a second processing gas, the second processing gas comprising the tungsten halide and the hydrogen-containing gas, the second processing gas being free of nitrogen; and

purging the second processing gas from the chamber using a second purge gas, the second purge gas comprising the hydrogen-containing gas.

2. The method of claim 1 , wherein the tungsten halide is selected from the group consisting of tungsten hexafluoride (WF 6 ), tungsten hexachloride (WCl 6 ) and combinations thereof.

3. The method of claim 1 , wherein the hydrogen-containing gas is H 2 .

4. The method of claim 1 , wherein the second purge gas further comprises the nitrogen-containing gas.

5. The method of claim 1 , wherein the nitrogen-containing gas is N 2 .

6. The method of claim 5 , wherein the N 2 gas is less than 1% of the first processing gas.

7. The method of claim 1 , wherein the activating gas is diborane.

8. The method of claim 1 , wherein the treatment purging gas comprises argon gas.

9. The method of claim 1 , wherein the activating gas is flowed into the processing chamber for less than or equal to 10 seconds per cycle.

10. The method of claim 1 , wherein the treatment purging gas flows into the processing chamber for less than or equal to 10 seconds per cycle.

11. The method of claim 1 , wherein the activating gas and the treatment purging gas flow for an equal time period.

12. The method of claim 1 , wherein the activating gas flows for a total time period of less than 22 seconds.

13. The method of claim 1 , wherein the activating gas and the treatment purging gas are maintained at a cycle number, gas flow rate and gas flow time so as to only deposit on the nucleation layer.

14. The method of claim 1 , wherein the pressure is increased during the deposition of the first layer or the second layer.

15. A method for depositing a bulk metal, comprising:

positioning a substrate in a processing chamber;

heating the substrate to a deposition temperature;

depositing a nucleation layer on the surface of the substrate, wherein the nucleation layer comprises tungsten; and

depositing a bulk metal layer on the nucleation layer with one or more metal layer deposition cycles, the metal layer deposition cycles sequentially comprising:

flowing a first processing gas to the substrate to deposit a first layer, the first processing gas comprising tungsten halide, a hydrogen-containing gas and a nitrogen-containing gas;

flowing a first purge gas to the processing chamber, the first purge gas comprising the hydrogen-containing gas;

flowing a second processing gas to the substrate to deposit a second layer, the second processing gas comprising the tungsten halide and the hydrogen-containing gas, the second processing gas being free of nitrogen; and

flowing a second purge gas to the processing chamber, the second purge gas comprising the hydrogen-containing gas.

16. The method of claim 15 , wherein the tungsten halide is selected from the group consisting of tungsten hexafluoride (WF 6 ), tungsten hexachloride (WCl 6 ) and combinations thereof.

17. The method of claim 15 , wherein the hydrogen-containing gas is H 2 .

18. The method of claim 15 , wherein the second purge gas further comprises the nitrogen-containing gas.

19. The method of claim 15 , wherein the nitrogen-containing gas is N 2 .

20. The method of claim 19 , wherein the N 2 gas is less than 1% of the first processing gas.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 29, 2013
From: KHANDELWAL, AMIT; GELATOS, AVGERINOS V.
To: APPLIED MATERIALS, INC.
Reel/Frame 031111/0251 →
Continuity (2)
Provisional Application 61729925 · Nov 26, 2012
Related Publication 20140147589A1 · May 29, 2014