IP Library › Granted Patent US 9,584,269
Granted Patent B2
US 9,584,269 · App. 14/614,558 · Granted Feb 28, 2017

Frequency hopping

Inventors: Robert Arnott (London, GB); Yassin Aden Awad (London, GB)
Assignee: NEC CORPORATION
H04L5/0005H04B1/7143H04B7/2621H04L5/0039H04W72/0446H04W72/0453H04B2201/71323
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,584,269
App. No.
14/614,558
Granted
Feb 28, 2017
Kind
B2
Abstract

A communications node operable to communicate with another communications node over a communications channel having a plurality of frequency resources, the communications node includes data defining a division of the communications channel into a plurality of contiguous sub-bands each having N frequency resources, wherein each frequency resource in a sub-band has a corresponding frequency resource in each of the other sub-bands, data defining an initial allocation of the frequency resources, a resource determination module operable to apply a frequency shift to the initially allocated frequency resources in accordance with a frequency hopping sequence to determine frequency resources to use for communicating information with the other communications node, wherein the frequency shift applied moves the initially allocated frequency resources to corresponding frequency resources in another sub-band, a transceiver for communicating information with the other communications node using the determined frequency resource.

Claims (40)

1. A user equipment comprising:

a transceiver circuit configured to receive, from a base station, information which is related to resource allocation; and

a processor configured to determine a communication resource calculated based on A mod B;

wherein the transceiver circuit is further configured to transmit uplink data using the communication resource,

wherein A is determined based on a first value and a second value, wherein B is determined based on the second value, wherein the first value is obtained from the information, and wherein the second value is determined based on an uplink bandwidth.

2. The user equipment according to claim 1 , wherein A is determined based on a frequency hopping function.

3. The user equipment according to claim 1 , wherein A is determined based on a frequency hopping function multiplied by the second value.

4. The user equipment according to claim 2 , wherein the frequency hopping function is a frequency hopping shift defining a number of sub-frames or slots.

5. The user equipment according to claim 2 , wherein the frequency hopping function uses a pseudo random hopping sequence.

6. The user equipment according to claim 1 , wherein each value calculated by the frequency hopping function is an integer from 0 to S−1, where S is a number of sub-bands.

7. A method of a user equipment, the method comprising:

receiving, from a base station, information which is related to resource allocation;

determining a communication resource calculated based on A mod B;

transmitting uplink data using the communication resource,

wherein A is determined based on a first value and a second value, wherein B is determined based on the second value, wherein the first value is obtained from the information, and wherein the second value is determined based on an uplink bandwidth.

8. The method according to claim 7 , wherein A is determined based on a frequency hopping function.

9. The method according to claim 7 , wherein A is determined based on a frequency hopping function multiplied by the second value.

10. The method according to claim 8 , wherein the frequency hopping function is a frequency hopping shift defining a number of sub frames or slots.

11. The method according to claim 8 , wherein the frequency hopping function uses a pseudo-random hopping sequence.

12. The method according to claim 7 , wherein each value calculated by the frequency hopping function is an integer from 0 to S−1, where S is a number of sub-bands.

13. A communications node comprising:

a transceiver circuit configured to transmit, to a user equipment, information which is related to resource allocation;

a processor configured to determine a communication resource calculated based on A mod B;

wherein the transceiver circuit is further configured to receive uplink data from the user equipment using the communication resource;

wherein A is determined based on a first value and a second value, wherein B is determined based on the second value, and wherein the second value is determined based on an uplink bandwidth.

14. The communications node according to claim 13 , wherein A is determined based on a frequency hopping function.

15. The communications node according to claim 13 , wherein A is determined based on a frequency hopping function multiplied by the second value.

16. The communications node according to claim 14 , wherein the frequency hopping function is a frequency hopping shirt defining a number of sub-frames or slots.

17. The communications node according to claim 14 , wherein the frequency hopping function uses a pseudo random hopping sequence.

18. The communications node according to claim 13 , wherein each value calculated by the frequency hopping function is an integer from 0 to S−1, where S is a number of sub-bands.

19. A method of a communications node, the method comprising:

transmitting, to a user equipment, information which is related to resource allocation;

determining a communication resource calculated based on A mod B;

receiving uplink data from the user equipment using the communication resource,

wherein A is determined based on a first value and a second value, wherein B is determined based on the second value, and wherein the second value is determined based on an uplink bandwidth.

20. The method according to claim 19 , wherein A is determined based on a frequency hopping function.

21. The method according to claim 19 , wherein A is determined based on a frequency hopping function multiplied by the second value.

22. The method according to claim 20 , wherein the frequency hopping function is a frequency hopping shift defining a number of sub-frames or slots.

23. The method according to claim 20 , wherein the frequency hopping function uses a pseudo random hopping sequence.

24. The method according to claim 19 , wherein each value calculated by the frequency hopping function is an integer from 0−S−1, where S is a number of sub-bands.

Priority Claims (1)
GB 0702190 · Feb 5, 2007 · national
Continuity (4)
Continuation 14044821 · Oct 2, 2013
Continuation 13414379 · Mar 7, 2012
Continuation 12521298
Related Publication 20150188605A1 · Jul 2, 2015