IP Library › Granted Patent US 9,603,141
Granted Patent B2
US 9,603,141 · App. 14/679,913 · Granted Mar 21, 2017

Physical downlink control channel and physical hybrid automatic repeat request indicator channel enhancements

Inventors: Runhua Chen (Plano, TX); Eko N. Onggosanusi (Allen, TX); Vikram Chandrasekhar (Dallas, TX); Anthony Edet Ekpenyong (Houston, TX)
Assignee: TEXAS INSTRUMENTS INCORPORATED
H04W72/042H04J11/0033H04L5/0023H04L5/0053
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,603,141
App. No.
14/679,913
Granted
Mar 21, 2017
Kind
B2
Abstract

A wireless transmission system included at least one user equipment and a base station. The base station is operable to form a downlink control information block, modulate the downlink control information, precode the modulated downlink control information, and transmit the precoded, modulated downlink control information on at least one demodulation reference signal antenna port to the at least one user equipment. The precoded, modulated downlink control information is mapped to a set of N1 physical resource block pairs in a subframe from an orthogonal frequency division multiplexing symbol T1 to and orthogonal frequency division multiplexing symbol T2.

Claims (18)

1. A method of operating a user equipment (UE), comprising:

receiving a downlink (DL) assignment on a Demodulation Reference Signal (DMRS)-based physical downlink control channel (D-PDCCH) and if the user equipment (UE) detects via physical control format indicator channel (PCFICH) on its legacy control region that the number of OFDM symbols is strictly smaller than the starting symbol for D-PDCCH, then the user equipment (UE) shall assume one of the two following embodiments for determining the resources on which its PDSCH is mapped:

when the DL-assignment on D-PDCCH overlaps with the DL assignment for PDSCH, the user equipment (UE) assumes that in the overlapping PRBs, the PDSCH is also present on the OFDM symbols between the last symbol of the legacy PDCCH region and the first symbol of the D-PDCCH; and

when the DL-assignment on D-PDCCH overlaps with the DL assignment for PDSCH, the user equipment (UE) assumes that its PDSCH is also present on the OFDM symbols between the last symbol of the legacy PDCCH region and the first symbol of the D-PDCCH.

2. A method of operating a user equipment (UE), comprising:

receiving a precoded downlink (DL) control information transmitted on at least one demodulation reference signal antenna port;

the precoded, modulation downlink control information is received on a set of N1 physical resource block pairs in a subframe from an orthogonal frequency division multiplexing symbol T1 to an orthogonal frequency division multiplexing symbol T2, and the user equipment is semi-statically configured by higher layer signaling with the orthogonal frequency division multiplexing symbol T1.

3. The method of claim 2 , wherein the downlink control information is a downlink assignment or an uplink grant.

4. The method of claim 2 , wherein the user equipment receives the precoded, modulated downlink control information on one demodulation reference signal antenna port.

5. The method of claim 2 , wherein the user equipment receives the precoded, modulated downlink control information on more than one demodulation reference signal antenna port.

6. The method of claim 2 , wherein the at least one demodulation reference signal antenna port is configured by higher layer signaling.

7. The method of claim 2 , wherein the user equipment (UE) is configured by higher layer signaling with a scrambling sequence to demodulate downlink control information transmitted on the at least one demodulation reference signal antenna port.

8. A method of operating a user equipment (UE), comprising:

receiving precoded modulated downlink control information transmitted on at least one demodulation reference signal antenna port, wherein the precoded modulated downlink control information is mapped to a set of N1 physical resource block pairs in a subframe from an orthogonal frequency division multiplexing symbol T1 to an orthogonal frequency division multiplexing symbol T2; and

semi-statically configuring the user equipment using higher layer signaling with the orthogonal frequency division multiplexing symbol T1.

9. The method of operating a user equipment (UE) of claim 8 , wherein the UE is further enabled to demodulate the precoded, modulated downlink control information on more than one demodulation reference signal antenna ports.

10. The method of operating a user equipment (UE) of claim 8 , wherein the UE is semi-statically configured by higher layer signaling with a scrambling sequence to demodulate said downlink control information transmitted on the at least one demodulation reference signal antenna port.

11. The method of operating a user equipment (UE) of claim 8 , wherein the UE is configured by higher layer signaling with the set of N1 physical resource block pairs.

Continuity (8)
Continuation 13458410 · Apr 27, 2012
Provisional Application 61479655 · Apr 27, 2011
Provisional Application 61481840 · May 3, 2011
Provisional Application 61483848 · May 9, 2011
Provisional Application 61525315 · Aug 19, 2011
Provisional Application 61542962 · Oct 4, 2011
Provisional Application 61558196 · Nov 10, 2011
Related Publication 20150215916A1 · Jul 30, 2015