IP Library › Granted Patent US 9,822,639
Granted Patent B2
US 9,822,639 · App. 15/300,098 · Granted Nov 21, 2017

Methods for formulating a cement slurry for use in a subterranean salt formation using geometric modeling

Inventors: Siva Rama Krishna Jandhyala (Pune, IN); Krishna M. Ravi (Kingwood, TX)
Assignee: HALLIBURTON ENERGY SERVICES, INC.
E21B49/003C09K8/40E21B33/13G01V1/40G06F9/455
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,822,639
App. No.
15/300,098
Granted
Nov 21, 2017
Kind
B2
Abstract

Methods including experimentally determining a salt creep profile for a single salt or intercalated salts in a subterranean formation, designing a proposed cement slurry based on the salt creep profile, experimentally determining whether the proposed cement slurry is capable of forming a wellbore load resistant cement sheath based on actual thermal and thermo-mechanical properties of the proposed cement slurry, theoretically determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath by designing an electronic, cross-section geometric model of the subterranean salt formation and simulating a condition of the wellbore loads on the cured proposed cement slurry using the geometric model, establishing a final cement slurry capable of forming the wellbore load resistant cement sheath, and performing a final cementing operation with the final cement slurry in the subterranean salt formation.

Claims (56)

1. A method comprising:

(a) providing a wellbore in a subterranean salt formation, wherein the subterranean salt formation comprises a single salt at a first location;

(b) experimentally determining a salt creep profile for the single salt at the first location in the wellbore in the subterranean formation;

(c) designing a proposed cement slurry based on the salt creep profile, the proposed cement slurry having a rheology profile,

wherein the proposed cement slurry is designed for use in a proposed cementing operation involving forming a wellbore load resistant cement sheath within an annulus between the subterranean salt formation and casing, and wherein the wellbore load resistant cement sheath is resistant to wellbore loads;

(d) experimentally determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first location based on actual thermal and thermo-mechanical properties of the proposed cement slurry;

(e) theoretically determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first location, the theoretical determination comprising:

(e)(1) designing an electronic, cross-section geometric model of the subterranean salt formation at the first location, wherein the geometric model represents the subterranean salt formation, the casing, and the proposed cement slurry after curing, and

(e)(2) simulating a plane-strain condition of the wellbore loads on the cured proposed cement slurry at the first location in the subterranean formation using the geometric model,

(f) establishing a final cement slurry capable of forming the wellbore load resistant cement sheath; and

(g) performing a final cementing operation with the final cement slurry in the subterranean salt formation.

2. The method of claim 1 , wherein the salt creep profile in step (b) is experimentally determined by a method selected from the group consisting of:

(b1) obtaining at least one wellbore core sample of the wellbore in the subterranean formation at the first location, and performing a core sample salt creep load measurement using the wellbore core sample,

(b2) performing a downhole salt creep load measurement at the first location in the wellbore in the subterranean formation,

(b3) obtaining an offset well salt creep load measurement and performing a parametric analysis thereon, wherein the offset well and the wellbore in the subterranean salt formation are located in a same oil field,

and any combination thereof.

3. The method of claim 1 , wherein whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath in step (d) is experimentally determined by a method selected from the group consisting of:

(d1) curing the proposed cement slurry, and performing an ultrasonic cement analyzer test on the cured proposed cement slurry,

(d2) curing the proposed cement slurry, and performing uniaxial and triaxial compression tests on the cured proposed cement slurry,

and any combination thereof.

4. The method of claim 1 , wherein the plane-strain condition of the wellbore loads on the cured proposed cement slurry at the first location in the subterranean formation using the geometric model in step (e)(2) is simulated based the wellbore loads and one or both of: theoretical thermal and thermo-mechanical properties of the cured proposed cement slurry, or the actual thermal and thermo-mechanical properties of the cured proposed cement slurry in step (d).

5. The method of claim 4 , wherein step (e) is performed before step (d), wherein step (e)(2) is simulated based on the theoretical thermal and thermo-mechanical properties, and further comprising repeating a second step (e) after step (d) wherein the second step (e) comprises step (e)(2) of simulation based on the actual theoretical thermal and thermo-mechanical properties in step (d).

6. The method of claim 1 , further comprising either performing step (d) before step (e), or performing step (e) before step (d).

7. The method of claim 1 , further comprising manipulating the proposed cement slurry after step (d), and repeating steps (d) through (e) until the proposed cement slurry is capable of forming the wellbore load resistant cement sheath.

8. The method of claim 1 , further comprising manipulating the proposed cement slurry after step (e), and repeating steps (d) through (e) until the proposed cement slurry is capable of forming the wellbore load resistant cement sheath.

9. The method of claim 1 , further comprising a tubular extending into the wellbore in the subterranean salt formation, and a pump fluidly coupled to the tubular; and

wherein step (g) is performed by introducing the final cement slurry into the wellbore through the tubular.

10. A method comprising:

(a) providing a wellbore in a subterranean salt formation, wherein the subterranean salt formation comprises intercalated salts along a first length of the wellbore;

(b) experimentally determining a salt creep profile for the intercalated salts at the first length of the wellbore in the subterranean formation;

(c) designing a proposed cement slurry based on the salt creep profile, the proposed cement slurry having a rheology profile,

wherein the proposed cement slurry is designed for use in a proposed cementing operation involving forming a wellbore load resistant cement sheath within an annulus between the subterranean salt formation and casing, and wherein the wellbore load resistant cement sheath is resistant to wellbore loads;

(d) experimentally determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first length based on actual thermal and thermo-mechanical properties of the proposed cement slurry;

(e) theoretically determining whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath at the first length, the theoretical determination comprising:

(e)(1) designing an electronic, longitudinal geometric model of the subterranean salt formation at the first length, wherein the geometric model represents the subterranean salt formation, the casing, and the proposed cement slurry after curing, and

(e)(2) simulating an axisymmetric condition or a three-dimensional condition of the wellbore loads on the cured proposed cement slurry at the first location in the subterranean formation using the geometric model,

(f) establishing a final cement slurry capable of forming the wellbore load resistant cement sheath; and

(g) performing a final cementing operation with the final cement slurry in the subterranean salt formation.

11. The method of claim 10 , wherein the salt creep profile in step (b) is experimentally determined by a method selected from the group consisting of:

(b1) obtaining at least one wellbore core sample of the wellbore in the subterranean formation at the first length, and performing a core sample salt creep load measurement using the wellbore core sample,

(b2) performing a downhole salt creep load measurement at the first length in the wellbore in the subterranean formation,

(b3) obtaining an offset well salt creep load measurement and performing a parametric analysis thereon, wherein the offset well and the wellbore in the subterranean salt formation are located in a same oil field,

and any combination thereof.

12. The method of claim 10 , wherein whether the proposed cement slurry is capable of forming the wellbore load resistant cement sheath in step (d) is experimentally determined by a method selected from the group consisting of:

(d1) curing the proposed cement slurry, and performing an ultrasonic cement analyzer test on the cured proposed cement slurry,

(d2) curing the proposed cement slurry, and performing uniaxial and triaxial compression tests on the cured proposed cement slurry,

and any combination thereof.

13. The method of claim 10 , wherein the axisymmetric condition or the three-dimensional condition of the wellbore loads on the cured proposed cement slurry at the first length in the subterranean formation using the geometric model in step (e)(2) is simulated based the wellbore loads and one or both of: theoretical thermal and thermo-mechanical properties of the cured proposed cement slurry, or the actual thermal and thermo-mechanical properties of the cured proposed cement slurry in step (d).

14. The method of claim 13 , wherein step (e) is performed before step (d), wherein step (e)(2) is simulated based on the theoretical thermal and thermo-mechanical properties, and further comprising repeating a second step (e) after step (d) wherein the second step (e) comprises step (e)(2) of simulation based on the actual theoretical thermal and thermo-mechanical properties in step (d).

15. The method of claim 10 , wherein the electronic, longitudinal geometric model is a three-dimensional model.

16. The method of claim 10 , further comprising either performing step (d) before step (e), or performing step (e) before step (d).

17. The method of claim 10 , further comprising manipulating the proposed cement slurry after step (d), and repeating steps (d) through (e) until the proposed cement slurry is capable of forming the wellbore load resistant cement sheath.

18. The method of claim 10 , further comprising manipulating the proposed cement slurry after step (e), and repeating steps (d) through (e) until the proposed cement slurry is capable of forming the wellbore load resistant cement sheath.

19. The method of claim 10 , further comprising repeating steps (b) through (e) at at least a second length of the wellbore in subterranean salt formation, wherein the electronic, longitudinal geometric model designed in step (e)(1) represents the first length and at least the second length.

20. The method of claim 10 , further comprising a tubular extending into the wellbore in the subterranean salt formation, and a pump fluidly coupled to the tubular; and

wherein step (g) is performed by introducing the final cement slurry into the wellbore through the tubular.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 28, 2016
From: JANDHYALA, SIVA RAMA KRISHNA; RAVI, KRISHNA M.
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 039878/0521 →
Continuity (2)
Continuation In Part PCTUS2014040245 · May 30, 2014
Related Publication 20170183964A1 · Jun 29, 2017