IP Library Granted Patent US 9,840,900
Granted Patent B2
US 9,840,900 · App. 14/604,681 · Granted Dec 12, 2017

Process for inhibiting flow of fracturing fluid in an offset wellbore

Inventors: Philip Martin Snider (Tomball, TX); David Sanford Wesson (Fort Worth, TX)
Assignee: PETROVATIONS LLC
E21B43/26E21B34/10E21B47/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,840,900
App. No.
14/604,681
Granted
Dec 12, 2017
Kind
B2
Abstract

Processes and systems for inhibiting the flow of fracturing fluid through one or more subterranean wells offset from the subterranean well being fractured. A fracturing fluid is injected under pressure via a first well penetrating and in fluid communication with a subterranean region of interest so as to fracture the subterranean region. A second fluid is positioned within one or more second subterranean wells penetrating and in fluid communication with the subterranean region. Each second well is equipped with a standing valve that is seated by the second fluid in each second well. The pressure of the second fluid may be monitored and the pressure applied to the second fluid at the surface may be increased upon determining an increase in pressure during the monitoring step.

Claims (22)

1. A subterranean fracturing process comprising:

injecting a fracturing fluid under pressure via a first well penetrating and in fluid communication with a subterranean region of interest so as to fracture the subterranean region; and

positioning a second fluid within a second well equipped with a standing valve and penetrating and in fluid communication with the subterranean region, the second fluid seating the standing valve and inhibiting flow of the fracturing fluid up the second well.

2. The subterranean fracturing process of claim 1 wherein the hydrostatic weight of the second fluid is sufficient to seat the standing valve.

3. The subterranean fracturing process of claim 2 further comprising:

monitoring the second fluid to determine any increase in surface pressure in the second well due to flow of the fracturing fluid.

4. The subterranean fracturing process of claim 3 further comprising:

increasing pressure applied to the second fluid at the surface upon determining an increase of the surface pressure during said step of monitoring to ensure the standing valve is seated.

5. The subterranean fracturing process of claim 1 wherein the second fluid is positioned within the second well by injection from the surface at a pressure deemed sufficient to seat the standing valve.

6. The subterranean fracturing process of claim 5 further comprising:

monitoring the second fluid to determine any increase in surface pressure in the second well due to flow of the fracturing fluid.

7. The subterranean fracturing process of claim 6 further comprising:

increasing pressure applied to the second fluid at the surface upon determining an increase of the surface pressure during the step of monitoring to ensure the standing valve is seated.

8. The subterranean fracturing process of claim 1 further comprising:

monitoring wellbore pressure within the second well.

9. The subterranean fracturing process of claim 8 wherein the step of positioning the fluid into the second well is initiated upon sensing an increase of the wellbore pressure during the step of monitoring.

10. The subterranean fracturing process of claim 8 wherein the pressure at which the second fluid is positioned within the second well is adjusted in response to the step of monitoring wellbore pressure.

11. The subterranean fracturing process of claim 1 wherein the step of injecting the fracturing fluid under pressure via the first well is commenced prior to the step of positioning the second fluid into the second well.

12. The subterranean fracturing process of claim 11 further comprising:

monitoring the second fluid to determine any increase in surface pressure in the second well due to flow of the fracturing fluid into the second well.

13. The subterranean fracturing process of claim 12 further comprising:

increasing pressure applied to the second fluid at the surface upon determining an increase of the surface pressure during said step of monitoring to ensure the standing valve is seated.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 6, 2015
From: SNIDER, PHILIP MARTIN; WESSON, DAVID S
To: PETROVATIONS LLC
Reel/Frame 034902/0352 →
Continuity (2)
Provisional Application 61931575 · Jan 25, 2014
Related Publication 20150211347A1 · Jul 30, 2015