IP Library Granted Patent US 9,883,259
Granted Patent B2
US 9,883,259 · App. 14/987,134 · Granted Jan 30, 2018

Synchronized metrology in power generation and distribution networks

Inventors: Geoffrey B. Rhoads (West Linn, OR); Conrad Eustis (Portland, OR); Tyler J. McKinley (West Linn, OR)
Assignee: Digimarc Corporation
H04Q9/00G01R19/175G01R19/2513G01R29/18G06Q50/06G08C19/12H04Q9/04G01D4/002G01R22/10H04Q2209/60Y02B90/241Y02B90/246Y02B90/248Y02E60/728Y04S10/265Y04S20/32Y04S20/42Y04S20/48Y04S20/52
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,883,259
App. No.
14/987,134
Granted
Jan 30, 2018
Kind
B2
Abstract

Phasor Measurement Units (PMUs) tend to be specialized and expensive—relegated to only key points in power distribution networks, and are generally reliant on GPS technology. The present disclosure details how any smart meter—using wireless communication—can perform sub-microsecond-grade synchrophasor measurements. Other aspects concern smart meter-based determination of A, B or C phase of the tri-phase power network. This can involve count-stamp enabling message packets sent to and/or from a smart meter, and then associating such count-stamps to local measurements of power phase by a metrology unit. Once a network of such enabled smart meters and other devices is formed, sub-microsecond metropolitan-wide and entire region-wide synchronizing time standard can calibrate local measurements of power phase, where simple A, B and C phase determination is one low hanging fruit application of such. Low cost aggregate monitoring of metropolitan-wide synchrophasors promises a next chapter of importance for that relatively recent art.

Claims (31)

1. A method useful in determining an electric power phase relationship between two devices, a first device comprising a power meter device connected to a power distribution system and a second device comprising another device connected to the power distribution system, the method characterized by processing one or more messages received from the second device, together with zero crossing data generated by the first device, to determine relative timing between zero crossings of power signals sensed at said devices, wherein the message received from the second device is clock-stamped by the first device.

2. The method of claim 1 that further includes, from said relative timing, determining whether the power signal at the first device is (a) in phase with the power signal at the second device; (b) leads the power signal at the second device by 120 degrees; or (c) lags the power signal at the second device by 120 degrees.

3. The method of claim 1 in which both of said devices comprise power meter devices.

4. The method of claim 1 that includes count-stamping the message(s) received from the second device, by reference to clock counts from a free-running clock in the first device that runs at 100 KHz or more.

5. The method of claim 1 that includes determining relative timing between the zero crossing measurements to an accuracy of better than 25 microseconds.

6. The method of claim 1 wherein at least one of said devices is devoid of a GPS receiver.

7. The method of claim 1 wherein the message received from the second device is clock-stamped.

8. The method of claim 7 in which the message received from the second device is clock-stamped by the second device.

9. The method of claim 7 in which the message received from the second device is clock-stamped by the second device to indicate a zero-crossing event at the second device.

10. A method of determining phase relationship among power meters, the method comprising the acts:

collecting count stamped messages transmitted between nodes in a network including at least first and second power meters, the messages including zero crossing measurements of a power signal sensed at a corresponding power meter;

from the count stamped messages, determining relative timing among clocks within the power meters; and

from the relative timing and zero crossing measurements, determining relative phases between the power meters;

wherein the power meters include a first clock for zero crossing measurements and a second clock for count-stamping a message communicated with another node in the network, and the method further includes determining relative timing between said first and second clocks.

11. The method of claim 10 wherein the zero crossing measurements within the first power meter and the count-stamping of a message by the first power meter are made relative to a common clock within the first power meter.

12. A power meter comprising:

a metrology unit for measuring zero crossing of a power signal; and

a communication unit, in communication with the metrology unit for collecting zero crossing measurements and communicating count stamped messages including the collected zero crossing measurements to a remote node for determining relative phase between the power meter and another power meter;

wherein the communication unit is in communication with a local clock for count-stamping messages upon transmission.

13. A power meter comprising:

a metrology unit for measuring zero crossing of a power signal; and

a communication unit, in communication with the metrology unit for collecting zero crossing measurements and communicating count stamped messages including the collected zero crossing measurements to a remote node for determining relative phase between the power meter and another power meter;

wherein the communication unit is in communication with a local clock for count-stamping messages upon receipt.

14. A power meter comprising:

a metrology unit for measuring zero crossing of a power signal; and

a communication unit, in communication with the metrology unit for collecting zero crossing measurements and communicating count stamped messages including the collected zero crossing measurements to a remote node for determining relative phase between the power meter and another power meter;

wherein the communication unit is in communication with a second power meter for receiving count-stamped messages and for determining phase relative to the second power meter.

15. A power meter comprising:

a metrology unit for measuring zero crossing of a power signal;

a communication unit, in communication with the metrology unit for collecting zero crossing measurements and communicating count stamped messages including the collected zero crossing measurements to a remote node for determining relative phase between the power meter and another power meter; and

a first clock for providing time for the zero crossing and a second clock for count-stamping the messages.

Assignments (3)
ARTICLES OF CONVERSION Recorded Jun 19, 2026
From: DIGIMARC CORPORATION
To: DIGIMARC LLC
Reel/Frame 075863/0211 →
ARTICLES OF AMENDMENT OFTHE ARTICLES OF ORGANIZATION OF DIGIMARC LLC Recorded Jun 19, 2026
From: DIGIMARC LLC
To: DMRC LLC
Reel/Frame 075863/0266 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 12, 2016
From: RHOADS, GEOFFREY B.; EUSTIS, CONRAD; MCKINLEY, TYLER J.
To: DIGIMARC CORPORATION
Reel/Frame 039425/0246 →
Continuity (8)
Continuation In Part 14220838 · Mar 20, 2014
Continuation In Part 13765404 · Feb 12, 2013
Continuation In Part PCTUS2012050994 · Aug 15, 2012
Provisional Application 61803540 · Mar 20, 2013
Provisional Application 61727050 · Nov 15, 2012
Provisional Application 61727293 · Nov 16, 2012
Provisional Application 61575178 · Aug 15, 2011
Related Publication 20160198245A1 · Jul 7, 2016