IP Library › Granted Patent US 9,909,202
Granted Patent B2
US 9,909,202 · App. 14/268,464 · Granted Mar 6, 2018

Apparatus and methods for slurry aluminide coating repair

Inventors: Liming Zhang (Greer, SC); Jere Allen Johnson, Jr. (Greenville, SC)
Assignee: General Electric Company
C23C10/08C23C10/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,909,202
App. No.
14/268,464
Granted
Mar 6, 2018
Kind
B2
Abstract

Methods for deposition of an aluminide coating on an alloy component positioned within a coating compartment of a retort chamber are provided. According to the method, the coating compartment is purged with an inert gas via a first gas line; a positive pressure is created within the coating compartment utilizing the inert gas; the coating compartment is heated to a deposition temperature; and at least one reactant gas is introduced into the coating compartment while at the positive pressure and the deposition temperature to form an aluminide coating on a surface of the alloy component. Retort coating apparatus are also provided.

Claims (21)

1. A method for deposition of an aluminide coating on an alloy component positioned within a coating compartment of a retort chamber, the method comprising:

purging the coating compartment with an inert gas via a first gas line;

creating a positive pressure within the coating compartment utilizing the inert gas, wherein the positive pressure within the coating compartment is about 1.05 bar to about 2.0 bar;

heating the coating compartment to a deposition temperature; and

introducing at least one reactant gas into the coating compartment while at the positive pressure and the deposition temperature to form an aluminide coating on a surface of the alloy component.

2. The method of claim 1 , further comprising, prior to purging the coating compartment:

placing the alloy component within the coating compartment of the retort chamber; and

thereafter, closing the coating compartment of the retort chamber with an insulated cover such that the coating compartment is atmospherically isolated.

3. The method of claim 1 , further comprising:

controlling the positive pressure within the coating compartment with a pressure control system, wherein the pressure control system comprises: at least one gas inlet and associated inlet valve; and an exhaust outlet and associated outlet valve.

4. The method of claim 3 , wherein the outlet valve is a release valve configured to exhaust gas from the coating compartment at a predetermined pressure.

5. The method of claim 1 , wherein the positive pressure within the coating compartment is about 1.1 bar to about 1.5 bar.

6. The method of claim 1 , wherein the deposition temperature of about 650° C. to about 1100° C.

7. The method of claim 1 , wherein heating the coating compartment is achieved using a plurality of heating elements positioned to heat the coating compartment.

8. The method of claim 7 , wherein the plurality of heating elements are positioned within furnace walls of the coating compartment.

9. The method of claim 2 , wherein the first gas line passes through an insulated cover.

10. The method of claim 3 , wherein the pressure control system is in communication with the inlet valve so as to control the pressure within the retort chamber.

11. The method of claim 3 , wherein the pressure control system is in communication with the outlet valve so as to control the pressure within the retort chamber.

12. The method of claim 11 , wherein the outlet valve is a release valve configured to exhaust gas from the coating compartment upon reaching a predetermined pressure controllable by the pressure control system.

13. The method of claim 12 , wherein the predetermined pressure is about 1.05 bar to about 2.0 bar.

14. The method of claim 12 , wherein the predetermined pressure is about 1.1 bar to about 1.5 bar.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 2, 2014
From: ZHANG, LIMING; JOHNSON, JERE ALLEN, JR.
To: GENERAL ELECTRIC COMPANY
Reel/Frame 032811/0561 →
Continuity (1)
Related Publication 20150315694A1 · Nov 5, 2015