IP Library Granted Patent US 9,928,467
Granted Patent B2
US 9,928,467 · App. 14/630,449 · Granted Mar 27, 2018

Apparatus for forecasting water demand

Inventor: Min Gu Kang (Seoul, KR)
Assignee: LSIS CO., LTD.
G06N99/005
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,928,467
App. No.
14/630,449
Granted
Mar 27, 2018
Kind
B2
Abstract

There is provided an apparatus for forecasting water demand of a waste system using an automation system. The apparatus for estimating water demand includes a water demand estimation setting unit configured to collect user input data, a control unit configured to collect the record data and the user input data from the SCADA system, perform a learning process on each of a plurality of algorithm combination groups including at least one algorithm to select any one algorithm combination group, and input the record data and the user input data to the selected algorithm combination group to calculate water demand estimation data, a storage unit configured to store the record data collected from the SCADA system, store the user input data, and store the water demand estimation data, and a water demand estimation output unit configured to output the calculated water demand estimation data.

Claims (36)

1. An apparatus for estimating water demand, the apparatus comprising:

an estimation unit configured to obtain a preset value input by a user;

a control unit configured to:

obtain record data in response to a user request;

set a limit value range of the obtained record data having an upper limit and a lower limit;

compare a value of the obtained record data with the upper limit and lower limit in order to extract normal data from the obtained record data within the set limit value range;

set the extracted normal data as water demand estimation data;

perform a learning process on each of a plurality of algorithm combination groups including at least one algorithm in order to select one of the plurality of algorithm combination groups; and

calculate water demand estimation data by inputting the obtained record data and preset value to the selected one of the plurality of algorithm combination groups;

a storage unit configured to store the obtained record data, the obtained preset value, and the calculated water demand estimation data; and

an output unit configured to output the calculated water demand estimation data,

wherein the control unit is further configured to:

divide the obtained record data into a plurality of periods;

estimate water demand of each of the plurality of periods; and

estimate final water demand by combining the estimated water demand of each of the plurality of periods.

2. The apparatus of claim 1 , wherein the control unit includes:

a data collecting unit configured to obtain the record data from a SCADA system;

a data processing unit configured to set the limit value range, to compare the value of the obtained record data with the upper limit and the lower limit and extract the normal data, and to set the extracted normal data as the water demand estimation data;

a combining unit configured to generate the plurality of algorithm combination groups and select the one of the plurality of algorithm combination groups; and

a calculating unit configured to calculate the water demand estimation data.

3. The apparatus of claim 2 , wherein the combining unit is further configured to:

set a number of algorithms to be included in at least one of the plurality of algorithm combination groups;

perform the learning process on each of the plurality of algorithm combination groups including algorithms combined according to the set number; and

extract one of the plurality of algorithm combination groups.

4. The apparatus of claim 3 , wherein the combining unit is further configured to:

assign a weighted value of each of the algorithms according to the learning process; and

extract an algorithm combination having an uppermost weight value or an algorithm combination having a smallest error value with respect to reference estimation data.

5. The apparatus of claim 2 , wherein the control unit further includes a verifying unit configured to verify the calculated water demand estimation data.

6. The apparatus of claim 2 , wherein the control unit further includes:

a compensating unit configured to assign a weighted value to the calculated water demand estimation data within a threshold range period from a current time; and

compensate an error related to hourly estimation result data.

7. The apparatus of claim 1 , wherein the storage unit includes:

a record storage unit configured to store obtained data;

a setting storage unit configured to store obtained preset value; and

an estimation data storage unit configured to store the calculated water demand estimation data.

8. The apparatus of claim 7 , wherein the control unit obtains the data periodically from a SCADA server or periodically obtains data collected in real time as the record data.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 24, 2015
From: KANG, MIN GU
To: LSIS CO., LTD.
Reel/Frame 035020/0916 →
Priority Claims (1)
KR 10-2014-0041853 · Apr 8, 2014 · national
Continuity (1)
Related Publication 20150286950A1 · Oct 8, 2015