IP Library Granted Patent US 9,938,600
Granted Patent B2
US 9,938,600 · App. 14/719,532 · Granted Apr 10, 2018

Manufacturing a hardened formed part

Inventors: Thomas Muhr (Attendorn, DE); Jorg Dieter Brecht (Olpe, DE); Christoph Schneider (Lennestadt-Elspe, DE); Philip Beiter (Bergisch-Gladbach, DE)
Assignee: Muhr und Bender KG
C21D8/0278B32B15/01C21D8/02C21D9/52C21D9/54C23C2/02C25D5/026C25D5/16C25D5/18C25D5/34C25D5/36C25D17/00C25D17/007C25D17/008C25D17/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,938,600
App. No.
14/719,532
Granted
Apr 10, 2018
Kind
B2
Abstract

A hardened formed part is manufactured with the steps: producing a blank from a hardenable strip material; heating of the blank to an austenitization temperature; forming and hardening of the blank to a hardened formed part; cleaning the hardened formed part; coating the hardened formed part with a metallic coating in an dipping bath with an electrolyte solution, wherein during the coating process, at least one auxiliary element is used in the dipping bath, such, that the deposition of the coating is partially influenced. A plant is used for manufacturing a hardened formed part.

Claims (19)

1. A method for manufacturing a hardened formed part, comprising:

producing a blank from a hardenable strip material;

heating the blank to an austenitisation temperature;

forming and hardening the blank to a hardened formed part;

cleaning the hardened formed part; and

coating the hardened formed part with a metallic coating in a dipping bath with an electrolytic solution, wherein during coating at least one auxiliary element is provided in the dipping bath and positioned relative to the hardened formed part, such that a deposition of the coating on the hardened formed part is locally influenced by the at least one auxiliary element.

2. The method of claim 1 , wherein the step of coating is carried out such that an average coating thickness of at least 3 μm (micrometers), and at a maximum of 30 μm, is applied to the hardened formed part.

3. The method of claim 1 , wherein the at least one of the auxiliary element is electrically conductive and is subjected to an electric current during the step of coating.

4. The method of claim 1 , wherein several auxiliary elements made from an electrically conductive material are provided, the elements being subjected to different electric currents during the step of coating.

5. The method of claim 1 , wherein the step of coating is carried out such that the electrolyte solution is subjected to a pulsed current.

6. The method of claim 1 , wherein the at least one of the auxiliary element is electrically non-conductive and is arranged in the immersion bath during the coating such that the deposition of coating is partially inhibited.

7. The method of claim 1 , wherein the at least one of the auxiliary element is accommodated in a holding device, further wherein the holding device is movable in the immersion bath.

8. The method of claim 1 , further comprising moving the auxiliary element after dipping the hardened formed part into the dipping bath from a resting position, in which the auxiliary element is distanced from the hardened formed part, into a treatment position, in which the auxiliary element approximated to the hardened formed part.

9. The method of claim 1 , wherein during the step of coating a relative flow is generated between the hardened formed part and the electrolyte solution.

10. The method of claim 1 , wherein the step of coating is carried out with a coating material that has a mass portion of zinc of at least 50%.

11. The method of claim 1 , wherein the hardened formed part is coated for a maximum of 20 minutes.

12. The method of claim 1 , wherein the blank is produced such that portions with different thicknesses are formed by at least one of flexible rolling of the strip material and subsequently cutting the blank from the flexible rolled strip material, and connecting a first partial blank with a first thickness and a second partial blank with a second thickness deviating from the first thickness.

13. The method of claim 1 , wherein, after the step of coating, a maximum amount of 0.7 ppm of diffusible hydrogen is contained in the hardened formed part.

14. The method of claim 1 , wherein the step of cleaning of the hardened formed part is carried out by at least one of anodic etching, blasting and brushing.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 23, 2015
From: MUHR, THOMAS; BRECHT, JORG DIETER; SCHNEIDER, CHRISTOPH; BEITER, PHILIP
To: MUHR UND BENDER KG
Reel/Frame 035881/0505 →
Priority Claims (1)
DE 10 2014 210 008 · May 26, 2014 · national
Continuity (1)
Related Publication 20150337406A1 · Nov 26, 2015